A CMS Energy Company Palisades Nuclear Plant 21780 Blue Star Memorial Highway May 1, 1998 US NuClear Regulatory Commission Document Control Desk Washington. DC 20555 Covert, Ml 49043 LICENSEE REPORT OF MONTHLY OPERATING DAT A DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April 1998.
If you have any questions or concerns, please contact me at (616) 764-3179.
Sincerely,
~~
R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports PDR ADOCK 05000255 9805140334 980430
~*
R PDR I I I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 5Q-255 UNIT Psili:H!Q~§ DATE Q5LQ1 L98 COMPLETED BY BFSs;;bmidl MONTH April TELEPHONE (6161764-2185 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
7~Ur
- 17.
7f~O
- 2.
ZQJ
- 18.
Z6l
- 3.
Z'fJ.Z
- 19.
Z6l
- 4.
7§1
- 20.
758
- 5.
7JQ
- 21.
757
- 6.
Z§l
- 22.
Z5Z
- 7.
759
- 23.
Z6Q
- 8.
Z'Q.8
- 24.
70Z
- 9.
Z§Q
- 25.
0
- 10.
Z§J
- 26.
0
- 11.
Z§Q
- 27.
0
- 12.
756
- 28.
- 13.
Z'Q.4
- 29.
- 14.
Z'fJ.6
- 30.
- 15.
757
- 31.
- 16.
756 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe--NET for each day in the reporting month. Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1998 The Unit began the month operating at 96 percent power. The plant remained at this reduced power level due to one turbine stop valve being out-of-service. On April 24, 1998 at 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, power reduction commenced, and the plant was taken off-line at 2351 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.945555e-4 months <br /> for the 1998 refueling outage. On April 25, 1998 at 0003 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the reactor was subcritical.
REPORT MONTH _
__,A"""P_,_R""'IL:....:..:19"'9.:..8 __
No.
Date
- 8.
980424
- 1.
F: Forced S: Scheduled Type1 Duration Reason2 (Hours) s 144.1 c
- 2.
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor3
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
Licensee Event Report#
- 4.
System Code' Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
-~.
DOCKET NO 50-255 UNIT Palisades DATE 05/01198 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185 Cause & Corrective Action to Prevent Recurrence
- 5.
Exhibit I - Same Source
v* -,.
OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
OPERATING DATA REPORT Palisades 980401-980430 2530 811. 7 805
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
?l. UNIT CAPACITY FACTOR. (USING MDC NET) 22: UNIT CAPACITY FACTOR (USING DER NE'!')
- 23. UNIT FORCED OUTAGE RATE This Month 719.0 575.1 574.9 1393953.1 455725 433366 80.0%
80.0%
82.6%
74.9%
0.0%
- 24. SHUTDOWNS.SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
Refueling Outage, Start 4/24/98, 39 days long
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
05/26/98
- 26. UNIT)- IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date 2879.0 2689.6 2665.7 6508604.2 2122649 2018780 92.6%
92.6%
96.1%
87.1%
- 1. 2%
Forecast DOCKET NO 50-255 DATE 5-1-98 COMPLETED BY RFSchmidt TELEPHONE (616)764-2185 NOTES:
Cumulative 231110. 0 138659.1 133606.9 2971894o"8. 4 94293783 89089996 57.8%
57.8%
56.2%*
47.9%
26.5%
Achieved