ML19030A364

From kanterella
Revision as of 13:48, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1
ML19030A364
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/03/1977
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A364 (4)


Text

l PS~G Public S.ervice Electric.and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 March 3, 197 Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:

1. Mr. James P. O'Reilly (1 Copy)

Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406

2. Director, Office of Management Information * (2 Copies) and Program Control US Nuclear Regulatory Commission Washington, D.C. 20555 H. J. Heller Manager - Salem Generating Station Enc.

Pg. 1-4 8-1-7. Rl The Energy People 95-2189 (SM) 10-72

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

- 272 UNIT , Salem No. 1 DATE 3-3-77 COMPLETED BY J.M. Zupko Jr.

TELEPHONE 609-365-7000 X507 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 117 17 462 .

2 49 18 456 3 81 19 484 4 107 20 440 5 110 21 380 6 119 22 468 7 190 23 459 8 260 24 259 9 231 25 0 10 115 26 0 11 131 27 0

.12 289 28 0 13 299 29 14 346 30 15 484 31 16 . 464

_ Pg. 2-4 8.1-7.RL,

e .APPP.NDIX C OPERA'I'.ING DATA REPORT. *

-4~:->*,, \ ...... tccXET ro. so- 2 72

"" ------~~~~----

UNIT Sal em No. 1 DATE 3-7-77 CCMPLEl'ED El J. M. Zupko Jr.

OPERATING STA'IUS TELEPHONE

  • 609-365-7000 Ext. 507
l. REPORTING PERIOD: February GROSS HOURS IN REPORTING PERIOD: 6 72

---=-~----

To Be

2. CURRF.Nl'LY AUTHORIZED FOWER LEVEL (MWt): 3338 MAX.DEPEND.CAPACI'I'Y(.MWe-NEr) :Determined DESIGN ELECTRICAL RATING(MWe-Net): 1090- *
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (.M'te-Net): None

~--~~~~~~

4. REASONS FOR RESTRICTION (IF .ANY): .

T'.dIS MJNl11 YR TO DATE Ct.JMDLATIVE

s. NtMBER OF BJtmS REACTOR WAS CRITICAL * * *
  • 54 5.1 . 1026.6 1328.2
6. REACI'OR RESERVE SHUTOOWN HOURS * * * * * *
  • 0.0 0.0 0.0
  • 1. HOURS GENERATOR ON LINE * * * * * * * * *
  • 528. 5 784.6 824.9
8. UNIT RESERVE SHUTOOWN HOURS * * * * * * *
  • 0.0 0.0 0.0 658284 904298
9. GROSS mERMAL ENERGY GENERATED Qrn'IH) * * * *

- 952995

10. GROSS ELECI'RICAL ENERG'1' GENERATED (MWH) * *
  • 185830 161500

- 189375 239120 242350 189375

11. NET ELECTRICAL ENERGY GENERATED {Ml'iH) * * * *
12. REACl'OR SERVICE FACTOR * * * * * * * * *
  • N/A N/A N/A
13. REACTOR AVAILABILIT'f FACTOR *******.* N/A N/A _NIA
14. UNIT SERVICE FACI'OR * * ** * * * * * * * *
  • N/A N/A N/A lS *. UNIT AVAIWILIT'f FACTOR * * * * * * * * *
16. UNIT CAPACITY' FACI'OR(Us:ing MOC). * * * * *
  • N/A N/A N/A
17. UNIT OOACIT'f FACTOR(Us:ing Design MWe) * *
  • N/A N/A N/A
18. UNIT FORCED CUfAGE RATE * * * * * , * , *
  • N/A N/A ;m/A
19. SHUTDOWNS SCliEDULED OVER NEcr 6 MJNIHS (TYPE,DATE ,.AND DURAT~ON .OF EAOl) : NONE
20. IF SHU!' OOWN AT END OF REFORI' PERIOD, ESTIMATED DATE OF ST.~: March 3, 1977
21. UNITS IN TEST STATOs (PRIOR TO CC>>iERCIAL OPERATION) : FORECAST . . AaIIEVED INITIAL CRITICALITI 9 76 12-11-76 INITIAL ELEC'IRICl'I'Y 11-01-76 12-25-76' Pg. 4 CCliWERCIAL OPERATION 12-20-76 8-1-7.Rf

APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1 DATE 3-3-77 (

COMPLETED BY J. M. Zupko Jr.

TELEPHONE 609-365-7000 EXT. 507 REPORT MONTH February 19 77 METHOD OF TYPE SHtrITING DOWN F: FORCED DURATION TIIE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS 77-13 770201 F 14.8 H 3 12 Stln. Gen. Feed Pump Trip I

77-14 770202 F 2.7 H 3 11 Stm. Gen. Feed Pump Trip 77-15 770202 F 2.9 A 3 11 Stln. Gen. Feed Pump Trip 77-16 770206 F 2.0 H 1 12A/12B Circulator Trip 77-17 770210 F 10.2 H 3 Main Steam Stop Valve Closure 77-18 770211 F 5.4 G 3 Main Steam Stop Valve Closure 77-19 770224 s 105.5 B 3 Rod Drop Test

SUMMARY

Pg.4-4 8.1-7.R 1