ML19256A399

From kanterella
Revision as of 23:39, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Additional Changes Being Made to Administrative Portions of Fire Protection Program,Which Are to Be Completed & Compared to Guidelines of NRC 780206 Ltr by 790301
ML19256A399
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/29/1978
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7901050159
Download: ML19256A399 (2)


Text

e B ALTIMORE G AS AND ELECTRIC COMPANY P.O. D O X 1475 B A LTIM OR E. M A R YL A N D 21203 ART Hun E. LU N DVALL,JR.

vic a Par s.c a ,

s m ,< .

Decenber 29, 1978 office of fluclear Peactor Regulation U.S. Nuclear Regulatory Cormission Washington, D.C. 20555 Attention: Mr. Robert Reid, Chief Operating Reactor Branch 4 Division of Operating Reactors Suhject: Calvert Cliffs fluclear Power Plant Units 1 and 2, Docket flos. 50-317 and 50-318 Nuclear Plant Fire Protection Functional Responsibilities, Adninistrative Controls and Quality Assurance

Reference:

(a) NRC Letter dated February 6,1978 From Mr. D. K. Davis to '.tr. A. E. Lundvall, Jr.

(b) BG&E Letter dated July ll,1978 From Mr. A. E. Lundvall, Jr. to Mr. P.obert Reid (c) Br,&E Letter dated November 14, 1978 From Mr. A. E. Lundvall, Jr. to Mr. Robert Reid Centleren:

This refers to our letter of flovember 14, 1978, Peference (c). Based on the site visit regarding fire protection perfomed by a team of personnel fron your office during the last week of Novenber,1978, we have decided to make additional changes to the administrative portions of our Fire Protection Program. Since these changes will alter many of the existing fire protection procedures, as well as create a new pro-cedure to govern the program, the corrparison of the adninistrative portions of our progran with ycur guidelines of Peference (a) will be delayed.

It is expected that our changes will be completed and compared to this guideline by March 1,1979, and that comparison submitted to you at that tire.

0 79010501 Si 0]o

\

F

a

. ,a Should you have further questions regarding this reply, we will be pleased to discuss then with you.

Very truly yours a . _l d '

A. E. Lundy 11, Jr.

Vice President - Supply AEL/ PED /ds