Text
- 3 y,
.L
'1 Q
gy
,9-BALTIMORE y
OAS AND O
E l. E C T R IC j
o CHAFtLES CENTER _e. P.O.- BOX 1475
- BALTIMORE. MARYLAND 21203-1475 i
n, L'
L
~ oconoc c cacco -
- Vect Passiotut Nucitan ratsov '
1
,f 000 aso aass
,4
{
September 18, 1990 E
C
.U. S. Nuclear Regulatory. Commission 6-
=. Washington, DC 20555 i
ATTENTION:
Document Control Desk 1
SUBJECT:
Calvert Cliffs Nuclear Power Plant
. Unit Nos.1 & 2; Docket Nos. 50-317 & $0-318 1Resnonse to Generic Letter 88-17 (TACs 69730 & 69731)
M l
REFERENCES:
-(a)L Generic Letter ' 88-17, Loss of Decay Heat Removal," dated L
. October 417( 1988 L
w (b)L 1.e'tter from.Mr. J. A. Tiernan -(BG&E) to. NRC - Document' Controli Desk, dated' January-3.1989, same subject
,J.
h (c)J Letter from Mr.' J. A.:..Tiernan2(BG&E) to NRC Document Control
' Desk, dated January 27, 1989, same subject i
li
.. Gentlemen:,
t.
/
Genericitetter 88-17 described : concerns and recommended actions forf operation -of the
};
Reactor v Coolant System (RCS) and Shutdown Cooling o(SDC) - System - during - reduced i
L, inventory conditions. 'In c response. to the Generic Letter, Baltimore Gas. and Electric
- (BGAE) CompanySimplemented the expeditious actions described in ' Reference (b) and is
=l l implementing ' programmatic enhancements as described in Reference (c). -The programmatic l
enhancements in Reference (c) indicated that BG&E would take - action to submit an j
amendment request. which -would reduce the minimum flow rates; allowed' by Technical LSpecifications in order l to reduce the likelihood of air ingestion into ; the SDC system i
as 3 a Tresult of vortexing. Our intent was to submit that license amendment ' request during April" 1990.
4 Baltimore Gas and ! Electric had previously incorporated reduced SDC flow requirements
~during mid-loop operations at Calvert Cliffs (see Amendment'Nos. 38 and 21 for Units 1-Land.' 2, respectively, from - 1979). Subsequent to the Generic Letter, BG&E' has m
N conducted ivortex ? testing and participated in a Combustion Engineering Owners Group I
-effort to' develop appropriate Technical Specification changes for reducing the shutdown.
cooling flow rate.LThe Owners Group report was received by BG&E in August 1990-and is currently under review for plant-specific implementation.
0 +"
49pn743eres y g,
-9009280025 900918 i'
PDR ADOCK 05000317
//O P
9 PDC
/
a.
I4
'.f DocWmelt C:ntrol Desk.
1 m
~ September-. 18,-1990 Page 2'
?
I.
,, :n b
Our license amendment request is~ now expected to be submitted during October i990.
J
. Since Calvert Cliffs has previously - incorporated reduced SDC ' flow ' requirements ' during mid-loopL operations : the proposed: changes will provide increased margin' to vortexing conditions and additional operational-flexibility.
Should - you ' have any questions regarding this matter, we will be pleased to discuss them s
with you.
Very truly yours j
/
\\'
f GCC/tRG/ dim cc:
D. A. Brune, Esquire J. E.
Silberg, Esquire R. A'. Capra, NRC.
D. G. Mcdonald, Jr., NRC
--T. T. Martin, NRC =,
L. E. Nicholson, NRC '
R. L McLean, DNR; i
H.
1
(..
l
~
. -.