ML20044B040

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. Brief Summary of Changes Listed
ML20044B040
Person / Time
Site: Calvert Cliffs  
Issue date: 07/13/1990
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044B041 List:
References
NUDOCS 9007170237
Download: ML20044B040 (3)


Text

...

1 f

3,

.]

Q.

'g BALTIMORE 51-OAS AND ELECTRIC 1

CHARLES CENTER

  • P.0, BOX 1475

LEON B USoELL o a.............

u,,...,

d July 13,1990 U. S. Nuclear Regulatory Commission Washington, DC.20555 Attention:

Document Control Desk

Subject:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 and 2; Dockat Nos. 50 317 and 50 318

?

P l P Imolementation Proaram - Revision 3

References:

(a)

Baltimore Gas & Electric Company letter dated July 31,-

1989, from Mr.: G. V. McGowan to Mr. James M. Taylor (NRC), Performance improvement Plan implementation Program.

(b)

Baltimore Gas & Electric Company letter dated March 8, 1990, from Mr. G. C. Creel-to Document Control Desk (NRC), Performance improvement Plan Revision 1 (c)

Baltimore Gas & Electric Company letter dated April 30, 1990 from Mr. L. B. Russell to Document Control Desk.

(NRC), Performance improvement Plan - Revision 2

l i

1

. Gentlemen:

Enclosed pleass find Revision 3 to the Calvert Cliffs Performance Improvement Plan implementation Program (PIP IP). This revision completely replaces the text.of the -

previous submittals, References (a),,(b), and (c). Please retain the tabs from the previous version for use with this rev,sion as described in the attached instructions.

i 1

i

?

Please note that, although the page numbering has changed, only certain portions of i

the text have been revised. These are indicated with change bars in the right hand margins,' except for Appendices, A, B, and C, which have been completely revised.

A brief summary of the changes in this revision is as follows:

7 Non " Action Plan" items were deleted from Tables 1.1 and 1.4.

l The use of Action Plan 2.2.2, Communications Plan to promulgate management expectations (" Mutual Obligations") was stated more explicitly.

9007170237 900713 DR ADOCK 0500 7

g [

r6 y

f

,i s.

T

^

Document Control Desk July 13,1990

- Page 2 The " Methods" for Action Plan 5.3.3, include already-scheduled milestone Technical Manual (T/M) improvements were expanded on the front end to t

evaluate proposed improvements to: T/M management, develop technical reviewer checklists, proceduralize. any improvements, and return T/Ms to Document Control after review. There wars no changes to the existing scope, schedule, or resources.

Action Plan'5.3.4, Design Basis Consolidation was restructured to better

. support the scheduling of-detailed activities and to add a milestone to determine the scope and schedule for 1991; activities by October.1,1990.

Actual change 6 to the schedule and resoLToes will be reflected in the next PIP-IP revision, currently planned for September 7,1990.-

References to " commitments" were changed to refer to " milestones."

l.

Implementation and Effectiveness Verification activities were updated.

Eight (8) Action Plans were added to the second Effectiveness Verification

" vertical slice," five. (5) to the third, and two (2) to the fourth. Table 6.1 was t,

revised accordingly.

Appendices A,' B, and C were revised to reflect information as of the end of the second quarter.

A number of editorial changes and corrections were made.

l The entire PIP-IP was repaginated.

With this revision, the total number of Action Plans which have been verified as

' implemented is eleven (11).

B Should you have any question regarding the enclosed revision or our future plans, l~

. piease don't hesitate to call me, o

L Very truly yours, f

P LBR/RCLO/smg Enclosures cc:

D. A. Brune, Es ulre T. T. Martin, NRC J. E. Silberg, Es ire L. E: Nicholson, NRC l

R. A. Capra, D. G. Mcdonald, Jr., NRC W. J. Lazarus, NRC B. A Boger, NRC R.1. McLean, DNR I

s s

6.

CALVERT CLIFFS NUCLEAR POWER PLANT-

. PEFORMANCE IMPROVEMENT PLAN IMPLEMENTATION PROGRAM Revision 3 July 13,1990 instructions

]

Remove Pages insert Pages i

Front Matter 7/13/90 Transmittal Letter All except Transmittal Letters All Front Matter Rev. 3 Tab 1.0 Introduction & Backaround All 1 1 thru 1-15 Rev. 3 Tab 2.0 Manaaement Process Imorovements All 21 thru 219 - Rev. 3 lab 3.0 Oraanizational Dvnamics Imorovements,

All 31 thru 3-23 3ev. 3 -

l Tab 4.0 Assessment Caoability Imorovements T

L All 4-1 thru 4 Rev. 3 Tab 5.0 - Activity Control imorovements All 5-1 thru 5 Rev. 3 Tab 6.0 PIP Verification Processes All 61 thru 6 8 - Rev. 3 Tab Accendix A PIP Action Plan Schedules k

All Appendix A - Rev. 3 Tab Accendix B PIP Action Plan Resources All Appendix B - Rev. 3

' Tab Accendix C PIP Action Plan Proaress L

All Appendix C - Rev. 3 Page 1 of 1 L

-