1 f
3,
.]
Q.
'g BALTIMORE 51-OAS AND ELECTRIC 1
CHARLES CENTER
- P.0, BOX 1475
- BALTIMORE MARYLAND 21203 1475 i
LEON B USoELL o a.............
u,,...,
d July 13,1990 U. S. Nuclear Regulatory Commission Washington, DC.20555 Attention:
Document Control Desk
Subject:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 and 2; Dockat Nos. 50 317 and 50 318
?
P l P Imolementation Proaram - Revision 3
References:
(a)
Baltimore Gas & Electric Company letter dated July 31,-
1989, from Mr.: G. V. McGowan to Mr. James M. Taylor (NRC), Performance improvement Plan implementation Program.
(b)
Baltimore Gas & Electric Company letter dated March 8, 1990, from Mr. G. C. Creel-to Document Control Desk (NRC), Performance improvement Plan Revision 1 (c)
Baltimore Gas & Electric Company letter dated April 30, 1990 from Mr. L. B. Russell to Document Control Desk.
(NRC), Performance improvement Plan - Revision 2
- l i
1
. Gentlemen:
Enclosed pleass find Revision 3 to the Calvert Cliffs Performance Improvement Plan implementation Program (PIP IP). This revision completely replaces the text.of the -
previous submittals, References (a),,(b), and (c). Please retain the tabs from the previous version for use with this rev,sion as described in the attached instructions.
i 1
i
?
Please note that, although the page numbering has changed, only certain portions of i
the text have been revised. These are indicated with change bars in the right hand margins,' except for Appendices, A, B, and C, which have been completely revised.
A brief summary of the changes in this revision is as follows:
7 Non " Action Plan" items were deleted from Tables 1.1 and 1.4.
l The use of Action Plan 2.2.2, Communications Plan to promulgate management expectations (" Mutual Obligations") was stated more explicitly.
9007170237 900713 DR ADOCK 0500 7
g [
r6 y
f
,i s.
T
^
Document Control Desk July 13,1990
- Page 2 The " Methods" for Action Plan 5.3.3, include already-scheduled milestone Technical Manual (T/M) improvements were expanded on the front end to t
evaluate proposed improvements to: T/M management, develop technical reviewer checklists, proceduralize. any improvements, and return T/Ms to Document Control after review. There wars no changes to the existing scope, schedule, or resources.
Action Plan'5.3.4, Design Basis Consolidation was restructured to better
. support the scheduling of-detailed activities and to add a milestone to determine the scope and schedule for 1991; activities by October.1,1990.
Actual change 6 to the schedule and resoLToes will be reflected in the next PIP-IP revision, currently planned for September 7,1990.-
References to " commitments" were changed to refer to " milestones."
l.
Implementation and Effectiveness Verification activities were updated.
Eight (8) Action Plans were added to the second Effectiveness Verification
" vertical slice," five. (5) to the third, and two (2) to the fourth. Table 6.1 was t,
revised accordingly.
Appendices A,' B, and C were revised to reflect information as of the end of the second quarter.
A number of editorial changes and corrections were made.
l The entire PIP-IP was repaginated.
With this revision, the total number of Action Plans which have been verified as
' implemented is eleven (11).
B Should you have any question regarding the enclosed revision or our future plans, l~
. piease don't hesitate to call me, o
L Very truly yours, f
P LBR/RCLO/smg Enclosures cc:
D. A. Brune, Es ulre T. T. Martin, NRC J. E. Silberg, Es ire L. E: Nicholson, NRC l
R. A. Capra, D. G. Mcdonald, Jr., NRC W. J. Lazarus, NRC B. A Boger, NRC R.1. McLean, DNR I
s s
6.
CALVERT CLIFFS NUCLEAR POWER PLANT-
. PEFORMANCE IMPROVEMENT PLAN IMPLEMENTATION PROGRAM Revision 3 July 13,1990 instructions
]
Remove Pages insert Pages i
Front Matter 7/13/90 Transmittal Letter All except Transmittal Letters All Front Matter Rev. 3 Tab 1.0 Introduction & Backaround All 1 1 thru 1-15 Rev. 3 Tab 2.0 Manaaement Process Imorovements All 21 thru 219 - Rev. 3 lab 3.0 Oraanizational Dvnamics Imorovements,
All 31 thru 3-23 3ev. 3 -
l Tab 4.0 Assessment Caoability Imorovements T
L All 4-1 thru 4 Rev. 3 Tab 5.0 - Activity Control imorovements All 5-1 thru 5 Rev. 3 Tab 6.0 PIP Verification Processes All 61 thru 6 8 - Rev. 3 Tab Accendix A PIP Action Plan Schedules k
All Appendix A - Rev. 3 Tab Accendix B PIP Action Plan Resources All Appendix B - Rev. 3
' Tab Accendix C PIP Action Plan Proaress L
All Appendix C - Rev. 3 Page 1 of 1 L
-