ML20195B375

From kanterella
Jump to navigation Jump to search
Forwards ECCS Codes & Methods Rept, as Required by 10CFR50.46(a)(3)(ii)
ML20195B375
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/25/1999
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20195B381 List:
References
NUDOCS 9905280243
Download: ML20195B375 (2)


Text

_ . _ _ _ _ _ _ _ _ _ _ _ - .

CHARLES II. COUSE Baldmare Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Nuclear Energy Lusby, Maryland 20657 410 495-4455 May 25,1999 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Submittal of Emergency Core Cooling System Codes and Methods Renort As required by 10 CFR 50.46(a)(3)(ii), the Emergency Core Cooling System Codes and Methods Report is provided in Attachment (1).

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, h

CHC/DJM/ dim Attachment (1) CENPD-279, Supplement 10, " Annual Report on ABB CE ECCS Performance Evaluations Models," ABB-Combustion Engineering Nuclear Power, April 1999 cc: A. W. Dromerick, NRC (Without Attachment)

R. S. Fleishman, Esquire Resident Inspector, NRC '

J. E. Silberg, Esquire R. I. McLean, DNR

)

I S. S. Bajwa, NRC H. J. Miller, NRC q[; J. H. Walter, PSC 0 0\

l 9905280243 990525 PDR /

I P

ADOCK 05000317 PDR . . , .

ATTACHMENT (1)

CENPD-279, Supplement 10,

" Annual Report on ABB CE ECCS Performance Evaluations Models,"

1 ABB-Combustion Engineering Nuclear Power, April 1999 l

1 l

Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant May 25,1999