ML20195B375
| ML20195B375 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 05/25/1999 |
| From: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20195B381 | List: |
| References | |
| NUDOCS 9905280243 | |
| Download: ML20195B375 (2) | |
Text
_. _ _ _ _ _ _ _ _ _ _ _ -.
CHARLES II. COUSE Baldmare Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 May 25,1999 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Submittal of Emergency Core Cooling System Codes and Methods Renort As required by 10 CFR 50.46(a)(3)(ii), the Emergency Core Cooling System Codes and Methods Report is provided in Attachment (1).
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, h
CHC/DJM/ dim Attachment (1) CENPD-279, Supplement 10, " Annual Report on ABB CE ECCS Performance Evaluations Models," ABB-Combustion Engineering Nuclear Power, April 1999 cc:
A. W. Dromerick, NRC (Without Attachment)
R. S. Fleishman, Esquire Resident Inspector, NRC
)
J. E. Silberg, Esquire R. I. McLean, DNR I
S. S. Bajwa, NRC q[;
J. H. Walter, PSC H. J. Miller, NRC 0\\
0 l
9905280243 990525
/
I PDR ADOCK 05000317 P
ATTACHMENT (1)
CENPD-279, Supplement 10,
" Annual Report on ABB CE ECCS Performance Evaluations Models,"
1 ABB-Combustion Engineering Nuclear Power, April 1999 l
Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant May 25,1999