LER 79-001/03L-0 on 790106:excessive Reactor Coolant Sys Unidentified Leakage.Caused by Cracked Weld on Socket Weld Downstream of Second Isolation Valve.Study Planned to Propose Design Changes to Correct Fatigue Problem
ML19273A998
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 01/24/1979
From: Davis S, Watkins K
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19273A996 List:
References
LER-79-001-03L, LER-79-1-3L, NUDOCS 7902010182
Download: ML19273A998 (2)


Text

e u (7 77)

LICENSEE EVENT REPORT

,

  • CONTROL BLOCK: l 1

l l l l l lh 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7 o 1 8 9 l M lLICENSEE 0 I CCODE l C l N I N l@l 0 0l-10l0101010l-14 15 LICENSE NUMBEM 010l@l42b 26 11111Ill@l LICENSE TYPE 40 l

57 CAT 68 l@

CON'T ~

lol11 5$RM60 l L l@[0 l 5DOCKET 10 l0 l0 l 3 l168l8 69l@l 0EVENT 110l617191@l01112141719l@

74 75 REPORT DATE 80 7 8 61 NUMBER DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h O 2 l At 0900 Reactor Coolant System (RCS) unidentified leakage was 1.546 ann, exceedino I O 3 lthe amount allowed by T.S. 3.4.6.2.C. At 0930 commenced power decrease to l o 4 l'investicate leakaoe around 21 A reactor coolant oumo (RCP). 21A RCP middle 1 0 s Iseal pressure sensing line was found to have a cracked weld and was isolated. j O 6 lRCS leakage was determined to be less than 1 apm at 1448. LERs 77-15 (U-1) l 0 7 land 78-50 (U-2) describe similar events. I O 8 l l 7 8 9 80 C DE CODE SUBCO E COMPONENT CODE SUB CO D'E SU E 7

O 9 8

[ClB @ J@ l Cl@ l P lIl Pl E l X I X @ l A l@ J @

9 10 11 12 '3 18 19 20 SEQUENTuL OCCURRENCE REPORT R E VISION IiVENT YE AR REPORT NO. CODE TYPF NO.

@ =LER/RO  ; 17i91

,21 22

-i 23 10 Olli 24 26 a

27

!a i3 !

28 29 i t.

30 i i-i 31 10 i 32 KE A T ON ON PL T MT HOURS 22 SB IT FOR B. SUPPLIE MANUFA TURER lZ 32

[g]34B lg l35A lg l36A[g l0l0l2 37 40 l Yi g 41 l N lg 42 43 Alg lBl5l8l0lg 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 3 O lUpon investigation the cracked weld was found to be located on a socket weld I g,,,, downstream of the second isolation valve. Weld repairs were performed for i

, , ireturn to service. An engineering study is underway to propose design i

, 3 ichanges to correct the fatigue problem. (See attached sheet). i l i l 41 1 I

% POWER OTHE R STATUS ISCOV RY DISCOVERY DESCRIPTION i s SY l Sl@ l0l9l7 gl NA l l8jgl Operator observation l ACTIVITY CONTENT RELE ASED OF RE LE ASE 40VNT OF ACTIVITY LOCATION OF RELEASE 6 NA l [ NA l 7

1 8 9

@ l10Z l@l 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION NA i 7 l 0 l 0 l0 l@l Z l@l l

' ' S

rERSONNE L iN;u' RIES NuveER 7

i e 8 9 l0l0l0l@lOtSCRieTiON@ NA 11 12 80 l

TO FACILITY

'os,5,OF yy OR DAMAG i 9 NA l H 9 l Z l@l10 80 7

IS D h 010 / A$

L2 L.o.!

7 8 9 bTE8l 10 ESCRIPTION NA i 68 69 i i i i ; i i l,; i i 80 g i}

NAME OF PREPARER PHONE:

c' LER 79-01/3L EVENT DATE 1/6/79 REPORT DATE 1/24/79 DOCKET NO. 50-318 ATTACHMENT CAUSE DESCRIPTION AND CORRECTIVE ACTIONS: (CONTINUED)

Upon investigation the cracked weld was found to be located on a socket weld downstream of the second isolation valve. Weld repairs were performed for return to service. A vibration analysis performed during the past refueling outage determined that fatigue levels of vibration existed at several locations on RCP instrument piping / tubing. Braces added to this piping have reduced but not eliminated vibration. An engineer 219 study is underway to propose design changes to correct the fatigue problem.

.