Confirms Telcon Re Unusual Event Rept UE-269/74-05 Transmitted 741007.Diagnostic Test to Be Performed on Unit 2 or 3 During Power Escalation Testing.Loss of Electrical Load Test to Be Performed on Unit 1 After Refueling
ML19308B045
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/18/1974
From: Thies A
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19308B046 List:
References
NUDOCS 7912120798
Download: ML19308B045 (1)


Text

.

DUKE POWER COMPAN s '

Powra Burt.orwo 4aa SouTu Cnuncar Starzt. CnAnr.oTTE, N. C. asnos A. C. T :.as P. O. Box ci7e se. v.ccp. . .,

p.om. . T... . .. .. .

October 18, 1974 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U. S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re: Oconee Unit 1 Docket No. 50-269

Dear Mr. Moseley:

This letter confirms a telephone conversation between Mr. F. Jape of your staff and Mr. K. S. Canady concerning my letter of October 7, 1974 transmitting Unusual Event Report UE-269/74-5, " Acceptance Criteria Were Not Met During Unit Loss of Electrical Load Test."

The Corrective Action Section stated that a test to permit deter-mination of the specific parameters which prevented achieving the acceptance criteria would be performed prior to Oconee Unit 1 refueling. Currently, Unit 1 is operating at the 90 percent power level with Group 6 control rods controlling and Gr 2p 7 control rods fully inserted.

Further deboration to achieve a higher power level to perform the diagnostic test is not desirable prior to refueling. The diagnostic test will be performed on Unit 2 or 3 during the power escalation testing sequence and design changes which are appropriate will be- i implemented on Unit 1. -The loss of electrical load test will be performed on Unit 1 to verify that it meets the acceptance criteria j at some future date after refueling. j Very truly yours, -

{

~ ,7 i v c'{, p ? Ac M A.'C. Thies ACT:vr cc: Mr. Angelo Giambusso 4

791212077[