ML19308B046

From kanterella
Jump to navigation Jump to search
Confirms Telcon Re Unusual Event Rept UE-269/74-05 Transmitted 741007.Diagnostic Test to Be Performed on Unit 2 or 3 During Power Escalation Testing.Loss of Electrical Load Test to Be Performed on Unit 1 After Refueling
Date released: 11/18/2019 Download: ML19308B046


Unusual Event 269/74-05:on 740823,during Unit Loss of Electrical Load,Acceptance Criteria Not Met & Reactor Tripped.Caused by High Reactor Coolant Pressure.Problem Being Studied.Design Mod Possible to Pressurizer Spray Valve
ML19308B051
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/07/1974
From:
DUKE POWER CO.
To:
References
Download: ML19308B051 (2)
Forwards Unusual Event UE-269/74-05
ML19308B047
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/07/1974
From: Thies A
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308B047 (1)
Confirms Telcon Re Unusual Event Rept UE-269/74-05 Transmitted 741007.Diagnostic Test to Be Performed on Unit 2 or 3 During Power Escalation Testing.Loss of Electrical Load Test to Be Performed on Unit 1 After Refueling
ML19308B045
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 10/18/1974
From: Thies A
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308B045 (1)