ML19309E604

From kanterella
Revision as of 10:29, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-020/01T-0
ML19309E604
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/17/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309E606 List:
References
NUDOCS 8004220698
Download: ML19309E604 (1)


Text

l

~T ~

- : LZ - ~ :

716 Edney Building April 17, 1980 Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Conmisalon Office of Inapection and Enforcement Ragion II 101 Marietta Street, Suite 3100 Atlanca, Georgia 30303

Dear Ifr. O'Reilly:

TDaiESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET NO. 50-327 - FACILITY OPERATING LICEiSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/8020 The enclosed report providae derails concerning a design error made on calculating pipe supports. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.12.1.

Very truly yours, TE:CTESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3)

Office of fanagement Information and Program Control U.S. Nuclear Regulatory Co= mission '

Washington, DC 20553 Director (40)

Office of Inspection and 2nforcement U.S. Nuclear Regulatory Cor.:sission Washington, DC 20555

fr. Sill Lavalice
iuclear Safety Analysis Center Palo Alto, California 94303 lir. U. T. Cottle, !CC Inspector, Sequoyah

\

8004220 [ f [