ML19317E614

From kanterella
Revision as of 07:10, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1974
ML19317E614
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E611 List:
References
NUDOCS 7912180812
Download: ML19317E614 (3)


Text

. -

,] ,,

. I

~ '

Oc:ne3 Unit 1

' UNIT 0 .

DATi Augu t 10, 1974 OPERATING STATUS .

J"IY I July 31, 1974

1. REPORTING PERIOD: TO GROSS Il0URS IN REPORTING PERIOD: 744
2. CURRENTLY AUTliORIZED POWER LEVEL MWt 2568 MWe-NET 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):
4. REASONS FOR RESTRICTIONS (IF ANY):

THIS CUMULATIVE MONTH YR-TO-DATE TO DATE

5. 'il0URS REACTOR WAS CRITICAL 734.6 3613.6 7967.s
6. HOURS GENERATOR ON-LINE 714.4 3505.4 6494.5
7. CROSS THf.RMAL POWER GENERATED (MWH) 1751151 8231509 14242390
8. CROSS ELECTRICAL POWER GENERATED (MWH) 610896 2876512 4965100
9. NET ELECTRICAL POWER GENERATED (MWH) 582258 2722822 4681900
10. REACTOR AVAILABILITY FACTOR (1) 98.7 71.0 87.1
11. PLANT AVAILABILITY FACTOR (2) 96.0 68.9 71.0
12. PLANT CAPACITY FACTOR (3) 89.9 61.5 58.8
13. FORCED Ot/TAGE RATE (4) 3.9 7.1 7.9 14 SilUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACll): Refueling Outage, October 1974,1 month
15. IF SHUTDOWN A'T END OF REPORT PERIOD, ESTIMATED DATE OF .iTARTCP:
16. PLANTS IN TEST STATUS (PRIOR TO COMMERCLtL OPERATION) REPORT THE FOLLOWING: .

DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITL\L CRITICALITY INITIAL ELECTRICAL .

POWER GENERATION Colt!ERCIAL OPERATION _ _

, (1) REACTOR AVAILABILITY FACTOR = IIOURS REACTOR WAS CRITICAL *100 GROSS Il0URS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = _IlOURS CENERATOR ON-LINE *100 GROSS HOURS IN REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED

. CURRENTLY LICENSED POWER LEVEL

  • GROSS Il0VRS IN REPORTING PERIO (4) FORCED~~OUTACE RATE = FORCED Ol!TAGE IlJO RS
  • 100

~h0CRS GENERATOR ON-LINE + FORCED OUTAGE HOURS 7912180

UtilT Oconso Unit 1

, DATE August 10, 1974

~

DAILY PLAfJT POWER OUTPUT ti0flTH July, 1974 DAY AVERAGE 9AILY tiWe-net DAY AVERAGE DAILY tiWe-net 3903 20438 1 22 2 15171 20468 23 3

19754 20399 24 4 20548 20348 25 5

9250 20348 26 6 7883 20230 27 7

18260 20008 28 8 20274 19834

- 29 9

20293 20349 30 10 20373 20424 3

yj 20371 20434 12

"~

j3 20374 g 20348 20395 15 20466 16 20268 y7 18 20428 19 20315 20 20137 21 2016'

g::IT NA?.E Oconce Unit 1 DATE Augu.c 10, 1974 CO'IPLETED BY REPORT MO:;Tal July, 1974 PLANT SHUTD0UNS .

TYPE M.ETiiOD OF

  • F-FORCED DURATIO:4 SliUTTI::G D041 *
0. DATE S-SCliEDULED (il0URS) REASON (1) T
lE REACTOR (2) CO::ENTS .

9 740629 F 14 A A 10 749705, F 9 G C 11 740705 F 2 C C (1) REASON:

.J.-EQUIP >ENT FAILURE (EXPLAIX)

  • ,(2) 1 127t!0');

A- M.W AL B-!LU;;T. OR TEST 3- I./.;1'AL SCRMI C-REFUELING C .* JT01\ TIC SC1.O! . ;

D-RLGULATCRY RESTRICTION E-OPERATOR TRAINIliG K;D

, LICENSE EX.UIINATION ,

F-AD:'I:;ISTRATIVE G-OPERATIO:!AL ERROR ,.

(EXPLAIN) l j