Text
',
~
dNIT ocon n Unit 2 D*dATE August 10, 1974 OPERATINC STATUS 1.
REPORTING PERIOD:
July 1 TO July 31, 1974 CROSS Il0URS IN REPORTING PERIOD:
744.0
~
2.
CURRENTLY AUTliORIZED POWER LEVEL MWt 2568 MWe-NET
~
3.
POWER LEVEL TO Wi!ICil RESTRICTED (IF ANY): None 4.
REASONS FOR RESTRICTIONS (IF ANY): Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 9-13 are not applicable.
THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.
HOURS REACTOR WAS CRITICAL 356.I 1264.6 1922.0 6.
h0URS GENERATOR ON-LINE 306.2 1128,5 1641.7 7.
CROSS THERMAL POWER GENERATED (MWH) 399.375 1,866,012 2468983 8.
GROSS ELECTRICAL F0WER GENERATED (MWH)131.680 642,046 818.356~
9.
NET ELECTRICAL POWER GENERATED (M'.4H)
N/A 10.
REACTOR AVAILABILITY FACTOR (1)
N/A 11.
PLANT AVAILA3ILITY FACTOR (2)
N/A 12.
PLANT CAPACITY FACTOR (3)
N/A 13.
FORCED OlfrAGE RATE (4)
N/A 14.
SitUTDONNS SCllEDUI ED TO BEGIN IN NEXT 6 MONTIIS (STATE TYPE, DATE AND DURATION OF EACH):
i 15.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
16.
PLANTS IN *.EST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL, ELECTRICAL 12/5/73 POWER GENERATION C0 rtERCLtL OPERATION 9/I/74 (1) REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL
- 100 GROSS HOURS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = UGURS GENERATOR ON-LINE
- 100 GROSS HOURS IN REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL
- GROSS HOURS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OtiTAGE Il0URS
- 100 tt0URS GENERATOR ON-LINE + FORCED OUTAGE HOURS 7912180h[-
~
oc:nas Unit 3 g3lT
. DATE - August 10, 1974
~
0PERATING STATUC 1.
REPORTING PERIOD:
July 1 TO July 31, 1974 GROSS I!OURS IN REPORTING PERIOD:
744.0 2.
CURRENTLY AUTHORIZED POWER LEVEL MWt 2568 MWe-NET None 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):
4.
REASONS FOR RESTRICTIONS (IF ANY):
THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.
HOURS REACTOR WAS CRITICAL N/A N/A 6.
Il0URS GENERATOR ON-LINE 7.
GROSS THERMAL POWER GENERATED (MWH)
N/A 8.
CROSS ELECTRICAL POWER GENERATED (MWH) N/A b
N/A 9.
NET ELECTRICAL POWER GENERATED (MWH)
N/A 10.
REACTOR AVAILABILITY FACTOR (1)
N/A 11.
PLANT AVAILABILITY FACTOR (2)
N/A 12.
PLANT CAPACITY FACTOR (3)
N/A 13.
FORCED OLTTAGE RATE (4) l '.. SIIUTDOWN$' SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):
15.
IF SHUTDOWN AT' END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
16.
PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 8/13/74 INITIAL ELECTRICAL 8/27/74 POWER GENERATION CD:t!ERCIAL OPERATION 10/1/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAI,
- 100 GROSS tl0URS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = IUURS GENERATOR ON-LINE
- 100 GROSS liOURS IN REPORTING PERIOD l
f (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED ERREETLY LICENhEli POWERTEVELERdSS Il0EliS IN REPdRTING'PEitIO (4) FORCED OUTAGE RATE = FORCED OUTAGE I!OURS
- 100
~
~110CRS GENERATOR ON-LINE + FORCED OUTAGE HOURS i
,