Interim Rept Re Overstressed Condition in Letdown Cooler Supports.Analyses of Letdown Cooler Supports Based on Nozzle Loads Are Being Conducted by Manufacturer & B&W.Interim or Final Rept Will Be Sent on or Before 801230
ML19338F525
Person / Time
Site: Midland
Issue date: 10/10/1980
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 9769, NUDOCS 8010200463
Download: ML19338F525 (1)


Text

[;C f "CORSUil10fS r1- 6 90il.gr James W Cook

'r / j' 0$$fNfl Vice President, .\tidiand Pruycs General of f acesL 1945 West Parnal! Road, Jackson, Michigan 49201 *(517) 788-0640 October 10,-1980 Mr J~G.Keppler, Regional Director 10ffice of Inspection & Enforcement US Nuclear Regulatory Commission

-Region III 799 Roosevelt Road Glen Ellyn, IL 60137-MIDLAND NUCLEAR PLAN'I' UNIT N01, . DOCKET NO 50-329 UNIT NO 2, DOCKET No 50-330 LETDOWN COOLER SUPPORTS

. FILE: 0.4.9.38 UFI: T3*10*01, 15240(E), 02312(S) SERIAL: 9769

Reference:

CPCo letters to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Letdown Cooler Supports:

1) Serial Hove-6h-80,- dated March 27, 1980 2)' Serial' 9180, dated June 19, 1980 This letter,- as were the referenced letters, ic an interim 50 55(e) report concerning the overstressed condition in letdown cooler supports.

The manufacturer and B&W are in the. process of analyzing the letdown cooler supports based on the actual nozzle loads supplied by the Architect / Engineer.

The result of the analyses are expected to be available by the beginning of November. Once 'these loads are' available, the Architect / Engineer vill analy::e the existing support to determine' the extent of the modification required. Within the month of_ December, we should be able to define whether

'a major redesign .of the support is-necessary or if a minor modification, such as was shown to Mr R N Sutphin during his August 19-22 Midland Site inspection,

is all.that_is' required.

~

-lAnother report, either interim or final, vill be sent on or before December 30, 1980.

. / .

-: WRB/lr