Interim Deficiency Rept Re Lack of Weld Insp & Nondestructive Examination Documentation for Quality Verification for Biological Shield Lower Subassembly Supplied by Px Engineering, Initially Reported 801204
ML20003A439
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/18/1980
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20003A370 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8102030688
Download: ML20003A439 (1)


Text

..

O Thomas J. Martir' Public Service Electric and Gas Company 80 Park P! ace Newark, NJ. 07101 201/430-8316 v,ceo m.oent Enginaenes am Construction November 18, 1980 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission ,

Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, pennsylvania 19406

Dear Mr. Grier:

BIOLOGICAL SHIELD 10CFR50.55(e), POTENTIAL SIGNIFICANT DEFICIENCY NO. 1 UNIT HOPE CREEE GENERATING STATION On July 1, 1980, a verbal report concerning a potential significant deficiency was reported to Region 1, Office of Inspection and Enforcement representative, Mr. McGaughy. It was reported that documentation per-taining to quality verification for the lower subassembly of the biological shield supplied by pX Engineering was found lacking inspection and NDE of several welds.

Supplemental information was submitted in writing to Region 1, Office of Inspection and Enforcement on August 7, 1980 and September 15, 1980.

The following is a third interim report and it is to con-vey the information that the investigation has not yet been completed.

It is expected that the assessment of reportability in

accordance with requirements of 10CFR50.55(e) will be completed by December 19, 1980. PSE&G will inform the NRC of the results at that time.

I Very truly yours,