Part 21 Rept Re Defect Discovered in Degraded Grid Trip/Bus Transfer Scheme for Class IE Vital Bus Equipment.Time Delay of .7 Incorporated in Loading Scheme to Allow Loads to Drop Off of auto-swapped Class IE Buses
ML20102B104
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/08/1992
From: Labruna
Public Service Enterprise Group
To: Scarfo G
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
References
REF-PT21-92 NUDOCS 9207280177
Download: ML20102B104 (1)


Text

.

.~

e h0WERREACTOR ENT NUMBER:

23429 j

FACILITY: HOPE CREEK REGION:

'l NOTIFICATION DATE: 05/08/92 UNIT:

[1] [ ] [ ]

STATE: NJ NOTIFICATION TIME: 17:43 [ET)

RX. TYPE: [1] GE-4 EVENT DATE:

05/04/92 EVENT TIME:

12:00[EDT)

NRC NOTIFIED BY: LABRUNA LAST UPDATE DATE:

05/08/92 HQ OPS OFFICER:

GREG SCARFO NOTIFICATIONS EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION:

CDEF 21. 21(b) (2)

DEFECTS / NONCOMPLIANCE UNIT SCRAM' CODE' RX CRIT INIT PWR INIT RX MODE CURR PWR CURR RX MODE 1

N Y

100 POWER OPERATION 100 POWER OPERATION l EVENT TEXT A DESIGN DEFECT WAS DISCOVERED IN THE DEGRADED GRID TRIP / BUS TRANSFER SCHEME FOR CLASS IE VITAL BUS EQUIPMENT.

THIS DESIGN WAS SUPPLIED BY j

BICHTEL POWER CORPORATION.

l THE-STATION SERVICE. TRANSFORMERS "1AX501" AND "1BX501" (13.8KV/4.16KV)

UTILIZE AUTOMATIC LOAD TAP CHANGERS WHICH EACH FEED TWO OF FOUR CLASS 1E BUSES.

AN EMGINEERING ANALYSIS INDICATES THAT IF AN AUTOMATIC LOAD CHANGER FAILED IN 'THE " LOW POSITION" CONCURRENT WITH A LOCA, A BUS SWAPOVER FROM ONE: STATION SERVICE TRANSFORMER TO THE.OTHER (THE ALTERNATE POWER SUPPLY)

COULD OCCUR.

AC POWER SUPPLIED TO THE CLASS IE LOADS COULD BE ELECTRICALLY OUT-OF-PHASE WITH THE ORIGINAL POWER SUPPLY AND MAY DAMAGE THE SAFETY EQUIPMENT.

BECHTEL POWER CORPORATION SUPPLIED THE DESIGN OF THIS BUS L

TRANSFER SCHEME.

A CORRECTIVE ACTION WAS IMPLEMENTED TO INCORPORATE A

.7 SECOND TIME DELAY IN THE LOADING SCHEME TO ALLOW LOADS TO DROP OFF OF THE AUTO-SWAPPED CLASS 1E BUSES AND PREVENT 'IHEM FROM BEING DAMAGED.

THE LICENSEE HAS DETERMINED THAT THE ADDITIONAL TIME DELAY WILL NOT AFFECT THE ACCIDENT LOADING. THE LICENSEE IS DRAFTING A PART 21 REPORT AND WILL SUBMIT IT WITHIN 30 DAYS, l

l I

9207280177 920508 ADOCKOSOOg4 DP V

-