ML20009A257

From kanterella
Revision as of 02:33, 28 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept Re Weld Discrepancies in Main Control Panels & Auxiliary Relay Racks Furnished by Comsip Customline Corp.Ae Evaluation of Seismic Testing Expected to Be Completed by 811130
ML20009A257
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/29/1981
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, KMLNRC-81-093, KMLNRC-81-93, NUDOCS 8107090352
Download: ML20009A257 (1)


Text

$6 bfC') Y8 KANSAS GAS AND ELECTRIC COMPANY

% euseme ==ww GLENN L 40 ESTER vtCE Petsacs=v. =vegaas June 29, 1981 Mr. G.L. Madsen, Chief ,

[' / 'N Reactor Projects Branch S  %

U.S. Nuclear Pagulatory Commission Region IV

~

{ h y ',

611 Ryan Plaza Drive, Suite 1000 -

Og$ M 3

Arlington, Texas 76011 C\, sj p C','

Q/,' ,

f(p .

KMLNRC 81-093 4/ T '.i

/ '

Re: NRC Docket No. 50-482 Ref: Letter KMLNRC 81-062 dated 2/27/81 from GLKoester, KG&E, to WCSeidle, NRC Subj: Interim 50.55(e) Report - Nonconforming Welds in Main Control Panels

Dear Mr. Madsen:

The purpose of this letter is to update the Referenced Report concerning weld discrepancies in the Main Control Panels ar.d Auxiliary Relay Racks furnished to Wolf Creek Generating Station site by Comsip Customline Corporation.

The seismic testing effort has been completed and the results of the inspection program of the as-welded panels at Wolf Creek have been for-warded to the Architect / Engineer for evaluation and disposition. As indicated in the Referenced Report, we anticipated that their effort would be completed on or about July 1,1981. However, due to the quartity of data being evaluated, the Architect / Engineer now estimates that the evaluation report will not be completed until November 1981. A report su=marizing the result of this evaluation will be forwarda to the NRC shortly thereafter.

In the interin, please direct any questions on this matter to me or Mr. Gene Rathoun of my staff.

Yours very truly, l d'l n y $ O GLK:bb cc: TVandel, NRC Site Inspector 5 A

8107090352 810629 PDR ADOCK 05000482 S PDR 201 N. Market - Wichsta. Kansas - Mail Address: PO. Bos 208 I Wichita Kansas 37201 - Telephone: Area Code (316) 261-6451