Final Deficiency Rept Re ex-core Neutron Detector Field Cabling.Initially Reported on 841009.All Damaged Triaxial Cables & Connectors Repaired &/Or Replaced.All Insulation Panels Verified to Be Properly Reinstalled
ML20099H160
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/09/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
KMLNRC-84-195, NUDOCS 8411280046
Download: ML20099H160 (1)


Text

,

KANSAS GAS AND ELECTRIC COMPANY TFE ELECTRC CCMPANY November 9,1984 a 1

@LENN L MOESTER vica enamotNr . Nuctram Mr. R. P. Denise, Wolf Creek Task Force B@MDMM A l

Reactor Projects Branch 2 U.S. Nuclear Regulatory Commission g ,

5m Region IV  ;

611 Ryan Plaza Drive, Suite 1000 ' ' ' {

Arlington, TX 76011 -- -

KMLNRC 84-195 Re: Docket No. STN50-482 Subj: Final.10CFR50.55(e) Report - Excore Neutron Detector Field Cabling.

Dear Mr. Denise:

This letter provides the final report submitted pursuant to 10CFR50.55(e) concerning Excore Neutron Detector field cabling at Wolf Creek Generating Station (WCGS) . This matter was initially reported by Mr. H. K. Chernoff of Kansas Gas and Electric Company (KG&E) to Mr. Robert Taylor of the Nuclear Regulatory Commission, Region IV, on October 9,1984.

During an inspection of two excore neutron detector wells (SE-02 and SE-06) the " field run" triaxial cables, which connect to the detector pigtails, were found damaged apparently as a result of excessive heating. Design drawings indicate that the entire triaxial cable length (including pigtail connectors) should be placed within the conduit which leads to the wall.

Contrary to this, observations revealed that the triaxial cables extended into the detector well space, outside of the conduit. Through further observations the Architect / Engineer (A/E) identified that several removable insulation panels had been removed and never replaced. As a result of this information the A/E has determined that the aforementioned conditions were directly responsible for the triaxial cable damage.

In order to correct the discovered condition, all damaged triaxial cables and connectors will be repaired and/or replaced. Additionally, all insula-tion panels will be verified to be properly reinstalled.

The aforementioned corrective actions will be completed prior to fuel load.

If you have any questions concerning this matter, please contact me or Mr.

Otto Maynard of my staff.

Yours very truly,

,j y /dd GLK:dsn xc:RCDeYoung PO'Connor (2)

ImundY 8411280046 841109 PDR ADOCK 05000482 S PDR 201 N. Market - Wictuta, Kansas - Man Address: PO. Box 208 i W1chtta. Kansas 67201 - Telephone: Area Code (316) 261-6451