Final Deficiency Rept Re Power Supplies to Emergency Core Cooling Actuation Sys,Confirming 800618 Telcon.Bechtel Corp Design Drawings Corrected,Deleting Affected Circuits.B&W Corrections & Plant Conformance Expected by 800930
ML19331D083
Person / Time
Site: Midland
Issue date: 07/17/1980
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19331D076 List:
References
10CFR-050.55E, 10CFR-50.55E, 9311, NUDOCS 8008270232
Download: ML19331D083 (6)


Text

4,.~'

9

'

.

N1dIL

.

- O- ,# ConSumtrS

'

Power James W Cook Company v.a n,a,. au., ~,n, Geneest Of fices; 1942 West Pernell Ross, Jackson, M.chigan 49201 e (5171788 0640 July 17, 1980 Mr J G Keppler, Regional Directer Office of Inspection & Enforce =ent USNuclear Regulatory Co==ission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR PLANT UNIT NO 1, DOCKET NO 50-329 UNIT NO 2, DOCKET NO 50-330 POWER SUPPLIES TO INERGENCY CORE COOLING ACTUATION SYSTD! (ECCAS)

FILE: 0.h.9.h0 UFI: 02210 (s) SERIAL: 9311 This letter confirms the 50.55(e) ites concerning the Emergency Core Cooling Actuation System (ECCAS) Digital Subsyste= 2 Logic Circuitry Drawings, repor-ted by telephone call from M J Schaeffer to R Knop, USNRC Region III, Glen Ellyn, IL, and R Cook, USNRC Midland Resident Inspector on June 18, 1980.

'

The attachments to this letter describe the conditions and actions taken con-cerning this ite=.

This letter is the Final Report on this matter in that the Bechtel design drawings have been corrected. B&W vill have their drawings corrected by September 30, 1980. The ECCAS has not been installed. The only inplace hardware affected consists of three cables, two of which have been ter=inated.

The revised Bechtel Design Drawings deleted these circuits. The Plant will be in conformance by September 30, 1980.

  • WRB/ bit Attach =ent: 1) Manage =ent Corrective Action Re ort (MCAR-1), Report No 39, dated June 18, 1980
2) MCAR-39, Final Report, Power Supplies to Emergency Core Cooling Actuation System (ECCAS), dated July 7, 1980 CC: Director of Office of Inspection and Enforcement Attn: Mr Victor Stello, USNRC (15)

Director of Office of Manage =ent Information and Progra= Control, USIGC (1)

JUL 2 81980 sooszu 2E l -

_ ..

4

~

- OUALITY ASSURANCE PROGRAM Attachment 1

.

.' . MANAGEMENT CURRECTIVE ACTION REPORT

..

' MCAR 1

.

3

  • REPORT NO.

.- 6/18/80 7220009017 O NO. DATE JOB NO.

l ' DESCRIPTION (int.tuding references):

On Jun2 17, 1980, Project Engineering identified a deficiency on the electrical drawings far tha power supplies to the emergency core cooling actuation system (ECCAS) digital cubsystems. B&W Drawing 02-5264ND-03 (VP 7220-M1.32-6-5) correctly shows vital bus A co tha power supply to digital subsystem 1, but incorrectly shows vital bus C as the powIr cupply for digital subsystem 2. Power Thus, a for vital busses A and C is derived from the loss of off-site power from the common casi Iced group and the same battery.

le:d grcup coincident with a battery failure would result in a loss of powcr to both ECCAS digital subsystems, which is a violation of the single failure criteria of RG 1.53

' RECOMMENDED ACTION (Optionsi)

1. Correct electrical drawings
2. Detarmine impact on other systems listed in B&W Balance of Plant Criteria 36-1G< 4513-00, Section 3.3.3
3. Prapare a written report by 7/2/80, in accordance with NQAM, Sect. V. No.10, Para. 4.1.2 DOA MANAGEMENT O .

REFERRED TO a ENGINEERING O CONSTRUCTION

~

.

O PROCUREMENT '

ISSUED BY /I #-//-Id

,c,. P,o,.cica- oei.

I NOTIFIED CUENT 6/17/80 11 REPORTABLE DEFICIENCY Dei.

l

" bM

.[f

'

O NO G YES Mt w,f Dete' l -

'

,. . ...

. '

G CAUSE

'

'

,-

.

e CORRECTIVE ACTION TAKEN AUTHORIZED BY Date STANDARD DISTMBUTION ADDmONAL CRSTRIBUTION AS APPROPRATE FORMAL REPORT TO CLIENT Dow In (if Section 11 Applies) a" .<

" ""

En"et E c=r cxus"m oc7o.aIn CORRECTIVE ACTION IMPLEMENTED gyc, . g Pe

_,

? m m e o U "u*a"n N.No"w.en o, oo nUU" VERIFIED BY Proiect OA Engnew Date o e .- _ - - e m an.ans ~

~v..- .

- . . - ,

,

.-

.

Attachm nt 2

. .

.

.

.

Cuhjeet: McA". 1" (I r.sur"i 6/19/90 Powr Supnlies to rnervency Core Cooline .9ct ust ton Synten (TCCAC)

Final Perort Date: July 7, larn Project: Consu~ers power Company Midland plant finite 1 4 2 Rechtel Job 7??O

-

b.

Introduction:

This report is sub-itted to provide information on the final Pechtel action pursuant to itCAn 30 (CCCAS Power Supplien) .

Dencription of Discrepancy:

Enring the course of review of TU' drawinc 02-5264 "D-03 (v.r. 72?0- 11.3?-6-;)

by acchtel, it was noted that the pocor supply to the FCCAS dief tal subsyste- I is shown from vital bun A and the supply to ECCAS digital subsysten 2 is sho::n fron vital bus C. The drawing also shous s -15 voir control sinnal to ECCAF dir. ital subsystea 2 fro- r.CCAS analog subsysten 3. cubsecuent review.of Pechtel sche .iric 7?20-n-374(Q) revealed the so-c situation. In accordance with the recu're ents or sect. 3.3.3 of EM' halance of plant criteria for plant electric systen (el" docu,ent 36-10o4513-00, V.n. 7?20-?!1.J-1-1) and TSA" fir.ure 7.'-1 (TCCAS block diagra :), the trC/.r. dinital nuksyste,I should he pouered fror -

vital hun A and rCCAS dinital subsysten 2 fron vital bus t. The -15 volt con-trol signal to ECCAS dinital subsysten 7 should he fron F.CCAS analor nuhsysten 2.

Thus, based on the PM.' drawinn and the P.echtel schcratic, a postulated event nasumine a loss of pouer fron the connon load group coincident with a failure of the associated hattery, vould result in a loss of power to both CCCAF dirital subsystens, since both huses /. and C would be lost sicultaneously (see attached figure).

Cause:

The apparent cause of this discrepancy was due to a misinterpretation of the

!!idland plant 120 Vac preferred (vital) power syste , specifically the elec-trical load'groupinp. The '!idland 12n Vac preferred po'rer systee, which powers the ECCAS, is served by a tuo battery schene, where each hattery serves two protection channel huses.

The attached Figure shows the two battery schenc with the correspondinn bus labelinp. and ECCAS dipital subsystem hus assinnments.

.-

,

Safet" Implient f on:

r,CCAr d i a i t :1 subsyst @ are renponsibic for t rans*i t t in;', actuat inn si:'.nals, in all como,ents g gassociated

%' uitb the crer:'ency core coolin; syste'

("CCF). The identified discrepancv could result in a Inns of power to both E CC?." d i .a.i t e l ruhryete n. Accordier to "U! s sten doncription for EcrAS (v.c. 7 2 2 0-:'1.12

  • 6-1 ) , l os s of a vital bus producen a cannot-trip condition in a dinital subsysten. Therefore, the reported deficiency would prevent both manuni an:t automat ic actuation of both ECCAS dinital subsystem channels therehy preventing the r,CCS fron functioning.. This condition is in violation of the sincic failure criterion (reference Penulatory cuide 1.%3).

Corrective Action:

The follovine actions have been taken:

1) The rCCAS supplier, P.M', uns contactci and inforced of the discrepancy (reference: Ecchtel Intter PE"-1452, dated 6/25/RO).
7) EP? concurred with the evaluation and agreed to correct "6" drawinns to show EcCAS dirital subsysten 2 powered fron vital bus P and -15 volt control sinr.a1 fron ErCAS analoc subsyste, 2.
3) Drau i na. chana.c notices correctinn the discrepancy have been issuei for the followin.c electrical drauinr,s:

a) 77?o-C-31(0) DC" ?? dated 6/In/co Panel schedules 6C'; #10 dated 6/le/?.0 panel schedulen b) 7??o-C-32(0) c) 7? p n_r._37 r (c) PC" l2 dated A/2n/PO ECCAS schematic d) 772n-E-37 DC'? P411 dated 6/23/E0 circuit schedule .

rote: nrawine 7220-C-900 (Connection list) will reficct the above channes in the next nonthly revision

4) Other systens listed in P.&" halance of plant criteria 3A-lo04513-90, sect'.in 3.3.3, have been reviewed for sinilar discrepancies.

RPS - Reactor Protection Systen, has four subsystems powered fron vital buses A thru D.

Drawinns reviewed:

Bechtel Dravine No. BMI Dravinc !'o .

Subsysten 1 E-17n(0), Sh 7 DR050136E Subsysten 2 E-370(0), Sh 9 Dn05914Rr.

Subsysten 3 0-37n(0), Sb 8 DR05016nt Subsysten 4 E-370(Q), Sh A D8050172C No discrepancies were found.

. .. - -

--

.,

. .

..

.

-

-tie:ttn , t' I *iscre nneer era ennciscre* to 1.e I' . iti Lit 1e 19 o' t! ' co n' i a :'e r.i2 e an1.s t i nn s ,

... .. r t ..a on .is.nc r , r, . . . c 00934.3 lY Subiitted by: l hs. ,-

jM Ed Approved by: , C.c L \.) Cb tnc,

/

Conctirrence by:

'

// 7 f.

Concurrence by:hJf.. S /M fA&tirSoc.l PTC/pjb Attach ent: Tuo "at t ery Tchcae Firtire

.

9

.

- _ .. _. . . _ _. .

.

-

ATTACHNE NT TO FINAL REFbRT

,, .

. JOB 72 20 - MC AR 39

-

.- DATE D JULY 2. ,19 80 009348 toAo stou r I LOAD csRDOP 2C

- .-

INY ENV i'N'T IMV 60S A E05 C. 605 B 805 D l

.

I I

^

If ECCAS-1 ECIAS EffA's- 2.

C PRCSCHT DCSfM) { CDCEcTED DES /GN)

TM)O BATTERY .5cMENG

- - . . . . - . . -

_ _ .

- . - . . . -

_ _ _ _ _