ML19344D107

From kanterella
Revision as of 18:01, 3 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Update to Deficiency Rept SD/413-414/79-1 Re Defective Welds in Unit 1 Main Control Boards.Eight Control Panels Previously Not Inspected Found to Be Acceptable W/No Repairs Required
ML19344D107
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/03/1980
From: Parker W
DUKE POWER CO.
To:
References
NUDOCS 8003110340
Download: ML19344D107 (1)


Text

.

Duzz Powza COMPANY )

Powna Burtorwo l

422 Socra Cavaca Srazzr.CnAnt.ortz N.C. sea 4a I

W4WAM C PARRER.JR.

MCr PassaOTuv TELEPwomC AAEa 704 Strane Pocouction 373-4ce3 March 3, 1980 l

l

,

Mr. J. P. O'Reilly, Director U. S. Nuclear Reguistory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 ,

l Re: Catawba Nuclear Station Units 1 and 2 i

Docket Nos.: 50-413 and 50-414

.

Dear Mr. O'Reilly:

On July 20, 1979, Duke Power Company submitted 10CFR 50.55e Report SD/413-414/79-1. This report described defective welds in the Unit 1 main control boards. As noted under Corrective Action in that

  • report, inspection of eight miscellaneous control panels had not' been completed. All of these control panels have .now been inspected.

All were found to be acceptable and no repairs were required.

V ry truly yours,

/

vo- - (,b .

lWilliamO. Parker,J. .

ROS:vr cc: Director, Office of Inspection and Enforcement gnoon,

4, Qf 3  % 56

5 jO th Anniversary

% wen #

8003110 3 9 6 l