Text
f
~
]
Duxe POWER GOMPANY P.O. box 33180 CHARLOTrE, N.C. 28242
' HAL B. TUGKER n
- ymtepuoy, d =Y== 1=
'Nohem h 15%$ l lg Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Re: Catawba Nuclear Station,' Unit 2 Docket No.= 50-414 Significant Deficiency No. 414/85-11
Dear Dr. Grace:
In reviewing the schedule of those high priority modifications required to be~ completed prior to fuel loading, we have determined that the corrective action for this deficiency does not warrant completion by fuel load as stated in our response of October 24, 1985.
In our response the final radiation analysis showed no adverse effect of the penetration streaming post-LOCA on safety-related equipment.
Imple-mentation of the corrective action will, however, reduce radiation levels during normal and post-accident operations.
-We'have initiated the Nuclear Station Modification (NSM) for this project.
-and will complete it as time and materials permit.
In the interim, administrative controls are being implemented to control personnel-access in the penetration area during incore instrument movement until these
- shielding modifications are complete.
Very truly yours, 3>
' fh. &
l Hal B. Tucker LTP:slb cc: Director INP0 Records Center Office of Inspection and Enformcement Suite 1500 U. S. Nuclear Regulatory Commission 1100 Circle 75 Parkway
' Washington, D. C.
20555 Atlanta, Georgia 30339 NRC Resident Inspector Catawba Nuclear Station 8511210523 951105 PDR ADOCK 05000414 IQ me