January 2005 Monthly Operating Report for Turkey Point, Units 3 and 4
ML050540563
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/14/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-039
Download: ML050540563 (3)


Text

FEB 1 4 2005 FPL L-2005-039 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - January 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

- Fl-a

_1 ' f DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 2/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period January, 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 - _____- _ _;__. _

Maximum Dependable Capacity (MWe-Net) 693 --- -  ;. -..---

Month Year-to-date Cumulative No. of hours reactor was critical 651 651 210264.7 No. of hours generator was on line (service hours) 583.4 583.4 207659.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 378721 378721 135917386 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action! Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20050004 12/28/2004 F 160.5 A 4 Generator Exciter cooling water leak (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 had been shut down since December 28h, 2004, due to a cooling water leak in the Generator Exciter, resulting in an unplanned manual trip. Unit 3 returned to power January 7h, 2005 and remained at essentially 100% power until January 28*, 2005. On this date, Unit 3 was down-powered in order to clean grass from the condenser water boxes and tubes. The unit continued to operate at essentially 60% power through the end of the month.

I- -V DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 2/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period January. 2005 Design Electrical Rating (MWe-Net) 720 -

Maximum Dependable Capacity (MWe-Net) 693 -;  :- _- __  ; __. -

Month Year-to-date Cumulative No. of hours reactor was critical 744 744 208885.2 No. of hours generator was on line (service hours) 744 744 204385.3 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 534712 534712 135135463 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of January.

Text

FEB 1 4 2005 FPL L-2005-039 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - January 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

- Fl-a

_1 ' f DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 2/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period January, 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 - _____- _ _;__. _

Maximum Dependable Capacity (MWe-Net) 693 --- -  ;. -..---

Month Year-to-date Cumulative No. of hours reactor was critical 651 651 210264.7 No. of hours generator was on line (service hours) 583.4 583.4 207659.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 378721 378721 135917386 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action! Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20050004 12/28/2004 F 160.5 A 4 Generator Exciter cooling water leak (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 had been shut down since December 28h, 2004, due to a cooling water leak in the Generator Exciter, resulting in an unplanned manual trip. Unit 3 returned to power January 7h, 2005 and remained at essentially 100% power until January 28*, 2005. On this date, Unit 3 was down-powered in order to clean grass from the condenser water boxes and tubes. The unit continued to operate at essentially 60% power through the end of the month.

I- -V DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 2/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period January. 2005 Design Electrical Rating (MWe-Net) 720 -

Maximum Dependable Capacity (MWe-Net) 693 -;  :- _- __  ; __. -

Month Year-to-date Cumulative No. of hours reactor was critical 744 744 208885.2 No. of hours generator was on line (service hours) 744 744 204385.3 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 534712 534712 135135463 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of January.