ML050680229

From kanterella
Revision as of 12:27, 23 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Millstone Nuclear Power Plant for Calendar Year 2004
ML050680229
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/09/2005
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
Shared Package
ML050620395 List:
References
Download: ML050680229 (5)


Text

No.05-006 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 14, 2005 Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station, Units 2 and 3 Docket Nos. 50-336 and 50-423 Date/Time: March 29, 2005 at 3:00 p.m.

Location: Lelan F. Sillin Training Facility Rope Ferry Road Waterford, CT 06385

Purpose:

The NRC requested an Annual Assessment Meeting with Dominion Nuclear Connecticut management to discuss NRCs assessment of the safety performance of the Millstone Nuclear Power Plant for calendar year 2004. NRCs assessment is documented in a letter dated March 2, 2005.

Attendees:

NRC: A. Blough, Director, Division of Reactor Projects, Region I P. Krohn, Chief, Project Branch 6, Division of Reactor Projects S. Schneider, Senior Resident Inspector, Millstone S. Kennedy, Resident Inspector, Millstone K. Mangan, Resident Inspector, Millstone M. Heath, Reactor Engineer, Millstone Licensee: A. Price, Site Vice-President S. Jordan, Director, Nuclear Engineering S. Sarver, Director, Nuclear Operations and Maintenance S. Scace, Director, Nuclear Station Safety and Licensing S. Heard, Manager of Nuclear Oversight Department Public Participation: This is a Category 1 Meeting. The public is invited to observe these meetings. After the business portions, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion Nuclear Connecticuts performance at Millstone and the role of the agency in ensuring safe plant operations.

NRCs assessment letter can be found in ADAMS with an accession number of ML050610512.

This meeting Notice with attached meeting agenda can be located in ADAMS with an accession number of ML050680229. The NRC slides for the meeting can be accessed with the accession number ML050730393. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Millstone Station can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Paul Krohn, Chief - Projects Branch 6 (610) 337-5120 E-mail: pgk1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 22, 2004 via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: _______/RA/____________

Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects

3 Distribution:

D. A. Christian, Sr. Vice President and Chief Nuclear Officer J. A. Price, Site Vice President - Millstone C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations W. Meinert, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford V. Juliano, Waterford Library J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

Agenda NRCs Annual Assessment Meeting Millstone Power Station March 29, 2005 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Millstone Station Performance . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Dominions Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dominion (20 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

5 Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA J. Wiggins, DRA P. Krohn, DRP K. Jenison, DRP S. Lee, RI OEDO D. Roberts, NRR V. Nerses, NRR G. Wunder, NRR S. Schneider, Senior Resident Inspector E. Bartels, Resident OA P. Krohn, RI K. Jenison, RI T. Madden, OCA D. Screnci, PAO N. Sheehan, PAO R. Bores, SLO G. Matakas, ORA PMNS Region I Docket Room (with concurrences)

Document Name: E:\Filenet\ML050680229.wpd SISP Review Complete:_____PGK_______ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME KJenison/PGK PKrohn/PGK for DATE 03/14/05 03/14/05 OFFICIAL RECORD COPY