Annual Assessment Meeting Notice - 2018
ML18081A266
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/22/2018
From: Daniel Schroeder
Reactor Projects Branch 2
To:
References
MN 18-009
Download: ML18081A266 (3)


Text

MN No.18-009 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 22, 2018 Licensee: Dominion Energy Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket Nos: 50-336 and 50-423 Date/Time: Wednesday, April 4, 2018 6:00 p.m. to 8:00 p.m.

Location: Waterford Public Library 49 Rope Ferry Road Waterford, CT 06385

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will meet with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss NRCs assessment of the safety performance at the Millstone Power Station for 2017, as described in the annual assessment letter dated February 28, 2018. The NRC will respond to questions by NEAC members and then the public on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: M. Gray, Acting Deputy Director, Division of Reactor Projects (DRP)

D. Schroeder, Branch Chief, Projects Branch 2, DRP T. Setzer, Senior Project Engineer J. Fuller, Senior Resident Inspector C. Highley, Resident Inspector R. Guzman, Senior Project Manager, Office of Nuclear Reactor Regulation J. Greives, State Liaison Officer NEAC Attendees: K. Ryan, Chairman Quorum of NEAC Committee Membership Public Participation: This is a Category 3 Meeting. Public attendance at NEAC meetings is permitted and encouraged in accordance with their charter. The NRC staff will discuss performance at Millstone Power Station during calendar year 2017, and will answer questions and discuss issues or concerns related to Millstone Power Station during the NEAC meeting.

Meeting

Contact:

Daniel L. Schroeder, Branch Chief, Projects Branch 2 610-337-5262 E-mail: Daniel.Schroeder@nrc.gov

2 The NRCs annual assessment letter regarding Millstone Power Station performance during 2017 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18058A050. ADAMS is accessible from the NRCs website at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Millstone Power Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRCs website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by March 30, 2018, via telephone to the NRC meeting contact. Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRCs website under public meetings.

Approved by: /RA/

Daniel L. Schroeder, Branch Chief Projects Branch 2 Division of Reactor Projects cc: Distribution via ListServ

ML18081A266 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer/DLS for DSchroeder/DLS DATE 3/22/18 3/22/18