Notice of Public Meeting - Annual Assessment Meeting for Millstone Power Station
ML22069A947
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/10/2022
From: Matt Young
NRC/RGN-I/DORS
To:
Dominion Energy Nuclear Connecticut
Young M
References
Download: ML22069A947 (3)


Text

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 10, 2022 Licensee:

Dominion Energy Nuclear Connecticut, Inc.

Facility:

Millstone Power Station, Units 2 and 3 Docket Nos:

50-336 and 50-423 Date/ Time:

Thursday, March 24, 2022 - 7:00 p.m.

Location:

Webinar

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will join a webinar to meet with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss NRCs assessment of safety performance at the Millstone Power Station for 2021, as described in the annual assessment letter dated March 2, 2022. The NRC will respond to questions from NEAC members and then the public on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: M. Young, Chief, Projects Branch 2, Division of Operating Reactor Safety J. Fuller, Senior Resident Inspector E. Bousquet, Resident Inspector E. Allen, Resident Inspector R. Guzman, Project Manager, Plant Licensing Branch I NEAC Attendees:

NEAC Committee Membership Public Participation: This is an Information Meeting with a Question and Answer Session.

Public attendance at NEAC meetings is permitted and encouraged in accordance with its charter. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance for Millstone Power Station during 2021. During the presentation, members of NEAC will have the opportunity to ask questions. Then, following the presentation and NEAC member questions, members of the public will have the opportunity to ask questions specific to the safety performance of Millstone Power Station and the NRCs role in ensuring safe plant operations. Those wishing to submit questions can do so verbally during the webinar. The NRC staff will provide guidance during the webinar on how to ask a question. Alternatively, questions may be submitted in advance to matt.young@nrc.gov.

2 This is a virtual public meeting where participants will be able to see the presentation on a computer screen and hear the presenters through their devices speaker system. There is also the option to join via phone with a call-in number.

Bridge Number Phone Conference ID Teleconference:

(301) 715-8592 94164655678#

URL Meeting Number Passcode Webinar https://ctdeep.zoom.us/j/94164655678 941 6465 5678 N/A If you have any questions or should need assistance concerning joining the meeting, please call or email the meeting contact.

Meeting

Contact:

Matt R. Young, Projects Branch 2 (610) 337-5205 Email: Matt.Young@nrc.gov The NRCs annual assessment letter regarding Millstone Power Station performance during 2021 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession Number ML22060A036. ADAMS is accessible from the NRCs website at: www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRCs annual assessment process and the safety performance of Millstone can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective March 19, 2021, applies to this meeting. The policy statement may be found on the NRC website, https://www.govinfo.gov/content/pkg/FR-2021-03-19/pdf/2021-05787.pdf.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this webinar, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests will be made on a case-by-case basis. Persons requiring assistance to attend the webinar shall make their requests known to the NRC meeting contact no later than two business days prior to the March 24, 2022, meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

Approved by:

Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety cc: Distribution via ListServ Matthew R.

Young Digitally signed by Matthew R.

Young Date: 2022.03.10 16:45:32

-05'00'

ML22069A947 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/ORA RI/DORS NAME LCline DTifft MYoung DATE 3/10/22 3/10/22 3/10/22