Notice of Licensee Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Preliminary White Finding Identified During Special Inspection at Millstone Unit 2, Completed in April 2011
ML111650357
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/15/2011
From: Hansell S
Operations Branch I
To:
Shared Package
ML111650467 List:
References
MN-11-024, EA-11-047
Download: ML111650357 (4)


Text

UNITED STATES NUCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSlA. PA 19406-1415 June 15, 20LL MN No.11-024 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee. Dominion Nuclear Connecticut. lnc.

Facility: Millstone Power Station Unit 2 Docket No.: 50-336 EA No.: 11-047 Date/Time. June 30, 201 1 1:00 p.m. to 3:00 p.m.

Location: NRC Region I Office, Public Meeting Room 475 Allendale Road King of Prussia, PA 19406

Purpose:

Dominion Nuclear Connecticut requested a Regulatory Conference with the NRC to discuss a preliminary White finding that was identified during a special inspection at Millstone Station, Unit 2, completed in April 2011.

The finding involved apparent violations of NRC requirements associated with failure of Millstone personnel to carry out their assigned roles and responsibilities and inadequate reactivity management during main turbine control valve testing on February 12,2011. The conference will include a discussion of the significance determination for the finding and whether enforcement action is warranted.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.

Attendees:

NRC: W. Dean, RegionalAdministrator, Region I C. Miller, Director, Division of Reactor Safety, Region I D. Roberts, Director, Division of Reactor Projects, Region I D. Jackson, Chief, Projects Branch 5, Region I S. Hansell, Chief, Operations Branch, Region I W. Cook, Senior Reactor Analyst, Region I D. Holody, Team Leader, Enforcement, Region I

2 A. J. Jordan, Site Vice President R. MacManus, Director Nuclear Station Safety and Licensing K. Grover, Operations Manager L. Armstrong, Training Manager B. Willkens, Nuclear SPecialist W. Bartron, Station Licensing Supervisor Samuel L. Hansell, Chief, Operations Branch (610) 337-5046 E-mail: samuel.hansell@nrc.qov Marjorie M. McLaughlin, Senior Enforcement Specialist (610) 337-5240 E-mail: mariorie.mclauqhlin@nrc.gov This meeting notice with the enclosed agenda can be located in the Agencywide Documents Access and-Management System (ADAMS) with Accession Number ML111650357. lnspection Report 05000336/2Ot t OO8, which discusses the issues associated with this finding, can be located in ADAMS with Accession Number ML111470484. ADAMS is accessible from the NRC Web Site at: http:l/www.nrc.gov/reading-rm/adams'html .

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement can be found on the NRC website, http://www.nrc.oov/readino-rm/doc-collections/commission/policy/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to an NRC meeting contact no later than two business days prior to the meeting.

Interested members of the public can participate in this meeting via toll-free teleconference. For details please contait one of the NRC's meeting contacts. Attendance by NRC personnel at this meeting should be made known by June 27 ,2011, via telephone to an NRC's meeting contact.

Approved By:

Operations Branch Division of Reactor Safety cc Wencl: Distribution via ListServ

3 Distribution w/encl: (via email)

Deputy Executive Director for Reactor Programs, OEDO Director, Office of Nuclear Reactor Regulation, NRR Deputy Director, Office of Nuclear Reactor Regulation (NRR/ADPR)

Director, Division ofLicensing Project Management Project Directorate l-1 (PD1l2), NRR Project Manager, NRR W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard, Rl OEDO D. Screnci, ORA N. Sheehan, ORA K. Farrar, ORA N. McNamara, ORA R. Barkley, ORA D. Jackson, DRP T. Setzer, DRP D. Dodson, DRP S. Shaffer, DRP, SRI B. Haagensen, Rl J. Krafty, DRP, Rl C. Kowalyshyn, OA C. O'Daniell, ORA D. Bearde, DRS RidSNRRPM Millstone Resource RidsNRRDorlLpl 1 -2 Resource ROPreportsResource PMNS SUNSI Review Complete: JC Initials)

ADAMS PACKAGE NO.: M1111650467 -(Reviewer's ADAMS ACCESSION NO.: Ml111650357 DOCUMENT NAME: G:\DRS\OPERATIONS BRANCH\CARUSO\MILLSTONE REG CONF.DOC After declaring this document "An Official Agency Record," it will be released to the Public.

To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure "E" = Copy with attachmenVenclosure "N" = No OFFICE RI/DRS RI/DRS RI/ORA RI/DRP NAME PPresby/PP SHansell/JC DHolody/MMM DJacksonDJ w/edits DATE 06t14t11 6t15t11 06115111 6114111 OFFICIAL RECORD COPY Enclosure

Agenda NRC Requlatory Conference Millstone June 30. 201 1 lntroductions NRC (5 minutes)

Discussion of Regulatory Process NRC (5 minutes)

Finding Details and Significance Determination NRC (15 minutes)

Dominion Provides Additional Information Dominion (30 minutes)

NRC Questions and Dialogue Dominion (55 minutes)

Closing Remarks NRC (10 minutes)