Invitation Letters for Millstone Annual Assessment Public Meeting on 29 March 2005
ML051460308
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/17/2005
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To: Christopher Cook, Eccard P, Fraser W, Glover J, Horton J, Levy S, Lieberman J, Moukawsher T, Prague E, Ritter E, Sherrard J, Simmons R, Stillman A, Urban D, Watson H
Suffolk County, NY, Office of the County Executive, Town of Groton, CT, Town of New London, CT, Town of Niantic, CT, Town of Southold, NY, Town of Waterford, CT, US Congress, US HR (House of Representatives), US SEN (Senate)
Krohn P, RI/DRP/PB6/610-337-5120
Shared Package
ML050620395 List:
References
Download: ML051460308 (30)


Text

March 17, 2005 The Honorable Joseph I. Lieberman United States Senate 316 Hart Senate Office Washington, DC 20510

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Lieberman:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Senator Lieberman 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 Paul Eccard First Selectman 15 Rope Ferry Road Waterford, CT 06385

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Eccard:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Mr. Eccard 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 Wayne Fraser First Selectman P.O. Drawer 519 Niantic, CT 06357

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Fraser:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Mr. Fraser 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Harry Watson Mayor, Town of Groton 45 Fort Hill Road Groton, CT 06340

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Watson:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Mayor Watson 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Jane Glover Mayor, New London 181 State Street New London, CT 06320

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Glover:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Mayor Glover 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Catherine W. Cook State Senator 43 Pequot Avenue Mystic, CT 06355

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Cook:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Senator Cook 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Ted Moukawsher State Representative 48 West Elderkin Avenue Groton, CT 06340

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Rep. Moukawsher:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Rep. Moukawsher 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Edith Prague State Senator 145 Route 87 Columbia, CT 06327

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Prague:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Senator Prague 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Diane Urban State Representative 146 Babcock Road North Stonington, CT 06359

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Rep. Urban:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Rep. Urban 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Andrea Stillman State Senator 5 Coolidge Court Waterford, CT 06385

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Stillman:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Senator Stillman 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 Mr. James Sherrard 66 Algonquin Drive Mystic, CT 06355

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Sherrard:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Mr. Sherrard 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Elizabeth Ritter State Representative 24 Old Mill Road Quaker Hill, CT 06374

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Rep. Ritter:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Rep. Ritter 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Rob Simmons Unites States Congressman 2 Courthouse Square, Suite 5 Norwich, CT 06360

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Congressman Simmons:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Congressman Simmons 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 The Honorable Joshua Horton Supervisor, Town of Southold 53095 Main Road, Route 25 Southold, NY 11971

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Horton:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Mr. Horton 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 17, 2005 Steve Levy Suffolk County Executive 100 Veterans Memorial Highway P.O. BOX 6100 Hauppauge, NY 11788-0099

SUBJECT:

MILLSTONE POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Levy:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut, Inc.

(DNC) in which the NRC staff will discuss with Dominion our annual assessment of the safety performance of Millstone Power Station Unit 2 and Unit 3. The meeting will be held at 3:00 p.m.

on March 29, 2005, at the Lelan F. Sillin Training Facility, Rope Ferry Road, Waterford, CT 06385. At the meeting, we will briefly discuss our Reactor Oversight Process and then discuss with DNC our assessment of their safety performance of Millstone Power Station and their response to our assessment.

You are also invited to attend a meeting between the NRC and the Connecticut Nuclear Energy Advisory Council (NEAC) in which the NRC staff will discuss our annual assessment of Millstone performance with NEAC members. The meeting will be held at 6:00 p.m. on March 29, 2005, at the Waterford Town Hall, 15 Rope Ferry Road, Waterford, CT 06385.

Both meetings are open to the public for observation. Following the meetings, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Millstone and the role of the NRC in ensuring safe plant operations. Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at either meeting.

The NRC recently completed its annual assessment of the safety performance of the Millstone Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2004 through December 31, 2004. We described our assessment results in a letter to DNC on March 2, 2005. A copy of this letter is enclosed. The assessment letter, the NRCs meeting notice with meeting agenda for Millstone and the NRC's meeting notice with agenda for NEAC can be found in the NRCs online document system (ADAMS) by accession numbers ML050610512, ML050680229 and ML050730371. The draft Millstone Station meeting slides can be found in ADAMS by accession number ML050730393 and the draft NEAC meeting slides can be located by accession number ML050760140. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Mr. Levy 2

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance of Millstone through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Your schedule permitting, I look forward to meeting you on March 29, 2005. In the interim, please do not hesitate to contact me at 610-337-5120, if I can be of further assistance to you.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated