Notice of Public Meeting - Annual Assessment Meeting for Millstone Power Station
ML23061A008
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/02/2023
From: Matt Young
NRC/RGN-I/DORS
To:
References
Download: ML23061A008 (1)


Text

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 2, 2023 Licensee:

Dominion Energy Nuclear Connecticut, Inc.

Facility:

Millstone Power Station, Units 2 and 3 Docket Nos:

50-336 and 50-423 Date/ Time:

Thursday, March 16, 2023 6:30 p.m.

Location:

Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will host a meeting with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss NRCs assessment of safety performance at the Millstone Power Station for 2022, as described in the annual assessment letter dated March 1, 2023. Following the meeting, the NRC will respond to questions from members of the public and NEAC members on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: M. Young, Chief, Projects Branch 2, Division of Operating Reactor Safety J. Fuller, Senior Resident Inspector E. Allen, Resident Inspector E. Bousquet, Resident Inspector J. DeBoer, Senior Project Engineer S. Elkhiamy, Senior Project Engineer NEAC Attendees:

NEAC Committee Membership Public Participation: This is an Information Meeting with a Question and Answer Session.

Public attendance at NEAC meetings is permitted and encouraged in accordance with its charter. The meeting will begin with a presentation by NRC staff on the NRCs assessment of performance for Millstone Power Station during 2022. Following the presentation, NEAC members and members of the public will have the opportunity to ask questions specific to the safety performance of Millstone Power Station and the NRCs role in ensuring safe plant operations. Questions may be submitted in advance to matt.young@nrc.gov.

If you have any questions, please call or email the meeting contact.

Meeting

Contact:

Matt R. Young, Projects Branch 2 (610) 337-5205 Email: Matt.Young@nrc.gov

2 The NRCs annual assessment letter regarding Millstone Power Stations performance during 2022 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession Number ML23058A256. ADAMS is accessible from the NRCs website at: www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRCs annual assessment process and the safety performance of Millstone Power Station can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective March 19, 2021, applies to this meeting. The policy statement may be found on the NRC website, https://www.govinfo.gov/content/pkg/FR-2021-03-19/pdf/2021-05787.pdf.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the March 16, 2023, meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

Approved by:

Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety cc: Distribution via ListServ Matthew R.

Young Digitally signed by Matthew R.

Young Date: 2023.03.02 07:20:56

-05'00'

ML23061A008 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/ORA RI/DORS NAME JDeBoer DTifft/RMcKinley for MYoung DATE 3/1/23 3/1/23 3/1/23