ML12093A096

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Connecticut Nuclear Energy Advisory Council (Neac), to Discuss Millstone Power Station Performance During Calendar Year 2001
ML12093A096
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/02/2012
From: Bellamy R
NRC/RGN-I/DRP/PB5
To:
Bellamy R
Shared Package
ML12058A411 List:
References
Download: ML12093A096 (4)


Text

MN No.12-017 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 2, 2012 Licensee: Dominion Nuclear Connecticut, Inc.

Facilities: Millstone Power Station Docket Nos: 50-336 and 50-423 Date/ Time: Thursday, April 19, 2012 7:00 p.m. to 9:00 p.m.

Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will meet with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss NRCs assessment of the safety performance at the Millstone Power Station for 2011.

NRC Attendees: P. Wilson, Deputy Director, Division of Reactor Safety R. Bellamy, Ph.D., Chief, Division of Reactor Projects, Branch 5 S. Shaffer, Senior Resident Inspector J. Ambrosini, Incoming Senior Resident Inspector B. Haagensen, Resident Inspector J. Krafty, Resident Inspector G. Wilson, Chief, Division of Plant Licensing, Branch 1 C. Sanders, Project Manager NEAC Attendees: W. Sheehan, Chairman Quorum of NEAC Committee Membership Public Participation: This is a Category 3 Meeting. The NRC will hold a meeting with NEAC to discuss Millstone Power Station performance during calendar year 2011.

The public will have an opportunity to ask the NRC questions and discuss issues or concerns related to Millstone Power.

Meeting

Contact:

Ronald R. Bellamy, Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRCs annual assessment letter regarding Millstone Power Station performance during 2011 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML12061A240. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs annual assessment process and the safety performance of Millstone Power Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 16, 2012, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Ronald R. Bellamy, Ph.D., Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ

ML12093A096 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME EKeighley RBellamy DATE 04/02/12 04/02/12 3

Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance April 19, 2012 7:00 p.m. to 9:00 p.m.

Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385 Formal Meeting Introduction Discussion of Millstone Power Station Performance in 2011 ............................. NRC (10 minutes)

NEACs Response and Questions .................................................................... NEAC (as needed)

NRC to address public questions.......NRC/Members of the Public (as needed)

Closing Remarks.................................................................................................. NRC (5 minutes)