ML051660247

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting on Appeal of FAQ Scrams W/Lonhr for Millstone
ML051660247
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/30/2005
From: Jacqueline Thompson
NRC/NRR/DIPM/IIPB
To: Richards S
NRC/NRR/DIPM/IIPB
Thompson JW, NRR/DIPM/IIPB, 415-1011
References
Download: ML051660247 (4)


Text

June 30, 2005 MEMORANDUM TO: Stuart A. Richards, Chief Inspection Program Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation FROM: John W. Thompson, Senior Reactor Operations Engineer Inspection Program Branch/RA/

Division of Inspection Program Management Office of Nuclear Reactor Regulation

SUBJECT:

PUBLIC MEETING

SUMMARY

ON THE REACTOR OVERSIGHT PROCESS OPEN FREQUENTLY ASKED QUESTIONS ON THE SCRAMS WITH LOSS OF NORMAL HEAT REMOVAL PERFORMANCE INDICATOR On June 14, 2005, a public meeting on the reactor oversight process (ROP) performance indicator (PI) frequently asked questions (FAQs) concerning Scrams with the Loss of Normal Heat Removal was held at the One White Flint North Building, Room 13B4. Attachments 1 and 2 contain the attendance list and agenda for the meeting. Attachment 3 contains the presentation slides used during the meeting.

The public meeting was a FAQ appeal meeting between the staff and Dominion Resources, the licensee for the Millstone Unit 2 Power Station, conducted in accordance with the guidance contained in Appendix E to NEI 99-02, Revision 3, Regulatory Assessment Performance Indicator Guideline. The staff and industry presented their positions on one open FAQ on the Scrams with Loss of Normal Heat Removal PI. No decisions regarding PI reportability were made during the meeting.

Attachments: 1. Attendance List for June 14, 2005 meeting

2. Agenda
3. Licensee Slide Presentation on FAQ 36.9, Trip with Loss of Normal Heat Removal CONTACT: John Thompson NRR/DIPM 301-415-1011

MEMORANDUM TO: Stuart A. Richards, Chief Inspection Program Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation FROM: John W. Thompson, Senior Reactor Operations Engineer Inspection Program Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation

SUBJECT:

PUBLIC MEETING

SUMMARY

ON THE REACTOR OVERSIGHT PROCESS OPEN FREQUENTLY ASKED QUESTIONS ON THE SCRAMS WITH LOSS OF NORMAL HEAT REMOVAL PERFORMANCE INDICATOR On June 14, 2005, a public meeting on the reactor oversight process (ROP) performance indicator (PI) frequently asked questions (FAQs) concerning Scrams with the Loss of Normal Heat Removal was held at the One White Flint North Building, Room 13B4. Attachments 1 and 2 contain the attendance list and agenda for the meeting. Attachment 3 contains the presentation slides used during the meeting.

The public meeting was a FAQ appeal meeting between the staff and Dominion Resources, the licensee for the Millstone Unit 2 Power Station, conducted in accordance with the guidance contained in Appendix E to NEI 99-02, Revision 3, Regulatory Assessment Performance Indicator Guideline. The staff and industry presented their positions on one open FAQ on the Scrams with Loss of Normal Heat Removal PI. No decisions regarding PI reportability were made during the meeting.

Attachments: 1. Attendance List for June 14, 2005 meeting

2. Agenda
3. Licensee Slide Presentation on FAQ 36.9, Trip with Loss of Normal Heat Removal CONTACT: John Thompson NRR/DIPM 301-415-1011 DISTRIBUTION:

IIPB r/f PUBLIC Accession Number: ML051660247 OFFICE DIPM/IIPB DIPM/IIPB NAME JWThompson JAndersen DATE 06/28/05 06/30/05 OFFICIAL RECORD COPY

ATTENDANCE LIST INDUSTRY/STAFF MILLSTONE LONHR FAQ PUBLIC MEETING OWFN 13B4 June 14, 2005 NAME AFFILIATION

1. John Thompson NRC
2. James Andersen NRC
3. John Butler NEI
4. Bruce Boger NRC
5. Stacey Wilson NRC
6. Stu Richards NRC
7. Chris Czerwonka member of the public (participation by phone)
8. Max Schneider NRC (participation by phone)
9. David Werkheiser NRC (participation by phone)
10. Don Olson Dominion
11. Jim Knuze DNC/Millstone
12. David Wrona NRC Attachment 1

LOSS OF NORMAL HEAT REMOVAL PERFORMANCE INDICATOR FREQUENTLY ASKED QUESTION RESOLUTION AGENDA June 14, 2005 1:00 - 2:30 p.m. OWFN 13B4 1:00 p.m. Introductions and Explanation of FAQ Appeal Process (Appendix E to NEI 99-02) 1:05 p.m. Overview of FAQ 36.9 (Discussion by Millstone Licensee) 1:30 p.m. NRC Staff Comments 1:45 p.m. Questions and Clarifications 2:00 p.m. Public Comments 2:10 p.m. Final Comments 2:30 p.m. Adjourn Attachment 2