|
---|
Category:Meeting Notice
MONTHYEARPMNS20240860, Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss)2024-07-0303 July 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss) ML24113A1832024-04-30030 April 2024 5/16/2024 - Notice of Public Meeting - Annual Assessment Meeting for Millstone Power Station ML23254A0702023-09-11011 September 2023 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Planned Transition to Framatome Gaia Fuel at Millstone Power Station, Unit No. 3 ML23242A0902023-08-30030 August 2023 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Planned Transition to Framatome Gaia Fuel at Millstone Power Station, Unit No. 3 ML23061A0082023-03-0202 March 2023 Notice of Public Meeting - Annual Assessment Meeting for Millstone Power Station ML22278A0692022-10-0505 October 2022 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Planned Transition to Framatome Gaia Fuel at Millstone Power Station, Unit No. 3 ML22245A0032022-09-0202 September 2022 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Proposed License Amendment Request for Millstone Power Station, Unit No. 3 ML22236A5562022-08-24024 August 2022 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Proposed Alternative Request for Millstone Power Station, Unit No. 3 ML22208A2742022-07-27027 July 2022 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on Proposed Alternative Request for Millstone Power Station, Unit No. 3 ML22069A9472022-03-10010 March 2022 Notice of Public Meeting - Annual Assessment Meeting for Millstone Power Station PMNS20220230, NRC Annual Assessment Meeting for Millstone Power Station2022-03-0909 March 2022 NRC Annual Assessment Meeting for Millstone Power Station ML21064A0932021-03-0808 March 2021 3/18/2021 - Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station ML20099B0732020-04-0808 April 2020 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station ML19100A2902019-04-10010 April 2019 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station ML18081A2662018-03-22022 March 2018 Annual Assessment Meeting Notice - 2018 ML17249A4682017-09-0606 September 2017 Notice of Closed Licensee Meeting: Dominion Energy Nuclear Connecticut, Inc ML17068A0582017-03-0909 March 2017 3/22/2017 - Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station ML16074A0372016-03-11011 March 2016 3/29/2016 - Notice of Category 3 Public Meeting - Annual Assessment of Safety Performance at Millstone Power Station for 2015 ML15176A4552015-07-0202 July 2015 Meeting Notice - EA-13-188 Millstone Unit 2 ADR ML15086A2392015-03-27027 March 2015 4/14/2015 - Notice of Category 3 Public Meeting to Discuss Nrc'S Assessment of Safety Performance at the Millstone Power Station for 2014 ML15022A3242015-01-30030 January 2015 Notice of a Closed Meeting with Millstone Station Licensee Security Management and Staff for a Regulatory Conference to Discuss Security-Related-Information at Region-I on Feb 17, 2015 ML14070A3582014-03-11011 March 2014 3/31/2014 - Notice of Public Meeting - Millstone Annual Assessment Meeting with Neac,To Discuss NRCs Assessment of the Safety Performance at the Millstone Power Station for 2013 ML13183A3002013-07-0303 July 2013 7/17/2013 - Notice of Forthcoming Pre-Application Proprietary Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Proposed License Amendment Requests Regarding Millstone Power Station, Unit 2 Upgrade to Areva Standard CE14 Htp Fuel A ML13078A0732013-03-19019 March 2013 Notice of Public Meeting - Millstone Power Station on April 9, 2013 ML13031A1832013-02-0505 February 2013 Closed Meeting Announcement Millstone Drop-In ML12178A6132012-06-27027 June 2012 Notice of Forthcoming Pre-Application Meeting with Dominion Nuclear Connecticut, Inc. to Discuss a Proposed Millstone Power Station, Unit 2, License Amendment Request Concerning Spent Fuel Pool Criticality Re-Analysis ML12093A0962012-04-0202 April 2012 Notice of Public Meeting with Connecticut Nuclear Energy Advisory Council (Neac), to Discuss Millstone Power Station Performance During Calendar Year 2001 ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1117517272011-06-24024 June 2011 Notice of Public Meeting with Dominion Nuclear Connecticut, Inc., Millstone Power Station, Unit 2, to Discuss a Preliminary White Finding That Was Identified During a Special Inspection ML1116503572011-06-15015 June 2011 Notice of Licensee Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Preliminary White Finding Identified During Special Inspection at Millstone Unit 2, Completed in April 2011 ML1112501222011-05-0505 May 2011 Notice of Meeting with Dominion Nuclear Connecticut, Inc., Millstone, to Discuss Nrc'S Assessment of Safety Performance for Calendar Year 2010 ML1112501092011-05-0505 May 2011 Notice of Public Meeting ML1103106822011-02-0101 February 2011 Revised Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station Licensing Activities ML1101800912011-01-19019 January 2011 Notice of Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station Licensing Activities ML1035703232010-12-23023 December 2010 Meeting Notice - Millstone Power Station Units 2 and 3, on January 6, 2011 ML1031202422010-11-0808 November 2010 Notice of Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response ML1030100732010-10-28028 October 2010 Meeting Notice Milestone Power Station Revised 10 CFR 73.55 ML1019502842010-07-14014 July 2010 Notice of Forthcoming Public Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response ML1018005132010-07-0101 July 2010 Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response ML1013700502010-05-25025 May 2010 Forthcoming Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses ML1008803982010-03-29029 March 2010 Notice of Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Millstone Power Station for Calendar Year 2009 with the Nuclear Energy Advisory Council (Neac) ML1008803782010-03-29029 March 2010 Notice of Meeting with Dominion Nuclear Connecticut, Inc., to Discuss the Nuclear Regulatory Commission'S Assessment of the Safety Performance of the Millstone Power Station for Calendar Year 2009 ML1008204222010-03-26026 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos 2 and 3 Generic Letter 2004-02 Supplemental Responses ML1003314992010-03-0101 March 2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses ML1002700742010-01-27027 January 2010 Notice of Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Responses to the Millstone Power Station, Unit No. 3 Spent Fuel Pool Criticality License Amendment Request for Additional Information ML0924505352009-09-0202 September 2009 Projected Rirp Cable Issue Milestone Schedule Submitted by Nei/Industry ML0913401332009-05-15015 May 2009 Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps from the Technical Specifications for Millstone Power Station, Unit No. 2 ML0910506602009-04-15015 April 2009 Notice of Public Meeting with Nuclear Energy Advisory Council, to Discuss Nrc'S Assessment of Safety Performance of Millstone for Cy 2008 ML0909800842009-04-0808 April 2009 Notice of Public Meeting with Dominion Nuclear Connecticut, Inc. Regarding the Safety Performance of the Millstone Power Station for Calendar Year 2008 ML0809208442008-04-0101 April 2008 Notice of Public Meeting to Discuss Nrc'S Assessment of the Safety Performance of Millstone Power Station for Calendar Year 2007 with the Nuclear Energy Advisory Council (Neac) 2024-07-03
[Table view] |
Text
MN No.10-017 U.S. NUCLEAR REGULATORY COMMISSION
. REGION I NOTICE OF LICENSEE MEETING March 29, 2010 Licensee: Dominion Nuclear Connecticut, Inc.
Facility: Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 22, 2010 2:00 p.m. - 4:00 p.m.
Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385
Purpose:
To discuss the Nuclear Regulatory Commission's assessment of the safety performance of the Millstone Power Station for calendar year 2009, and the role of the agency in ensuring safe plant operations.
Attendees:
NRC: D. Jackson, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector J. Krafty. Resident Inspector Dominion: R. MacManus, Director, Nuclear Safety & Licensing D. Weekley, Managing Director, Northeast Government Affairs Public Participation*: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Dominion's performance at Millstone Power Station during calendar year 2009 and the role of the agency in ensuring safe plant operations. During the session, the public will have the opportunity to talk with the NRC staff on an informal baSis.
The NRC's Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML100621420. ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.htmL
2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Nuclear Power Plant can be found on the NRC's web site at:
www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html. .,
Meeting
Contact:
Donald E. Jackson, Chief Projects Branch 5 (610) 337-5306 E-mail: donald.jackson@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15, 2010, via telephone to the NRC meeting contact.
Approved by:
j)J r.~'"'7"--
Donald E. ckson, Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ
2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Nuclear Power Plant can be found on the NRC's web site at:
www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.
Meeting
Contact:
Donald E. Jackson, Chief Projects Branch 5 (610) 337*5306 E-mail: donald. jackson@nrc.gov
- Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15, 2010, via telephone to the NRC meeting contact.
Approved by:
IRA!
Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email)
See Attached Page DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2009 EOC\Meeting Notices\Millstone ROP 10 Annual Assessment Meeting Notice.doc SUNSI Review Complete: _-= ..IH
_ __ (Reviewer's Initials)
After declaring this document UAn Official Agency Record" it will be released to the Public.
=
To receive a copy of this document, indicate in the box: "C" Copy without attachment/enclosure "E" = COPYWlt.h attachmentIenc osure "N" = N0 copy ML100880378 PFFICE RIIDRP I RI/DRP I I NAME ..IHeinly/DRP DJacksonlDRP IOATE 03/29/10 03/29/10 OFFICIAL RECORD COpy
3 Distribution:
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OED (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation NRR (RIDSNRROD)
Director, Division of Inspection & Regional Support, NRRlDIRS (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRRlDORL (RIDSNRRDORL)
Asst. General Counsel Materials Litigation & Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, ORA (R10RAMAIL RESOURCE)
M. Dapas, ORA (R10RAMAIL RESOURCE)
D. Lew, DR? (R1DRPMAIL RESOURCE)
J. Clifford, DRP (R1DRPMAIL RESOURCE)
D. Roberts, DRS (R1DRSMAIL RESOURCE)
P. Wilson, DRS (R1 DRSMAIL RESOURCE)
L. Trocine, RI OEDO ROPreportsResource@nrc.gov RidsNRRPM Millstone Resource D. Jackson, DRP T.. Setzer, DRP J. Heinly, DRP S. Shaffer, DRP, SRI B. Haagensen, RI J. Krafty, DRP, RI C. Kowalyshyn, OA L. Trocine, RI OEDO N. Sheehan, PAO D. Serenci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham. DR?
D. Bearde, DRS' T. Havercamp, DNMS L. Larche, DRM V. Lewis, RI Receptionist
?MNS