ML060660570

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Dominion Nuclear Connecticut, Inc. NRC Presentation of Millstone Annual Assessment Results to the Nuclear Energy Advisory Council (Neac)
ML060660570
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/10/2006
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
Shared Package
ML060660562 List:
References
MN 06-008
Download: ML060660570 (5)


Text

MN No.06-008 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 10, 2006 Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station, Units 2 and 3 Docket No: 50-336 and 50-423 Date/Time: March 29, 2006, 6:00 p.m.

Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385

Purpose:

NRC Presentation of Millstone Annual Assessment Results to the Nuclear Energy Advisory Council (NEAC) as documented in a letter to Dominion Nuclear Connecticut dated March 2, 2006.

Attendees:

NRC: D. Lew, Deputy Director, Division of Reactor Projects, Region I P. Krohn, Chief, Project Branch 6, Division of Reactor Projects S. Barber, Senior Project Engineer, S. Kennedy, Senior Resident Inspector, Millstone (Acting)

J. Benjamin, Resident Inspector, Millstone NEAC: W. Sheehan, Co-Chair E. Woollacott, Co-Chair Other NEAC members Public Participation: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion Nuclear Connecticuts performance at Millstone Station and the role of the agency in ensuring safe plant operations.

NRCs assessment letter can be found in ADAMS with an accession number of ML060610628.

This meeting Notice with attached meeting agenda can be located in ADAMS with an accession number of ML060660570. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and the safety performance of Millstone Station can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 Meeting

Contact:

Paul Krohn, Chief, Projects Branch 6 (610) 337-5120 E-mail: pgk1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 27, 2006, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: /RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

3 Distribution:

D. A. Christian, Sr. Vice President and Chief Nuclear Officer J. A. Price, Site Vice President, Millstone C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations W. Meinert, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford V. Juliano, Waterford Library W. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

Agenda NRCs Annual Assessment Meeting with NEAC Waterford Town Hall March 29, 2006 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Millstone Station Performance . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

NEACs Response and Questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NEAC (20 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

ML060660570 Document Name: E:\Filenet\ML060660570.wpd SISP Review Complete: ___PGK______ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BNorris/BSN PKrohn/PGK DATE 03/10/06 03/10/06