3/22/2017 - Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station
ML17068A058
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/09/2017
From: Thomas Setzer
Reactor Projects Branch 2
To:
Setzer T
References
MN 17-003
Download: ML17068A058 (3)


Text

MN No.17-003 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 9, 2017 Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket Nos: 50-336 and 50-423 Date/Time: Wednesday, March 22, 2017 6:00 p.m. to 8:00 p.m.

Location: Waterford Public Library 49 Rope Ferry Road Waterford, CT 06385

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will meet with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss NRCs assessment of the safety performance at the Millstone Power Station for 2016, as described in the annual assessment letter dated March 1, 2017.

The NRC will respond to questions by NEAC members and then the public on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: R. Lorson, Director, Division of Reactor Safety T. Setzer, Acting Branch Chief, Projects Branch 2, Division of Reactor Projects J. Ambrosini, Senior Resident Inspector L. McKown, Resident Inspector C. Highley, Resident Inspector K. Kavanagh, Branch Chief, Quality Assurance Vendor Inspections D. Rudland, Branch Chief, Vessels and Internals Integration NEAC Attendees: K. Ryan, Chairman Quorum of NEAC Committee Membership Public Participation: This is a Category 3 Meeting. Public attendance at NEAC meetings is permitted and encouraged in accordance with their charter. The NRC staff will discuss performance at Millstone Power Station during calendar year 2016, and will answer questions and discuss issues or concerns related to Millstone Power Station during the NEAC meeting.

Meeting

Contact:

Thomas Setzer, Acting Branch Chief, Projects Branch 2 610-337-5165 E-mail: Thomas.Setzer@nrc.gov

2 The NRCs annual assessment letter regarding Millstone Power Station performance during 2016 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML17059D364. ADAMS is accessible from the NRCs website at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Millstone Power Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRCs website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by March 17, 2017, via telephone to the NRC meeting contact. Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRCs website under public meetings.

Approved by: /RA/

Thomas Setzer, Acting Branch Chief Projects Branch 2 Division of Reactor Projects cc: Distribution via ListServ

3

SUBJECT:

Millstone Power Station Public Meeting on March 22, 2017, dated March 9, 2017 Distribution: (via email)

Executive Director for Operations, OEDO RidsEDOMailCenter Deputy Executive Director for Reactor Programs, OEDO RidsEDOMailCenter Director, Office of Nuclear Reactor Regulation, NRR RidsNRROD Deputy Director, Office of Nuclear Reactor Regulation, NRR RidsNRROD Director, Div of Inspection & Regional Support, NRR/DIRS RidsNRRDIRS Director, Div of Operating Reactor Licensing, NRR/DORL RidsNRRDORL Asst General Counsel Materials Litigation and Enforcement, OGC RidsOGCMAILCENTER DDorman, RA BSmith, DRP JGreives, SLO DLew, DRA SElkhiamy, DRP JSchussler, DRP DTifft, SLO MScott, DRP JAmbrosini, DRP, SRI DScrenci, PAO DPelton, DRP CHighley, DRP, RI NSheehan, PAO RLorson, DRS LMcKown, DRP, RI RidsNrrPMMillstone Resource JYerokun, DRS ARancourt DRP, AA RidsNrrDorlLpl1-1 Resource TSetzer, DRP JBowen, RI OEDO DOCUMENT NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2017 Annual Assessment Meetings\Millstone\Meeting Notice Annual Assessment Meeting Millstone-2017.docx ADAMS Accession Number: ML17068A058 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME BSmith TSetzer DATE 03/07/17 03/08/17 OFFICIAL RECORD COPY