ML13078A073

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting - Millstone Power Station on April 9, 2013
ML13078A073
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/19/2013
From: Bellamy R
NRC/RGN-I/DRP/PB5
To:
BELLAMY, RR
References
MN 13-013
Download: ML13078A073 (3)


Text

MN No.13-013 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 19, 2013 Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket Nos: 50-336 and 50-423 Date/Time: Tuesday, April 9, 2013 7:00 p.m. to 8:00 p.m.

Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will meet with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss NRCs assessment of the safety performance at the Millstone Power Station for 2012, as described in the annual assessment letter dated March 4, 2013.

In addition, the U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at Millstone Power Station for 2012, as described in the annual assessment letter dated March 4, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: R. Bellamy, Ph.D., Chief, Division of Reactor Projects, Branch 5 J. Ambrosini, Senior Resident Inspector B. Haagensen, Resident Inspector J. Krafty, Resident Inspector NEAC Attendees: W. Sheehan, Chairman Quorum of NEAC Committee Membership Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Dominions performance at Millstone Power Station during calendar year 2012. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Millstone immediately following the meeting with NEAC.

Meeting

Contact:

Ronald R. Bellamy, Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov

2 The NRCs annual assessment letter regarding Millstone Power Station performance during 2012 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A342. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Millstone Power Station, can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 2, 2013, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Ronald R. Bellamy, Ph.D., Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ

ML13078A073 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer/ SS RBellamy/RRB DATE 03/15 /13 03/19/13