ML070670485

From kanterella
Jump to navigation Jump to search
Notice of Annual Assessment Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Millstone Nuclear Power Plant for Calendar Year 2006
ML070670485
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/08/2007
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
MN 07-007
Download: ML070670485 (5)


Text

MN No.07-007 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 8, 2007 Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station, Units 2 and 3 Docket Nos. 50-336 and 50-423 Date/Time: March 22, 2007 at 3:00 p.m.

Location: Lelan F. Sillin Training Facility Rope Ferry Road Waterford, CT 06385

Purpose:

The NRC requested an Annual Assessment Meeting with Dominion Nuclear Connecticut management to discuss NRCs assessment of the safety performance of the Millstone Nuclear Power Plant for calendar year 2006. NRCs assessment is documented in a letter dated March 2, 2007.

Attendees:

NRC: J. Clifford, Deputy Director, Division of Reactor Projects (DRP), Region I P. Krohn, Chief, Project Branch 6, DRP S. Schneider, Senior Resident Inspector, Millstone J. Benjamin, Resident Inspector, Millstone R. Fernandes, Resident Inspector, Millstone E. Huang, Reactor Inspector, DRP Licensee: A. Price, Site Vice President - Millstone A. Jordan, Plant Manager - Nuclear R. MacManus, Director - Nuclear Engineering R. Griffin, Director - Nuclear Station Safety and Licensing J. Langan, Manager - Nuclear Oversight Public Participation: This is a Category 1 Meeting. The public is invited to observe these meetings. After the business portions, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion Nuclear Connecticuts performance at Millstone and the role of the agency in ensuring safe plant operations.

NRCs assessment letter can be found in ADAMS with an accession number of ML070610464.

This meeting Notice with attached meeting agenda can be located in ADAMS with an accession number of ML070670485. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Millstone Station can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Paul Krohn, Chief, Projects Branch 6 (610) 337-5120 E-mail: pgk1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 20, 2007, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: /RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

3 Distribution:

D. A. Christian, Sr. Vice President and Chief Nuclear Officer J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Nuclear Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford R. Rubinstein, Waterford Library B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

ML070670485 Document Name: C:\FileNet\ML070670485.wpd SUNSI Review Complete: ___PGK_______ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME B Norris/PGK for P Krohn/PGK DATE 03/08/2007 03/08/2007 Agenda NRCs Annual Assessment Meeting Millstone Power Station March 22, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Millstone Station Performance . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

Dominions Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dominion (20 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)