Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station
ML20099B073
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/08/2020
From: Daniel Schroeder
Reactor Projects Branch 2
To:
Schroeder D
References
MN 20-001
Download: ML20099B073 (4)


Text

MN No.20-001 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 8, 2020 Licensee: Dominion Energy Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket Nos: 50-336 and 50-423 Date/ Time: Tuesday, April 21, 2020 4:00 p.m. to 6:00 p.m.

Location: Webinar (advance registration required)

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will host a webinar to meet with the Connecticut Nuclear Energy Advisory Council (NEAC) to discuss NRCs assessment of safety performance at the Millstone Power Station for 2019, as described in the annual assessment letter dated March 3, 2020. The NRC will respond to questions from NEAC members and then the public on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: D. Schroeder, Chief, Projects Branch 2, Division of Reactor Projects K. Kavanagh, Chief, Quality Assurance, Vendor Inspection J. Fuller, Senior Resident Inspector R. Guzman, Project Manager, Plant Licensing Branch I D. Rudland, Senior Technical Advisor J. Ortega-Luciano, Reactor Operations Engineer NEAC Attendees: NEAC Committee Membership Public Participation: This is a Category 3 Meeting. Public attendance at NEAC meetings is permitted and encouraged in accordance with its charter. The webinar will begin with a presentation by NRC staff on the NRCs assessment of performance for Millstone during 2019. During the presentation, members of NEAC will have the opportunity to ask questions. Then, following the presentation and NEAC member questions, members of the public will have the opportunity to ask questions specific to the safety performance of Millstone and the NRCs role in ensuring safe plant operations. Those wishing to submit questions can do so in writing or

2 verbally during the webinar. The NRC staff will provide guidance during the webinar on the methods available to ask a question. Alternatively, questions may be submitted in advance to Daniel.Schroeder@nrc.gov.

Interested members of the public should register at the internet address below. After registering, a confirmation email will be sent with details for joining the webinar. This is a virtual public meeting where participants will be able to see the presentation on a computer screen. Presenters will be heard via a phone call-in number. Attendees must register to obtain the phone call-in number.

In order to participate, please register for the webinar no later than one business day prior to the April 21, 2020, meeting at:

https://usnrc.webex.com/usnrc/onstage/g.php?MTID=e6c7e6cedafb2ff87c 87480db44e795fb System Requirements for Attendees for the webinar:

https://help.webex.com/en-us/nki3xrq/Webex-Meetings-Suite-System-Requirements If you have any questions or should need assistance concerning registration for the meeting, please call or email the meeting contact.

Meeting

Contact:

Mark S. Draxton, Projects Branch 2 (610) 337-5375 E-mail: Mark.Draxton@nrc.gov The NRCs annual assessment letter regarding Millstone Power Station performance during 2019 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession Number ML20059M272. ADAMS is accessible from the NRCs website at: www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Millstone can be found on the NRCs website at:

https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this webinar, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the webinar shall make their requests known to the NRC meeting contact no later than two business days prior to the April 21, 2020, meeting.

3 Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.

Approved by:

X /RA/

Signed by: Daniel L. Schroeder Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects cc: Distribution via ListServ

ML20099B073 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/ORA RI/DRP NAME JFuller MDraxton DTifft DSchroeder DATE 4/3/20 4/3/20 4/3/20 4/8/20