Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML0507302212005-01-27027 January 2005 1/27/05- Official Transcript of Proceedings-NRC, Brunswick Steam Electric Plant EIS Public Meeting: Afternoon Session. Pages 1-39 Project stage: Request ML0505502622005-02-24024 February 2005 Request for Additional Information Regarding Severe Accident Mitigation Alternatives (SAMA) for the Brunswick Steam Electric Plant, Units 1 and 2 Project stage: RAI ML0509102032005-04-0101 April 2005 Summary of Conference Call Held on January 12, 2005 Between the NRC and Carolina Power & Light Concerning Draft Requests for RAIs Pertaining to Brunswick Project stage: Draft RAI ML0512300642005-04-0606 April 2005 Draft SAMA Response Project stage: Draft Other ML0511902312005-04-29029 April 2005 4-29-2005-Summary of Teleconference Conducted on 03/31/2005, with Carolina Power & Light Company (Cp&L), to Discuss Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Electric Plant Project stage: RAI ML0513702822005-05-16016 May 2005 5-16-05 - Summary of Teleconference of Conducted on April 7, 2005, with Carolina Power & Light Company (Cp&L) to Discuss the Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Elect Project stage: RAI ML0514404792005-05-24024 May 2005 5-24-05- Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Applications by Carolina Power & Light Company, Inc (Cp&L) for Renewal of the Operating Licenses for Brunswick Steam Electric Plant, Units 1 Project stage: Approval ML0524301382005-08-30030 August 2005 Notice of Availability of the Draft Plant-Specific Supplement 25 to the Generic Environmental Impact Statement (GEIS) Project stage: Draft Other ML0533204682005-10-18018 October 2005 Preliminary Results of Environmental Review Brunswick Steam Electric Plant, Units 1 and 2, Nuclear Regulatory Commission, October 18, 2005 Project stage: Other ML0533204332005-10-18018 October 2005 Official Transcript of Proceedings, Nuclear Regulatory Commission, Brunswick Steam Electric Plant, Draft EIS: Evening Public Meeting, Southport, Nc, Tuesday, October 18, 2005. Pages 1-24 ML0533204042005-10-18018 October 2005 Official Transcript of Proceedings, Nuclear Regulatory Commission, Brunswick Steam Electric Plant, Draft EIS: Afternoon Meeting, Southport, Nc, Tuesday, October 18, 2005, Pages 1-41 ML0600902822006-01-0404 January 2006 1/4/06 - Project Manager Change for the License Renewal Environmental Review for Brunswick Steam Electric Plant, (TAC Nos MC4641 and MC4642) Project stage: Other ML0610700772006-04-14014 April 2006 4/14/06 - Final Supplement 25 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Brunswick Steam Electric Plant, Units 1 and 2 (TAC Nos. MC4641 and MC4642) Project stage: Other ML0610302242006-04-14014 April 2006 4/14/06 - Notice of Availability of the Final Supplement 25 to the Generic Environmental Impact Statement (Geis) Regarding License Renewal for Brunswick Steam Electric Plant, Units 1 and 2 (Tac Nos. MC4641 and MC4642) Project stage: Other ML0609004802006-04-30030 April 2006 NUREG-1437 Supp 25, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Brunswick Steam Electric Plant, Units 1 & 2 Final Report Project stage: Acceptance Review ML0613601312006-05-12012 May 2006 Cost-Beneficial Severe Accident Mitigation Alternatives (Samas) Identified During the License Renewal Review for the Brunswick Steam Electric Plant, Units 1 and 2 Project stage: Other 2005-05-16
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21057A1172021-04-0101 April 2021 February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time ML21036A3112021-03-0303 March 2021 Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 ML21028A6762021-02-24024 February 2021 Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML17317A3302017-12-22022 December 2017 Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17286A1222017-11-0101 November 2017 Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17137A3332017-05-17017 May 2017 Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 ML16264A3352016-10-17017 October 2016 Summary of August 18, 2016, Pre-Submittal Meeting with Duke Energy Regarding Mella+ License Amendment Request ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML16034A5242016-03-11011 March 2016 Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML14210A0502014-07-30030 July 2014 June 30, 2014, Summary of the Category 1 Public Meeting with Duke Energy Progress Inc. to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14147A2282014-06-0404 June 2014 4/17/2014 Summary of Closed Meeting with Duke Energy Progress, Inc. Regarding Areva Methods Applicability of Mella+ for Brunswick Steam Electric Plant. Units 1 and 2 ML14140A2912014-05-20020 May 2014 EA-14-048 Public Meeting Summary - Regulatory Conference and Predecision Enforcement Conference for Brunswick Steam Electric Plant ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13155A1052013-06-12012 June 2013 May 2, 2013, Summary of Meeting with Duke Energy Concerning the Relocation of the Emergency Operating Facilities ML13130A2552013-05-10010 May 2013 4/24/2013 - Meeting Summary - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant ML13016A0142013-01-17017 January 2013 1/8/2013 Summary of Meeting with Progress Energy to Discuss Planned Amendment Requests at Brunswick Steam Electric Plant, Units 1 and 2 ML12188A5182012-07-18018 July 2012 Summary of Pre-Application Conference Call with Carolina Power & Light on the Transition to NFPA 805 Requirements for Brunswick for Brunswick Steam Electric Plant, Units 1 and 2 ML12174A2562012-07-0909 July 2012 Summary of Pre-Application Meeting with Carolina Power & Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12181A0362012-06-29029 June 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML12167A0432012-06-26026 June 2012 Meeting Summary - Pre-Application Meeting with Carolina Power and Light Company on Transition to National Fire Protection Association Standard 805 Requirements for Brunswick Steam Electric Plant, Units Nos. 1 and 2 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1115109972011-05-31031 May 2011 Category 1 Public Meeting - Meeting Summary - Annual Assessment of Brunswick Steam Electric Plant ML11116A0202011-05-12012 May 2011 April 12, 2011, Summary of Pre-Application Meeting with Carolina Power & Light Company and Florida Power Corporation, on Brunswick, Units 1 & 2, Crystal River, Unit 3, and H. B. Robinson, Unit 2 ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML1015404022010-06-0303 June 2010 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML1001507472010-01-15015 January 2010 Summary of Meeting with Carolina Power and Light Company Regarding Brunswick Steam Electric Plant Human Performance Improvement Plan ML0930206502009-10-29029 October 2009 Summary of Category 1 Public Meeting with Brunswick Steam Electric Plant Regarding Issues with the Emergency Diesel Generators ML0923803922009-08-26026 August 2009 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop ML0921609632009-08-0404 August 2009 Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric Plant ML0915905862009-06-0505 June 2009 Summary of Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML0914903142009-05-29029 May 2009 Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the Company ML0830800032008-10-31031 October 2008 Summary of Public Meeting with Carolina Power and Light and Florida Power Corporation Regarding Organizational Alignment within the Company ML0720005262007-07-20020 July 2007 Summary of Meeting with Carolina Power & Light Company Regarding the Transition to Areva Fuel at Brunswick Steam Electric Plant, Units 1 and 2 (TAC Nos. MD4063 and 4064) ML0710803582007-04-18018 April 2007 Summary of Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements ML0710803992007-04-18018 April 2007 Summary of Public Meeting with Brunswick Steam Electric Plant Regarding the Trip of Emergency Diesel Generator #1 and Failure of Engine Crankshaft Bearing on 11/02/2006 2024-05-01
[Table view] Category:Note
MONTHYEARML0513702822005-05-16016 May 2005 5-16-05 - Summary of Teleconference of Conducted on April 7, 2005, with Carolina Power & Light Company (Cp&L) to Discuss the Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Elect ML0511902312005-04-29029 April 2005 4-29-2005-Summary of Teleconference Conducted on 03/31/2005, with Carolina Power & Light Company (Cp&L), to Discuss Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Electric Plant ML0509102032005-04-0101 April 2005 Summary of Conference Call Held on January 12, 2005 Between the NRC and Carolina Power & Light Concerning Draft Requests for RAIs Pertaining to Brunswick ML0507505722005-03-15015 March 2005 3/15/05 - Summary of Teleconference Conducted on February 28, 2005, with Carolina Power & Light Company (Cp&L), to Discuss the Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Ele 2005-05-16
[Table view] |
Text
April 1, 2005 LICENSEE: Carolina Power & Light, Company FACILITY: Brunswick Steam Electric Plant , Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE HELD ON JANUARY 12, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND CAROLINA POWER & LIGHT, COMPANY, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC4641 AND MC4642)
The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Carolina Power & Light, Company (CP&L) held a telephone conference call on January 12, 2005, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Brunswick Steam Electric Plant, Units 1 and 2, license renewal application. The conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the meeting participants. Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
/RA/
Sikhindra K. Mitra, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-325 and 50-324
Enclosures:
As stated cc w/encls: See next page
ML050910203 DOCUMENT NAME: E:\Filenet\ML050910203.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME SMitra MJenkins SLee DATE 04/01/05 03/31/05 04/01/05
cc:
Mr. Steven R. Carr Executive Director Associate General Counsel - Legal Public Staff - NCUC Department 4326 Mail Service Center Progress Energy Service Company, LLC Raleigh, North Carolina 27699-4326 Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. T. P. Cleary Director - Site Operations Mr. David R. Sandifer, Chairperson Brunswick Steam Electric Plant Brunswick County Board of Commissioners Progress Energy Carolinas, Inc.
Post Office Box 249 Post Office Box 10429 Bolivia, North Carolina 28422 Southport, North Carolina 28461-0429 Resident Inspector Mr. Norman R. Holden, Mayor U. S. Nuclear Regulatory Commission City of Southport 8470 River Road 201 East Moore Street Southport, North Carolina 28461 Southport, North Carolina 28461 Mr. John H. ONeill, Jr. Mr. Warren Lee Shaw, Pittman, Potts & Trowbridge Emergency Management Director 2300 N Street NW New Hanover County Department of Washington, DC 20037-1128 Emergency Management Post Office Box 1525 Ms. Beverly Hall, Section Chief Wilmington, North Carolina 28402-1525 Radiation Protection Section, Division of Natural Resources Mr. Chris L. Burton, Manager N.C. Department of Environment Performance Evaluation and and Natural Resources Regulatory Affairs PEB 7 3825 Barrett Dr. Progress Energy Raleigh, North Carolina 27609-7721 Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. David H. Hinds Plant General Manager Mr. Edward T. ONeill Brunswick Steam Electric Plant Manager - Support Services Carolina Power & Light Company Brunswick Steam Electric Plant Post Office Box 10429 Carolina Power & Light Company Southport, North Carolina 28461-0429 Post Office Box 10429 Southport, North Carolina 28461 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Robert P. Gruber
Brunswick Steam Electric Plant, Units 1 and 2 cc:
Allen K. Brittain Mr. Cornelius J. Gannon, Vice President Superintendent, Security Brunswick Steam Electric Plant Brunswick Steam Electric Plant Carolina Power & Light Company Progress Energy Carolinas, Inc. Post Office Box 10429 P.O. Box 10429 Southport, North Carolina 28461-0429 Southport, North Carolina 28461-0429 Mr. Michael Heath Brunswick Steam Electric Plant P.O. Box 10429 Southport, North Carolina 28461-0429 Talmage B. Clements Manager - License Renewal Progress Energy P. O. Box 1551 Raleigh, North Carolina 27602 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Ms. Ilene Brown NCUW William Randall Library 601 S. College Rd.
Wilmington, North Carolina 28403-5616
DISTRIBUTION: Note to Licensee: Carolina Power & Light Company, Re: Telecon Summary held on January 12, 2005, Dated: April 1, 2005 Adams Accession No.: ML050910203 HARD COPY RLEP RF E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff
B. Mozafari C. Julian, RII B. Rogers C. Lauron H. Ashar Z. Fu R. Dipert
LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE TO DISCUSS THE BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION JANUARY 12, 2005 Participants Affiliation Michael Heath Carolina Power & Light Company (CP&L)
Michael Guthrie CP&L Thomas Overton CP&L S. K. Mitra U.S. Nuclear Regulatory Commission (NRC)
Carolyn Lauron NRC Hansraj Ashar NRC Zhengguang Fu NRC Richard Morante Brookhaven National Lab (BNL)
Enclosure 1
DRAFT REQUESTS FOR ADDITIONAL INFORMATION (D-RAI)
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION January 12, 2005 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Carolina Power & Light, Company (CP&L) held a telephone conference call on January 12, 2005, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Brunswick Steam Electric Plant, Units 1 and 2, license renewal application (LRA). The following D-RAIs were discussed during the telephone conference call.
D-RAI 4.7.4-1 The torus liner and the ASME,Section XI, ISI component supports are dispositioned through 10 CFR 54.21(c)(1)(ii). In its description of the analyses, the applicant states:
The corrosion rate in the immersion zone was determined to be 0.00116 inch/year based on plant calculations and measurements. The general corrosion rate for the vapor zone is conservatively assumed to be the same as the immersion zone.
... [For ASME,Section XI, ISI Component Supports], (t)he evaluation of considered the number of sides of the component exposed to the torus environment and the time at which the component had been installed.
The staff requests the applicant to list the ASME,Section XI, ISI components, and for each component, the code inspection requirements and a description of the results from the most recent inspections.
The staff requests the applicant to provide details of the plant calculations and measurements to support the use of the 0.00116 inch/year corrosion rate.
- The additional information should include, at a minimum, the location and frequency of measurements taken, the evaluation assumptions, the basis/references for these assumptions, acceptance criteria, and how the number of sides of the component exposed to the environment and the in-service time of the component are considered in the evaluation.
- If the corrosion rate was based on the assumption of coating integrity, additional information related to the coating inspections performed and the results from these inspections should be included.
The staff requests the technical basis (e.g., industry experience, technical reports) to support the assertion that the corrosion rate for the immersion zone is a conservative assumption for the corrosion rate in the vapor zone. The staff believes that the corrosion rate could be higher in the vapor zone and the highest rate should be in the (water/vapor) transition zone.
Discussion: Based on the discussion with the applicant, the staff indicated and the applicant agreed that this question is revised as follows and will be sent as a formal RAI.
Enclosure 2
The torus liner and the ASME,Section XI, ISI component supports are dispositioned through 10 CFR 54.21(c)(1)(ii). In its description of the analyses, the applicant states:
The corrosion rate in the immersion zone was determined to be 0.00116 inch/year based on plant calculations and measurements. The general corrosion rate for the vapor zone is conservatively assumed to be the same as the immersion zone.
... [For ASME,Section XI, ISI Component Supports], (t)he evaluation considered the number of sides of the component exposed to the torus environment and the time at which the component had been installed.
The staff requests the applicant to describe the most recent significant inspection findings for the selected ASME,Section XI, ISI components, and the code inspection requirements for these components.
The staff requests the applicant to provide details of the plant calculations and measurements to support the use of the 0.00116 inch/year corrosion rate.
The additional information should include a description of the corrosion monitoring program (discussed during the January 12, 2005, teleconference call) from which the 0.00116 inches/year corrosion rate was determined. In addition, the applicant should indicate the number and frequency of coupons removed and tested.
The staff also requests that the applicant discuss the frequency and results of the wall thickness measurements in the vapor zone to support the assertion that the corrosion rate for the immersion zone is a conservative assumption for the corrosion rate in the vapor zone.
D-RAI 4.7.4-2 The non-ASME,Section XI, ISI component supports are dispositioned through 10 CFR 54.21(c)(1)(iii). In its description of the analyses, the applicant states:
The aging management activities will be predicated on the results of volumetric measurements performed on the components. Therefore, prior to the period of extended operation, the One-Time Inspection Program will be used to perform volumetric measurements to determine the actual rate of corrosion of the Vent Header Lower Column Support in the immersed and vapor space of the Torus, and platform steel and miscellaneous supports in the vapor space of the Torus.
The staff requests the applicant to describe the baseline inspection performed and the results of the inspection for each of the non-ASME,Section XI, ISI components, from which the actual rate of corrosion will be determined.
In addition to the description above, the applicant specifically states that a planned representative ultrasonic examination of the lower column support wall for the vent header will be completed prior to the period of extended operation. However, there are no similar statements of a planned UT for other non-ASME,Section XI, ISI component supports. The applicant later discusses the use of a One-Time Inspection Program to perform volumetric measurements on the lower column support for the vent header and the platform steel and
miscellaneous supports in the vapor space of the torus. The staff requests the applicant to discuss how the OTI Program is defined such that all the non-ASME,Section XI, ISI component supports are included within the scope of the OTI program, ultrasonically inspected, and the inspection results analyzed and evaluated for the period of extended operation.
The staff requests the applicant clarify the following:
Does the description and scope for the non-ASME,Section XI, ISI component supports apply to Unit 1 or Unit 2 or both? In what environments are these components - vapor zone or immersed zone or both?
Discussion: Based on the discussion with the applicant, the staff indicated and the applicant agreed that this question is revised as follows and will be sent as a formal RAI.
The non-ASME,Section XI, ISI component supports are dispositioned through 10 CFR 54.21(c)(1)(iii). In its description of the analyses, the applicant states:
The aging management activities will be predicated on the results of volumetric measurements performed on the components. Therefore, prior to the period of extended operation, the One-Time Inspection Program will be used to perform volumetric measurements to determine the actual rate of corrosion of the Vent Header Lower Column Support in the immersed and vapor space of the Torus, and platform steel and miscellaneous supports in the vapor space of the Torus.
The staff requests the applicant to describe the baseline inspection performed and the results of the inspection for each of the non-ASME,Section XI, ISI components, from which the actual rate of corrosion will be determined.
The staff requests the applicant to discuss how the One-Time Inspection (OTI) Program is defined such that all the non-ASME,Section XI, ISI component supports are included within the scope of the OTI program, ultrasonically inspected, and the inspection results analyzed and evaluated for the period of extended operation.
The staff requests the applicant clarify that the description and scope for the non-ASME,Section XI, ISI component supports applies to Unit 1 or Unit 2 or both and to list the components and the environments in which these components are found (i.e., vapor zone or immersed zone or both).