Interim Deficiency Rept Re Concrete Block Walls in Control Bldg.All Affected Walls Have Been Removed Except Main east- West Wall & Connecting Duct Chase.Completion of Rework Scheduled for 800701.Final Rept Will Then Be Issued
ML19323A856
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/30/1980
From: Koester G
KANSAS GAS & ELECTRIC CO.
To:
References
NUDOCS 8005060142
Download: ML19323A856 (1)


Text

e 8005060lL[

q -S,, as , wcmc cO-n-0 4, E P. P4 L mot e at t se cca Pas e cant-oet aano%g April 30, 1980

!

!

Mr. W.C. Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission-Region IV 611 Ryan Plaza Drive l

Suite 1000 Arlington, Texas 76011

,

!

Re: Docket No. 50-482

'

Ref: Interim Report Transmitted via GLKoester letter to WCScidle dated January 24, 1980

Dear Mr. Seidle:

The referenced construction deficiency report concerning concrete block walls in the control building at Wolf Creek was previously submitted to your of fice pursuant to 10CFR50.55(e) . A description of the deficiency, an analysis of the safety implications, and details of the initial cor-rective actions proposed or taken were included in the interim report.

This letter provides an update on the status of actions completed or now being taken in regard to tb 1 concrete block walls. All affected walls as identified in Nonconformance Report 1NN-1536-C have been removed with the exception of the main east-west wall and its connecting duct chase located on column line C-5 at elevation 1984'-0 and the main east-west wall and its connecting duct chase located adjacent to column line C-5 at elevation 2000'-0. Bechtel is presently analyzing these two walls in order to determine if their replacement is necessary. Reconstruction of,the removed concrete block walls is being controlled by a work procedure which provides for engineering inspection and documentation of acceptance.

Completion of the rework associated with this construction deficiency is currently scheduled for July 1,1980. At that time a final report will be prepared and submitted or, if further work remains, an update on the program will be made.

In the interim, please advise if you need additional inforTnation.

.

Sincerely, g,* . 5 d

,

GLK:bb cc: ' Director Inspection and Enforcement Washington, D.C. 20555' 201 N Market - Wschota, Kansas - Mail Address: P.O. Box 2081 Wnchsta. Kansas 67201 - Telephone Area Code (316) 261-6451