Interim Deficiency Rept Re Concrete Block Walls in Control Bldg.All Affected Walls Have Been Removed Except Main east- West Wall & Connecting Duct Chase.Completion of Rework Scheduled for 800701.Final Rept Will Then Be Issued
ML19323A856
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/30/1980
From: Koester G
KANSAS GAS & ELECTRIC CO.
To:
References
NUDOCS 8005060142
Download: ML19323A856 (1)


Text

e 8005060lL[

q -S,, as , wcmc cO-n-0 4, E P. P4 L mot e at t se cca Pas e cant-oet aano%g April 30, 1980 Mr. W.C. Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission-Region IV 611 Ryan Plaza Drive l

Suite 1000 Arlington, Texas 76011 Re: Docket No. 50-482 Ref: Interim Report Transmitted via GLKoester letter to WCScidle dated January 24, 1980

Dear Mr. Seidle:

The referenced construction deficiency report concerning concrete block walls in the control building at Wolf Creek was previously submitted to your of fice pursuant to 10CFR50.55(e) . A description of the deficiency, an analysis of the safety implications, and details of the initial cor-rective actions proposed or taken were included in the interim report.

This letter provides an update on the status of actions completed or now being taken in regard to tb 1 concrete block walls. All affected walls as identified in Nonconformance Report 1NN-1536-C have been removed with the exception of the main east-west wall and its connecting duct chase located on column line C-5 at elevation 1984'-0 and the main east-west wall and its connecting duct chase located adjacent to column line C-5 at elevation 2000'-0. Bechtel is presently analyzing these two walls in order to determine if their replacement is necessary. Reconstruction of,the removed concrete block walls is being controlled by a work procedure which provides for engineering inspection and documentation of acceptance.

Completion of the rework associated with this construction deficiency is currently scheduled for July 1,1980. At that time a final report will be prepared and submitted or, if further work remains, an update on the program will be made.

In the interim, please advise if you need additional inforTnation.

Sincerely, g,* . 5 d GLK:bb cc: ' Director Inspection and Enforcement Washington, D.C. 20555' 201 N Market - Wschota, Kansas - Mail Address: P.O. Box 2081 Wnchsta. Kansas 67201 - Telephone Area Code (316) 261-6451