August 2005 Monthly Operating Report for Turkey Point Units 3 and 4
ML052640224
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/13/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-197
Download: ML052640224 (3)


Text

- F L SEP 1 3 200O FPL L-2005-197 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - August 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jon Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

( 6(

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 9/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period August. 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) -- [

l -720 Maximum Dependable Capacity (MWe-Net) - 693 4.

Month 4-No. of hours reactor was critical 744 215351.7 No. of hours generator was on line (service hours) 744 5670.4 212746.2 Unit reserve shutdown hours - -- 0 D 121.8 Net Electrical Energy (MWH) . 502862 -. 3974244 139512909 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2)Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/lcense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of August. On August 6, 2005, power wvas reduced to 40% of rated power to perform scheduled turbine valve testing (TVT), materbox cleaning, and steam generator feedwater pump maintenance. The Unit returned to 100% power on August 8, 2005 and remained at essentially 100% power the remainder of the month.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 9/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period: August. 2005 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net)  ; 693 Month Year-io-aate Cumulative No. of hours reactor was critical 744 3929.3 212070.5 No. of hours generator was on line (service hours) 744 3789.22* 207430.52*

Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 520838 2517119 137117870

  • The year-to-date and cumulative generator on line hours reflect a 3.76 hour8.796296e-4 days <br />0.0211 hours <br />1.256614e-4 weeks <br />2.8918e-5 months <br /> decrease in the previously reported June generator on line hours.

UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2)Method A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of August.

Text

- F L SEP 1 3 200O FPL L-2005-197 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - August 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jon Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

( 6(

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 9/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period August. 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) -- [

l -720 Maximum Dependable Capacity (MWe-Net) - 693 4.

Month 4-No. of hours reactor was critical 744 215351.7 No. of hours generator was on line (service hours) 744 5670.4 212746.2 Unit reserve shutdown hours - -- 0 D 121.8 Net Electrical Energy (MWH) . 502862 -. 3974244 139512909 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2)Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/lcense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of August. On August 6, 2005, power wvas reduced to 40% of rated power to perform scheduled turbine valve testing (TVT), materbox cleaning, and steam generator feedwater pump maintenance. The Unit returned to 100% power on August 8, 2005 and remained at essentially 100% power the remainder of the month.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 9/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period: August. 2005 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net)  ; 693 Month Year-io-aate Cumulative No. of hours reactor was critical 744 3929.3 212070.5 No. of hours generator was on line (service hours) 744 3789.22* 207430.52*

Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 520838 2517119 137117870

  • The year-to-date and cumulative generator on line hours reflect a 3.76 hour8.796296e-4 days <br />0.0211 hours <br />1.256614e-4 weeks <br />2.8918e-5 months <br /> decrease in the previously reported June generator on line hours.

UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2)Method A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of August.