Meeting Summary with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant Unit 2 Construction Project
ML11319A231
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/15/2011
From: Haag R
NRC/RGN-II/DCP/CPB2
To: Skaggs M
Tennessee Valley Authority
Haag R
References
Download: ML11319A231 (6)


Text

UNITED STATES TVA NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 15, 2011 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT

Dear Mr. Skaggs:

This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on November 8, 2011 at 1:00 p.m. The meeting's purpose was to give Tennessee Valley Authority (TVA) the opportunity to present their updated status of the Watts Bar Unit 2 construction project to the NRC.

On November 8, 2011, the NRCs Director of Construction Projects held a Category 1 meeting in which TVA provided a presentation about the current progress and scheduling plans for the Watts Bar Nuclear (WBN) Unit 2 construction project. The NRC staff presented information on the current status of the NRCs construction inspection program for WBN Unit 2. Additional topics related to the WBN Unit 2 construction project were discussed between the NRC and TVA. Following these presentations and discussions, members of the public had an opportunity to provide comments and ask questions. The agenda (Enclosure 1), the list of attendees (Enclosure 2), the TVA presentation material used for discussions (Enclosure 3), and the NRC presentation material used for discussions (Enclosure 4) are attached to this letter.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

TVA 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact Robert Haag at 404-997-4446.

Sincerely,

/RA/

Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects

Enclosures:

1. Agenda
2. List of Attendees
3. Presentation - TVA Slides
4. Presentation - NRC Slides

ML11319A186____ O SUNSI REVIEW COMPLETE OFFICE RII:DCP RII:DCP SIGNATURE RCH CJE NAME RHaag CEven DATE 11/15/2011 11/ 14/2011 E-MAIL COPY? YES NO YES NO

TVA 3 cc w/encl: Mr. Joseph Shea Mr. Gordon P. Arent Acting Vice President, Nuclear Licensing WBN Unit 2 Licensing Tennessee Valley Authority Watts Bar Nuclear Plant LP 4B P.O. Box 2000 1101 Market Street Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 Mr. David Stinson Mr. E. J. Vigluicci Vice President Assistant General Counsel WBN Unit Two Tennessee Valley Authority WBN Nuclear Plant 6A West Tower Tennessee Valley Authority 400 West Summit Hill Drive P.O. Box 2000 Knoxville, Tennessee 37402 Spring City, Tennessee 37381 Mr. Lawrence E. Nanney, Director Ms. Donna Guinn, Manager Tennessee Department of Environmental Licensing and Industry Affairs Health & Conservation WBN Nuclear Plant Division of Radiological Health Tennessee Valley Authority 3rd Floor, L&C Annex P.O. Box 2000 401 Church Street Spring City, Tennessee 37381 Nashville, TN 37243-1532 Mr. Preston D. Swafford Mr. D. E. Grissette Chief Nuclear Officer Site Vice President and Executive Vice President WBN Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 1101 Market Place Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 County Mayor County Executive P.O. Box 156 375 Church Street Decatur, Tennessee 37322 Suite 215 Dayton, Tennessee 37321 Ms. Ann P. Harris 341 Swing Loop Mr. Gregory A. Boerschig Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. J. Neissen General Manager Quality Assurance Nuclear Generation and Development and Construction 1101 Market Street Blue Ridge 3A Chattanooga, Tennessee 37402-2801

TVA 4 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution

Letter to Michael D. Skaggs from Robert C. Haag dated November 15, 2011.

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT Distribution w/encl:

L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable)

PUBLIC NRO_cROP Resource