ML12298A428

From kanterella
Revision as of 17:35, 5 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1
ML12298A428
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/26/2012
From: Lyon C
Plant Licensing Branch IV
To: Heflin A, Markley M
Union Electric Co, Plant Licensing Branch IV
Lyon C
References
TAC ME9839, RG-1.061, Rev 1
Download: ML12298A428 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 October 26, 2012 MEMORANDUM TO: Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Carl F. Lyon, Project Manager Plant Licensing Branch IV CFJtn Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING PRE-APPLICATION MEETING WITH REPRESENTATIVES OF UNION ELECTRIC COMPANY (TAC NO. ME9839)

DATE & TIME: Thursday, November 15, 2012 9:00 a.m. to 10:00 a.m. EST LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-8B2 Rockville, Maryland PURPOSE: Union Electric Company (the licensee) will meet with the U.S. Nuclear Regulatory Commission (NRC) staff to discuss its planned submittal of an amendment request for Callaway Plant, Unit 1, to change the licensing basis to include damping values for the seismic design and analysis of the integrated head assembly that are consistent with the recommendations of NRC Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," Revision 1, instead of Revision O.

CATEGORY 1:* This is a Category 1 public meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

  • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.

M. Markley - 2 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). The licensee will be accompanied by its consultants, as noted.

NRC Union Electric Company_ ____

M. Markley C. Basavaraju S. Maglio D. Shafer, consultant M. Murphy F. Lyon T. Elwood M. Henry, Burns & McDonnell K. Scales et al. W. Muskopf A. Stalker, Areva NP F. Farzam et al.

Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below by November 14, 2012, 3:00 p.m. (Eastern Standard Time) to get the telephone number and the pass code.

MEETING CONTACTS: Fred Lyon, NRR Lauren Gibson, NRR 301-415-2296 301-415-3016 Fred.Lyon@nrc.gov Lauren. Gibson@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket No. 50-483

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA FORTHCOMING PRE-APPLICATION MEETING BETWEEN UNION ELECTRIC COMPANY AND U.S. NUCLEAR REGULATORY COMMISSION Thursday, November 15, 2012 9:00 a.m. -10:00 a.m. EST

1. Introductions
2. Licensee presentation and discussion on its planned amendment request to change the licensing basis to include damping values for the seismic design and analysis of the integrated head assembly that are consistent with the recommendations of NRC Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants,"

Revision 1, instead of Revision O. The amendment would support the planned reactor vessel head replacement during refueling outage 20, currently scheduled for the fall of 2014.

3. Questions (NRC staff)
4. Public participation
5. Closing remarks Enclosure

ML12298A428 *via email OFFICE DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM NAME FLyon JBurkhardt* MMarkley FLyon 10/25/12 10/25/12 10/25/12 10/26/12