MONTHYEARML22242A1162022-08-30030 August 2022 Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML22168A0262022-06-17017 June 2022 Preapplication Teleconference with Union Electric Company to Discuss a Spent Fuel Pool License Amendment Request for Callaway Plant, Unit No. 1 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML22045A9852022-02-14014 February 2022 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21271A6122021-09-28028 September 2021 Enclosure 1: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21265A2722021-09-22022 September 2021 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21195A3202021-07-14014 July 2021 Pre-Application Teleconference with Union Electric Company to Discuss a License Amendment Request to Revise the Emergency Plan for the Callaway Plant, Unit No. 1 ML21190A2812021-07-0909 July 2021 Notice of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission'S 2020 Annual Assessment of Callaway Plant PMNS20210942, Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commissions 2020 Annual Assessment of Callaway Plant2021-07-0909 July 2021 Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commissions 2020 Annual Assessment of Callaway Plant ML21130A6842021-05-10010 May 2021 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21125A4262021-05-0505 May 2021 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21123A2602021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21123A2622021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21074A2752021-03-15015 March 2021 Pre-Application Teleconference with Union Electric Company Regarding Callaway Plant Unit No. 1 to Discuss an Alternative Source Term License Amendment Request ML21063A5132021-03-0404 March 2021 Pre-Application Teleconference with Union Electric Company Regarding Callaway Plant Unit No. 1 to Discuss an Alternative Source Term License Amendment Request ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML14080A5442014-03-31031 March 2014 February 20, 2014, Summary of Meeting Held Between U.S. Nuclear Regulatory Commission Staff and Union Electric Company Representatives to Discuss the Callaway Plant, Unit 1, License Renewal Application ML14066A4972014-03-0707 March 2014 03/19/2014 Notice of Forthcoming Category 3 Public Meeting to Discuss the Draft Supplement 51 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) for Callaway, Unit 1, Issued in February 2014 ML14035A3032014-02-0404 February 2014 02/20/2014 Notice of Forthcoming Category 1 Meeting with Union Electric Co. (Ameren Missouri) and Westinghouse to Discuss License Renewal for the Callaway Plant Unit 1 ML14029A6372014-01-29029 January 2014 02/19/2014 Notice of Forthcoming Category Public Meeting with Union Electric Co. (Ameren Missouri) to Discuss Unresolved Technical Issues Associated with Materials Reliability Program (MRP)-227-A Re Callaway, Unit 1 Re License Renewal ML12298A4282012-10-26026 October 2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1 ML12227A3472012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 ML12227A3492012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1 ML12041A4792012-02-24024 February 2012 03/14/2012-Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Callaway Plant, Unit 1 ML1136304032011-12-29029 December 2011 Correction Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 ML1200300872011-12-29029 December 2011 Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Blocking P-4/Low Tavg Feedwater Isolation Signal at Callaway Plant, Unit 1 ML1113202252011-05-12012 May 2011 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1's Amendment Request to Adopt Risk-informed, Performance-Based Alternative Described in National Fire Protection Association Standard (NFPA) 805 ML1101204702011-01-12012 January 2011 Notice of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1030202792010-11-0505 November 2010 Notice of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Related to Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1007100312010-03-12012 March 2010 Notice of Forthcoming Conference Call with Union Electric Company to Discuss Proposed Application for Relocation of Surveillance Frequencies from Callaway Plant Technical Specifications (Risk-Managed TS Initiative 5b) ML0929300152009-10-20020 October 2009 Revised Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 ML0928003162009-10-16016 October 2009 Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/0209 and 8/27/2009, Respectively ML0927302752009-10-15015 October 2009 Summary of Meeting with Union Electric Company to Discuss Proposed Risk-Informed Technical Specification License Amendment for Callaway Plant, Unit 1, and Future Adoption of Initiative 4b ML0924605592009-09-0404 September 2009 Notice of Meeting with Union Electric Company to Discuss a Proposed Risk Informed Change to Callaway, Unit 1, Technical Specifications ML0920306202009-07-31031 July 2009 Notice of Forthcoming Conference Call with Union Electric Company and Wolf Creek Nuclear Operating Company Re Draft Requests for Additional Information on Generic Letter 2004-02 for Callaway Plant and Wolf Creek Creek Generating Station ML0910502042009-04-14014 April 2009 Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway ML0817506442008-06-24024 June 2008 Forthcoming Meeting with Union Electric Company on the Callaway Plant to Discuss the Licensee'S Responses to NRC Request for Additional Information Relief and License Amendment Requests ML0616700832006-06-26026 June 2006 6/14/06 Public Meeting Summary on the Reactor Oversight Process ML0631703152006-01-23023 January 2006 Proposed Agenda Callaway MSIV Operability Issues, January 23, 2006 ML0512206202005-05-0404 May 2005 Forthcoming Meeting with Union Electric Co. to Discuss Revision of TSTF-449 and Response to Questions on Replacement of Steam Generators to Be Installed in Fall 2005 ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0418403962004-07-0202 July 2004 Forthcoming Meeting with Licensees to Discuss Operator Licensing Program Policies and Recent Revisions ML0409706172004-04-0707 April 2004 Closed Meeting with Union Electric Co & Wolf Creek Nuclear Operating Corp Regarding Proprietary Information. (TACs MC2286, MC2287) ML0406901152004-03-0909 March 2004 Notice of Meeting with Union Electric Company on Callaway, Unit 1 (Tac. Mc 1756) to Explain Its Application Dated 12/17/2003 to Revise TSs 3.3.1 ML0329605212003-10-28028 October 2003 Notice of Meeting with Union Electric Company on Callaway Plant ML0328702962003-10-15015 October 2003 Stars, Notice of Forthcoming Meeting to Discuss Topics Listed in Agenda ML0316806212003-07-17017 July 2003 Licensee'S Handouts, Slides and Viewgraphs, 53 Pages, S107210 ML0307900102003-03-20020 March 2003 Forthcoming Meeting with Union Electric Company on Program to Replace the Steam Generators at Callaway 2022-08-30
[Table view] Category:Meeting Notice
MONTHYEARML22242A1162022-08-30030 August 2022 Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML22168A0262022-06-17017 June 2022 Preapplication Teleconference with Union Electric Company to Discuss a Spent Fuel Pool License Amendment Request for Callaway Plant, Unit No. 1 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants ML22045A9852022-02-14014 February 2022 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21265A2722021-09-22022 September 2021 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21211A6022021-07-28028 July 2021 Annual Assessment Meeting ML21195A3202021-07-14014 July 2021 Pre-Application Teleconference with Union Electric Company to Discuss a License Amendment Request to Revise the Emergency Plan for the Callaway Plant, Unit No. 1 ML21190A2812021-07-0909 July 2021 Notice of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission'S 2020 Annual Assessment of Callaway Plant PMNS20210942, Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commissions 2020 Annual Assessment of Callaway Plant2021-07-0909 July 2021 Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commissions 2020 Annual Assessment of Callaway Plant ML21130A6842021-05-10010 May 2021 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21125A4262021-05-0505 May 2021 Partially Closed Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for the Callaway Plant, Unit No. 1 ML21074A2752021-03-15015 March 2021 Pre-Application Teleconference with Union Electric Company Regarding Callaway Plant Unit No. 1 to Discuss an Alternative Source Term License Amendment Request ML21063A5132021-03-0404 March 2021 Pre-Application Teleconference with Union Electric Company Regarding Callaway Plant Unit No. 1 to Discuss an Alternative Source Term License Amendment Request ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML20353A3592020-03-26026 March 2020 Enclosure 3 - 2020 Proxy Statement of Ameren Corporation ML14066A4972014-03-0707 March 2014 03/19/2014 Notice of Forthcoming Category 3 Public Meeting to Discuss the Draft Supplement 51 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) for Callaway, Unit 1, Issued in February 2014 ML14035A3032014-02-0404 February 2014 02/20/2014 Notice of Forthcoming Category 1 Meeting with Union Electric Co. (Ameren Missouri) and Westinghouse to Discuss License Renewal for the Callaway Plant Unit 1 ML14029A6372014-01-29029 January 2014 02/19/2014 Notice of Forthcoming Category Public Meeting with Union Electric Co. (Ameren Missouri) to Discuss Unresolved Technical Issues Associated with Materials Reliability Program (MRP)-227-A Re Callaway, Unit 1 Re License Renewal ML13059A8002013-03-11011 March 2013 Summary of Telephone Call Held on 11/5/12, Between NRC and Union Electric Company, Regarding Request for Clarification of Responses to the SAMA RAI Concerning Callaway Plant, Unit 1, LRA ML12363A4612012-12-28028 December 2012 01/17/2013 Meeting Notice with NRC to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection Conducted in September 2012, with Interested Members of the Public ML12298A4282012-10-26026 October 2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1 ML12227A3472012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 ML12227A3492012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1 ML12041A4792012-02-24024 February 2012 03/14/2012-Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Callaway Plant, Unit 1 ML1200300872011-12-29029 December 2011 Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Blocking P-4/Low Tavg Feedwater Isolation Signal at Callaway Plant, Unit 1 ML1136304032011-12-29029 December 2011 Correction Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 ML1136300262011-12-29029 December 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Blocking P-4/LO Tavg Feedwater Isolation Signal at Callaway Plant Unit 1 ML11192A2362011-07-12012 July 2011 Notice of Closed Meeting with Callaway to Discuss Lessons Learned from the Recent Triennial Force-On-Force Exercise at the Callaway Nuclear Power Plant ML1113202252011-05-12012 May 2011 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1's Amendment Request to Adopt Risk-informed, Performance-Based Alternative Described in National Fire Protection Association Standard (NFPA) 805 ML1109501212011-04-0505 April 2011 Notice of Meeting to Discuss NRC Reactor Oversight Process Annual Assessment of Callaway Plant ML1101204702011-01-12012 January 2011 Notice of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1030202792010-11-0505 November 2010 Notice of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Related to Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1011003572010-04-19019 April 2010 Annual Assessment Public Meeting with Amerenue ML1007100312010-03-12012 March 2010 Notice of Forthcoming Conference Call with Union Electric Company to Discuss Proposed Application for Relocation of Surveillance Frequencies from Callaway Plant Technical Specifications (Risk-Managed TS Initiative 5b) ML0929300152009-10-20020 October 2009 Revised Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 ML0929403662009-10-20020 October 2009 Notice of Category 1 Meeting to Discuss the Significance, Cause, and Corrective Action Associated with an Apparent Violation Involving the Inoperability of the Turbine Driven Auxiliary Feedwater Pump ML0928003162009-10-16016 October 2009 Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/0209 and 8/27/2009, Respectively ML0924605592009-09-0404 September 2009 Notice of Meeting with Union Electric Company to Discuss a Proposed Risk Informed Change to Callaway, Unit 1, Technical Specifications ML0920306202009-07-31031 July 2009 Notice of Forthcoming Conference Call with Union Electric Company and Wolf Creek Nuclear Operating Company Re Draft Requests for Additional Information on Generic Letter 2004-02 for Callaway Plant and Wolf Creek Creek Generating Station ML0912402762009-05-0404 May 2009 Notice of Annual Assessment Public Meeting with Amerenue to Present and Discuss Performance Results of the Callaway Plant for the Period of January 1 Through December 31, 2008 ML0906401852009-03-0505 March 2009 Notice of Meeting with Amerenue to Discuss Various Engineering Related Topics at Callaway Plant ML0834503272008-12-19019 December 2008 Summary of Meeting with Representatives of Union Electric Company, Licensee for Callaway Plant, Unit 1 Second Round of Requests for Information, Extension of Completion Time for Essential Service Water Systems (TAC Nos. MD6792 & MD7252) ML0817506442008-06-24024 June 2008 Forthcoming Meeting with Union Electric Company on the Callaway Plant to Discuss the Licensee'S Responses to NRC Request for Additional Information Relief and License Amendment Requests ML0814001252008-05-0909 May 2008 Notice of Meeting with Callaway Plant to Discuss the Results of Inspections and Performance Indicators ML0812305882008-05-0202 May 2008 End-of-cycle Public Meeting with Amerenue to Present and Discuss Performance Results of the Callaway Plant for the Period of January 1 Though December 31, 2007 ML0800400232008-01-0808 January 2008 Forthcoming Meeting with Union Electric Company on the Callaway Plant Relief and Amendment Requests Dated August 3 and October 31, 2007. (Tac No. MD6792 and MD7252) ML0726404022007-09-21021 September 2007 Notice of Meeting with Union Electric Company to Discuss Various Topics Related to Callaway ML0713300022007-05-0404 May 2007 Notice of Meeting to Discuss Results of Annual Assessment Associated with the 2006 Inspections and Performance Indicators for Callaway Plant ML0712100702007-04-30030 April 2007 Notice of Meeting with Union Electric Company/Ameren Ue to Describe the Reactor Oversight Process, Discuss Licensee Performance at the Callaway Plant During Calendar Year 2006, and Discuss Topics of Potential Interest to the Public ML0617202222006-04-0707 April 2006 Individual Invitation Letter to Public Annual Performance Assessment Meeting Regarding Callaway Plant 2022-08-30
[Table view] |
Text
October 28, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management FROM: Jack N. Donohew, Senior Project Manager, Section 2 /RA/
Project Directorate IV Division of Licensing Project Management
SUBJECT:
FORTHCOMING MEETING WITH UNION ELECTRIC COMPANY ON THE CALLAWAY PLANT (TAC NOS. MB9875, MB9876, AND MB9879)
DATE & TIME: Wednesday, November 12, 2003 8:30 a.m. - 5:00 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North, Room O-7B4 11555 Rockville Pike Rockville, Maryland 20852 CATEGORY*: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned (see attached agenda).
Portions of this meeting may be closed to the public if the licensee presents information that the staff has determined is proprietary in nature.
PURPOSE: To discuss (1) licensee's responses to requests for additional information on two licensees applications dated June 26, 2003, (ADAMS Accession Nos. ML031920631 and ML031950570) for amendments to the technical specifications, and (2) potential instrumentation digital upgrades.
PARTICIPANTS:* NRC participants are from the Office of Nuclear Reactor Regulation (NRR).
NRC UNION ELECTRIC FRAMATOME R. Eckenrode T. Herrmann P. Mangono R. Lobel D. Wingbermuehle R. Pedersen D. Shafer, et al. WOLF CREEK NUCLEAR M. Hartzman OPERATING CORPORATION J. Donohew, et al. S. Wideman Docket No. 50-483
Attachment:
Agenda (Adams Accession No. ML032960521) cc w/att: See next page MEETING CONTACT: Jack Donohew, (301) 415-1307 jnd@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002.
October 28, 2003 DISTRIBUTION FOR MEETING NOTICE WITH UNION ELECTRIC COMPANY ON NOVEMBER 12, 2003 Hard Copy PUBLIC PD IV Reading File JDonohew Receptionist (OWFN and TWFN)
E-mail RidsNrrAdpt(BSheron)
RidsNrrDlpm(TMarsh/ELeeds)
RidsNrrDlpmLpdiv(HBerkow)
RidsNrrPMJDonohew RidsNrrLAEPeyton SDembek REckenrod CLiang RLobel JGolla SLaVie RPedersen MHartzman PPatnaik EMarinos MChiramal RidsOGCMailCenter RidsACRS/ACNWMailCenter RidsRgnIVMailCenter (DGraves)
JClark, EDO TMensha PMNS
October 28, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management FROM: Jack N. Donohew, Senior Project Manager, Section 2 /RA/
Project Directorate IV Division of Licensing Project Management
SUBJECT:
FORTHCOMING MEETING WITH UNION ELECTRIC COMPANY ON THE CALLAWAY PLANT (TAC NOS. MB9875, MB9876, AND MB9879)
DATE & TIME: Wednesday, November 12, 2003 8:30 a.m. - 5:00 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North, Room O-7B4 11555 Rockville Pike Rockville, Maryland 20852 CATEGORY*: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned (see attached agenda).
Portions of this meeting may be closed to the public if the licensee presents information that the staff has determined is proprietary in nature.
PURPOSE: To discuss (1) licensee's responses to requests for additional information on two licensees applications dated June 26, 2003, (ADAMS Accession Nos. ML031920631 and ML031950570) for amendments to the technical specifications, and (2) potential instrumentation digital upgrades.
PARTICIPANTS:* NRC participants are from the Office of Nuclear Reactor Regulation (NRR).
NRC UNION ELECTRIC FRAMATOME R. Eckenrode T. Herrmann P. Mangono R. Lobel D. Wingbermuehle R. Pedersen D. Shafer, et al. WOLF CREEK NUCLEAR M. Hartzman OPERATING CORPORATION J. Donohew, et al. S. Wideman Docket No. 50-483
Attachment:
Agenda (Adams Accession No. ML032960521) cc w/att: See next page MEETING CONTACT: Jack Donohew, (301) 415-1307 jnd@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002.
DISTRIBUTION: See next page ADAMS ACCESSION NO.: ML032960521 NRC-001 OFC PM:PD4-2 LA:PD4-2 SC:PD4-2 NAME JDonohew: EPeyton SDembek DATE 10/27/03 10/27/03 10/27/03 Document Name: C:\ORPCheckout\FileNET\ML032960521.wpd OFFICIAL RECORD COPY
AGENDA NRC/UNION ELECTRIC COMPANY MEETING CALLAWAY PLANT, UNIT 1 NOVEMBER 12, 2003
Introduction
MFW/AFW Mods and SGTR Accident Re-Analysis Application (ADAMS ML031950570) - Information Needed by Staff
Shield Wall Penetration and LBB Methodology Application (ADAMS ML031920631) - Information Needed by Staff PUBLIC COMMENT
Potential Instrumentation Digital Upgrades for Callaway Plant PUBLIC COMMENT
Adjourn Meeting Acronyms: AFW = auxiliary feedwater LBB = leak before break MFW = main feedwater Mods = modifications SGTR = steam generator tube rupture
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc. Mr. Rick A. Muench 19041 Raines Drive President and Chief Executive Officer Derwood, MD 20855 Wolf Creek Nuclear Operating Corporation P.O. Box 411 John ONeill, Esq. Burlington, KA 66839 Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W. Mr. Dan I. Bolef, President Washington, D.C. 20037 Kay Drey, Representative Board of Directors Coalition for the Mr. Mark A. Reidmeyer, Regional Environment Regulatory Affairs Supervisor 6267 Delmar Boulevard Regulatory Affairs University City, MO 63130 AmerenUE P.O. Box 620 Mr. Lee Fritz, Presiding Commissioner Fulton, MO 65251 Callaway County Court House 10 East Fifth Street U.S. Nuclear Regulatory Commission Fulton, MO 65151 Resident Inspector Office 8201 NRC Road Mr. David E. Shafer Steedman, MO 65077-1302 Superintendent, Licensing Regulatory Affairs Mr. Chris Younie AmerenUE Manager, Quality Assurance P.O. Box 66149, MC 470 AmerenUE St. Louis, MO 63166-6149 P.O. Box 620 Fulton, MO 65251 Mr. Keith D. Young Manager, Regulatory Affairs Manager - Electric Department AmerenUE Missouri Public Service Commission P.O. Box 620 301 W. High Fulton, MO 65251 P.O. Box 360 Jefferson City, MO 65102 Mr. Scott Clardy, Director Section for Environmental Public Health Regional Administrator, Region IV P.O. Box 570 U.S. Nuclear Regulatory Commission Jefferson City, MO 65102-0570 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Garry L. Randolph Vice President and Mr. Ronald A. Kucera Chief Nuclear Officer Deputy Director for Public Policy Union Electric Company Department of Natural Resources Post Office Box 620 P.O. Box 176 Fulton, MO 65251 Jefferson City, Missouri 65102