Stacey L~ Munroe: AgendaCallaway MSiV Operability.wpd Pagei~
3tacev L. Munroe - AgenclaCallaway MSIV Operabilitv.wpo Proposed Agenda Callaway MSIV Operability Issues January 23, 2006 (O-12B6 12:30 to 04:30)
- 1. Overview of the MSIV concerns (Jones)
- 2. Overview of Callaway MSIV operation and current licensing bases (Peck)
- 3. Overview of Callaway MSL Break Ancient analysis (Peck)
- 4. Chronology of events (Peck)
- 5. Region IV Operability Determination - Use of GL 91-18 and RIS 2005-20 (Peck)
- 6. Agency treatment of future non-compliance (Jones)
- 7. Generic Implications (Jones)
Attendees:
.Tom Boyce, TS Branch Chief Theodore Tjader, TS Branch David Terao, NRR Branch Chief Michael Peck, Callaway SRI William Jones, Region IV Branch Chief Jack Donohew, Callaway NRR PM Information in this record was deleted in accordance with the Freedom of Information Act, exemptions FOIA._.-,
- z.
(
0/A
- taceyL.Munroe-wp taey.u e AgendaCaaway MSV Operability.wpd I-age 2:1.
Chronology of Callaway MSIV Operability Issues January 23, 2006 February 2005 The licensee completed a new MSL Break accident Analysis Case (Case 1.7). Case 17 considered the plant configuration with one MSIV actuator removed from service. The current licensee bases (CLB), including Technical Specifications (TS), and the accident analysis assumed 141 million BTUs/hr containment cooler duty. Case 17 assumed 155 million BTUs/hr cooler duty. The 155 million BTUs/hr duty was based on additional margin provided by clean, unblocked heat exchanger coils. The new Case 17 concluded the resulting peak containment temperature and pressure was bonded by CLB Cases 6 and 12 (the limiting Cases).
March 2005 Licensee prepared a 50.59 safety evaluation to add the new MSL Break accident Analysis Case (Case 17) to the CLB. The licensee concluded that prior NRC approval was required..
I The licensee submitted a license amendment request to est, 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out of service time for an inoperable MSIV actuator.
a