ML19309B675

From kanterella
Revision as of 00:46, 29 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Required Visual Insp Completed on Unit 1 in Feb 1980.No Corrective Actions Necessary
ML19309B675
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/07/1980
From: Gilberts D
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-17, NUDOCS 8004070058
Download: ML19309B675 (1)


Text

,-

o is Q '

NSF NORTHERN STATES POWER COMPANY M IN N E A PO Ll S. M lN N E SOTA 5 5401 March 7, 1980 Mr. James G. Keppler, Director Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

'

Dear Mr. Keppler:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dockets No. 50-282 and 50-306 In response to Item 6 of IE Bulletin 79-17, Revision 1, the visual in-Spection required by Item 2(a) of the Bulletin was satisfactorily com-pleted on Unit 1 in February 1980; no corrective actions were necessary.

Yours truly, o

b

  • D. E. Gilberts Vice President Power Production cc: Mr. G. Charnoff hTC Office of Inspection and Enforcement Washington, D. C.

DEG:nk MAR 141980

.

800407oggpf p