ML081420753

From kanterella
Revision as of 16:25, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
05/13/2008 Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2008 Davis-Besse End-of-Cycle Performance Assessment
ML081420753
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/20/2008
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To:
NRC/RGN-III
References
Download: ML081420753 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 20, 2008 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293).

The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Davis-Besse performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided its perspective on the NRCs assessment. The licensees meeting presentation handout can be found in ADAMS at ML081410440.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As stated DISTRIBUTION:

See next page

Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008

SUBJECT:

SUMMARY

OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl: B. Allen, Site Vice President The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, Chief, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay G. Mortensen, INPO

LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293).

The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Davis-Besse performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided its perspective on the NRCs assessment. The licensees meeting presentation handout can be found in ADAMS at ML081410440.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As stated DISTRIBUTION:

See next page DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC Cy 2007\EOC Meeting Notices -

Letters/Davis-Besse EOC meeting Summary Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME GWright:dtp JCameron

  • JLC for DATE 05/20/08 05/20/08 OFFICIAL RECORD COPY

Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008

SUBJECT:

SUMMARY

OF THE May 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

TEB RAG1 TJW2 RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 TXN

PUBLIC MEETING PRINCIPAL ATTENDEES May 13, 2008 FirstEnergy B. Allen, Site Vice President, Davis-Besse V. Kaminskas, Director, Site Operations, Davis-Besse D. Moul, Director, Site Engineering, Davis-Besse B. Boles, Director, Site Maintenance C. Price, Director, Site Performance Improvement Nuclear Regulatory Commission J. Cameron, Branch Chief J. Rutkowski, Senior Resident Inspector A. Wilson, Resident Inspector P. Chandrothl, Public Affairs Officer N. Keller, Resident Office Assistant Other Attendees J. Gannon, Office of U.S. Senator Sherrod Brown (OH)

C. Koebel, Ottawa County (Ohio) Commissioner S. Arndt, Ottawa County (Ohio) Commissioner J. Sass, President, Ottawa County (Ohio) Commissioners J. Witt, Ottawa County (Ohio) Administrator M. White, Ohio Emergency Management Agency Enclosure