Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] Category:Acceptance Review Letter
MONTHYEARML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21188A2112021-07-0707 July 2021 Acceptance of Submittal Post-Shutdown Decommissioning Activities Report ML20211L7952020-07-29029 July 2020 Acceptance Review Determination (E-mail Dated 7/29/20) License Amendment Request to Revise Provisional Operating License and TS to Reflect IPEC Permanently Defueled Condition ML20188A3832020-07-0606 July 2020 Updated Completion Date for IP2 Rescission Request from Interim Compensatory Measure 8.1, Order EA-02-026 ML20149K6992020-05-28028 May 2020 Acceptance Review Determination (E-mail Dated 5/28/20) License Amendment Request for Permanently Defueled Technical Specifications ML20108E9482020-04-17017 April 2020 Acceptance Review Determination for Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device ML20079M2492020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/20) Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML20021A3802020-01-21021 January 2020 Updated E-mail 1/21/2020; Acceptance Review Determination: Proposed License Amendment City Water and Condensate Storage Tank Technical Specifications ML20002A0102019-12-30030 December 2019 Acceptance Review Determination: Proposed License Amendment City Water and Condensate Storage Tank Technical Specifications ML19295E3132019-10-22022 October 2019 Acceptance Review Determination: (E-mail 10/22/19) Relief Request IP3-IST-RR-001 for Extension of 4th 10-year IST Interval ML19267A3822019-09-24024 September 2019 Acceptance Review Determination: Rescission Request from Interim Compensatory Measure 8.1, Order EA-02-026 (Epids: L-2019-LLL-0025 and L-2019-LLL-0029) ML19141A1032019-05-20020 May 2019 Acceptance Review Determination: LAR to Revise Emergency Plan for Permanently Shut Down and Defueled Condition(05/20/2019 E-mail) EPID: L-2019-LLA-0080 ML19141A1052019-05-20020 May 2019 Acceptance Review Determination: Administrative Controls for Permanently Defueled Condition(05/20/2019 E-mail) EPID: L-2019-LLA-0081 ML19141A1072019-05-20020 May 2019 Acceptance Review Determination: Certified Fuel Handler Training Program(05/20/2019 E-mail) EPID: L-2019-LLL-0015 ML19141A1092019-05-20020 May 2019 Acceptance Review Determination: Exemption Request from Certain Provisions of 10 CFR 73.55 (05/20/2019 E-mail) EPID: L-2019-LLE-0010 ML19141A1152019-05-20020 May 2019 Acceptance Review Determination - LAR Permanently Defueled Technical Specifications (05/20/2019 E-mail) EPID: L-2019-LLA-0079 ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18219A9212018-08-0707 August 2018 Acceptance Review Determination: Relief Request IP3-ISI-RR-14, Proposed Alternative to ASME Code Case N-729-4 ML18212A3482018-07-31031 July 2018 Acceptance Review Determination - LAR LAR - Deletion of License Conditions Related to Decommissioning Trust Provisions (07/31/2018 E-mail) EPID: L-2018-LLA-0180 ML18024B0232018-01-24024 January 2018 E-mail Acceptance Review Determination, Proposed License Amendment, Spent Fuel Criticality and Storage Technical Specifications ML18022A2562018-01-22022 January 2018 E-mail Acceptance Review Determination, LAR for One-Time Extension Containment Type a ILRT ML18019A0522018-01-19019 January 2018 E-mail Acceptance Review Determination, Relief Request IP2-ISI-RR-05 Alternative Examination Volume Code Case N-729-4 ML17321A5542017-11-17017 November 2017 Acceptance Review E-mail Dated November 17, 2017: Relief Requests Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections and 10-year ISI Extension; (EPID: L-2017-LLR-0124, 0127, 0128) ML17142A4122017-05-22022 May 2017 Acceptance Review for Indian Point Units 1, 2 & 3 - License Amendment Request Cyber Security Plan Milestone 8 Implementation Schedule ML17123A1932017-05-0303 May 2017 Acceptance Review for Indian Point 2 Amendment to Connect Non-Seismic Piping to the RWST Seismic Piping (CAC No. MF9578) - 2017/05/03 E-mail from R.Guzman to M.Mirzai ML17115A0482017-04-26026 April 2017 Acceptance of Requested Licensing Action Amendment of Inter-Unit Transfer of Spent Fuel ML15037A5252015-02-13013 February 2015 Acceptance Review for Spent Fuel Pool Criticality Analysis ML1226503642012-09-21021 September 2012 Acceptance Review for Indian Point 3 TAC ME9263 ML1226206062012-09-18018 September 2012 Acceptance Review for Indian Point 3 Diesel Fuel Oil System Amendment ML12241A3022012-09-0505 September 2012 Acceptance Review for Amendment Regarding Atmospheric Dump Valves - Indian Point Nuclear Generating Unit No. 3 - ML1221604302012-08-0303 August 2012 Acceptance Review to Revise Appendix H Rv Capsule Surveillance Schedule ML1220212602012-07-20020 July 2012 Acceptance Review for Indian Point Cyber Security Amendment ML1218506972012-07-0202 July 2012 NRC Acceptance Review of Indian Point 3 Adv License Amendment ML12143A4892012-05-25025 May 2012 Acceptance Review for Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Cooling System Is Out of Service - Indian Point Nuclear Generating Unit No. 3 ML1210802052012-04-18018 April 2012 Acceptance Review for Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Pool Cooling System Is Out of Service - Indian Point Nuclear Generating, Unit No. 3 ML1205800432012-02-27027 February 2012 Relief Request RR-05, ME7940, Acceptance Review ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML0931703722009-11-13013 November 2009 Acceptance Review of Entergy'S Request to Extend Orders (TAC ME1515 - ME2522) ML0914704832009-05-27027 May 2009 Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) 2023-04-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Apri11B,2012 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
ACCEPTANCE REVIEW FOR PROPOSED LICENSE AMENDMENT TO ALLOW USE OF THE BACKUP SPENT FUEL POOL COOLING SYSTEM WHILE THE SPENT FUEL POOL COOLING SYSTEM IS OUT OF SERVICE INDIAN POINT NUCLEAR GENERATING UNIT NO.3 (TAC NO. MEB09?)
Dear Sir or Madam:
By letter dated February 6,2012, Entergy Nuclear Operations, Inc., the licensee, submitted a license amendment for Indian Point Nuclear Generating Unit NO.3. The proposed amendment would revise the Updated Final Safety Analysis Report (UFSAR) to allow use of the backup spent fuel pool cooling system (BSFPCS) when the spent fuel pool cooling system (SFPCS) is out of service.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that the information delineated in the enclosure to this letter is necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
In order to make the application complete, the NRC staff requests that the licensee supplement the application to address the information requested in the enclosure by May 3,2012. This will enable the NRC staff to complete its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will
-2 be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
The information requested and associated time frame in this letter were discussed with your staff on April 16, 2012.
If you have any questions, please contact me at 301-415-1364 or Douglas.Pickett@nrc.gov.
Sincerely,
~ -V g~~~
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
As stated cc w/encl: Distribution via Listserv
LlC-109 ACCEPTANCE REVIEW PROPOSED LICENSE AMENDMENT TO ALLOW USE OF THE BACKUP SPENT FUEL POOL COOLING SYSTEM WHEN THE SPENT FUEL COOLING SYSTEM IS OUT OF SERVICE INDIAN POINT NUCLEAR GENERATING UNIT NO.3 OFFICE OF NUCLEAR REACTOR REGULATION A. The application does not specifically address the findings of the 2001 Special Inspection of the BSFPCS and their resolution. This includes:
- 1. Reliability of the BSFPCS versus reliability of the SFPCS.
- 2. Use of the SFP High Temperature Alarm during periods of elevated SFP temperature.
- 3. Risk management actions to be put in place during use of the BSFPCS with SFPCS out of service.
B. In order to preserve existing margin, the heat removal capacity of the BSFPCS should not be considered when calculating the delay time prior to spent fuel offload from the reactor. The application does not clarify whether the BSFPCS heat removal capacity will be credited together with the SFPCS heat removal capacity when calculating this delay time. (As described in UFSAR Section 9.3.3).
Enclosure
- 2 be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
The information requested and associated time frame in this letter were discussed with your staff on April 16, 2012.
If you have any questions, please contact me at 301-415-1364 or Douglas.Pickett@nrc.gov.
Sincerely, Iral Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
As stated cc w/encl: Distribution via Listserv Distribution:
PUBLIC LPL1-1 r/f RidsNrrDorl RidsNrrDorlLpl1-1 RidsNrrDorlDpr RidsNrrPMlndianPoint RidsNrrLASLittle RidsRgn1 MailCenter RidsNrrDssSbpb RidsOGCRp RidsAcrsAcnw_ MailCTR MGray, Rgn1 ADAMS ACCESSION NO.: ML121080205 OFFICE LPL 1-1/PM LPL 1-1/LA SBPB/BC LPL 1-1/BC NAME DPickett SLittie by GCasto GWilson email dated DATE 04/17/12 04/17/12 04/18/12 04/18/12 OFFICIAL RECORD COpy