Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207)
ML091320059
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Waterford, FitzPatrick  Entergy icon.png
Issue date: 05/12/2009
From: Lyon C
Watts Bar Special Projects Branch
To: Mccann J
Entergy Operations
Lyon C (415-2296)
References
TAC ME1198, TAC ME1199, TAC ME1200, TAC ME1201, TAC ME1202, TAC ME1203, TAC ME1204, TAC ME1205, TAC ME1206, TAC ME1207
Download: ML091320059 (2)


Text

From: Fred Lyon Sent: Tuesday, May 12, 2009 8:23 AM To: 'jmccan1@entergy.com' Cc: 'BYRD, RONALD W'; 'BRICE, WILLIAM B'; 'cfaison@entergy.com'

Subject:

Acceptance Review (TAC Nos. ME1198-ME1207)

By letter dated April 27, 2009, Entergy Operations, Inc., submitted a license amendment request for Arkansas Nuclear One, Units 1 and 2, Grand Gulf Nuclear Station, Indian Point Nuclear Generating Units 2 and 3, James A. FitzPatrick Nuclear Power Plant, Palisades Nuclear Plant, Pilgrim Nuclear Power Station, River Bend Station, and Waterford Steam Electric Station, Unit

3. The proposed amendment would delete those portions of Technical Specifications superseded by 10 CFR Part 26, Subpart I, consistent with NRC-approved TSTF-511.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review (TAC Nos. ME1198-ME1207)

Sent Date: 05/12/2009 8:12:33 AM Received Date: 05/12/2009 8:23:00 AM From: Fred Lyon Created By: Fred.Lyon@nrc.gov Recipients:

jmccan1@entergy.com ('jmccan1@entergy.com')

Tracking Status: None RBYRD@entergy.com ('BYRD, RONALD W')

Tracking Status: None WBRICE@entergy.com ('BRICE, WILLIAM B')

Tracking Status: None cfaison@entergy.com ('cfaison@entergy.com')

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11239 05/12/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: