Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0914704832009-05-27027 May 2009 Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders Project stage: Acceptance Review ML0915201542009-07-24024 July 2009 Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point, Palisades, Pilgrim, and Vermont Yankee Project stage: Other 2009-05-27
[Table View] |
Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, OrdersML091470483 |
Person / Time |
---|
Site: |
Palisades, Indian Point, Pilgrim, Vermont Yankee, Big Rock Point, FitzPatrick |
---|
Issue date: |
05/27/2009 |
---|
From: |
Pickett D Plant Licensing Branch 1 |
---|
To: |
Ford B Entergy Operations |
---|
Pickett , NRR/DLPM, 415-1364 |
References |
---|
TAC ME1286, TAC ME1287, TAC ME1288, TAC ME1289, TAC ME1290, TAC ME1291, TAC ME1292, TAC ME1293 |
Download: ML091470483 (2) |
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) Primary and Secondary Liability Insurance ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21188A2112021-07-0707 July 2021 Acceptance of Submittal Post-Shutdown Decommissioning Activities Report ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21111A2832021-04-21021 April 2021 Correction: Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action Re Proposed ISFSI-Only Security, Training and Qualification, Safeguards Contingency Plan ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML21082A0112021-03-23023 March 2021 Acceptance of Requested Licensing Action Amendment Request Permanently Defueled Technical Specifications ML21056A1992021-03-0101 March 2021 Acceptance of Requested Licensing Action Amendment Request Revising Surveillance Requirement 3.5.1.6 Involving Recirculation Pump Discharge Valves ML21011A1062021-01-12012 January 2021 Decommissioning International: Review and Acceptance of the Holtec Decommissioning International Fleet Decommisioning Quality Assurance Program ML20358A0702020-12-22022 December 2020 E-mail Acceptance Review for Request for Indirect License Transfer (License DPR-28, Docket No. 50-271) ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20217L3882020-08-0404 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Modify Primary Containment Isolation Valve TS (EPID L-2020-LLA-0145) (E-Mail) ML20211L7952020-07-29029 July 2020 Acceptance Review Determination (E-mail Dated 7/29/20) License Amendment Request to Revise Provisional Operating License and TS to Reflect IPEC Permanently Defueled Condition ML20204A9692020-07-22022 July 2020 Acceptance of Requested Licensing Action License Amendment Request to Adopt-TSTF-478 Revision 2 ML20188A3832020-07-0606 July 2020 Updated Completion Date for IP2 Rescission Request from Interim Compensatory Measure 8.1, Order EA-02-026 ML20149K6992020-05-28028 May 2020 Acceptance Review Determination (E-mail Dated 5/28/20) License Amendment Request for Permanently Defueled Technical Specifications ML20108E9482020-04-17017 April 2020 Acceptance Review Determination for Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device ML20079M2492020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/20) Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML20021A3802020-01-21021 January 2020 Updated E-mail 1/21/2020; Acceptance Review Determination: Proposed License Amendment City Water and Condensate Storage Tank Technical Specifications ML20002A0102019-12-30030 December 2019 Acceptance Review Determination: Proposed License Amendment City Water and Condensate Storage Tank Technical Specifications ML19295E3132019-10-22022 October 2019 Acceptance Review Determination: (E-mail 10/22/19) Relief Request IP3-IST-RR-001 for Extension of 4th 10-year IST Interval ML19288A0292019-10-11011 October 2019 NRC Acceptance Review - Northstar Request for Exemption from 10 CFR 20, App G, Section Iii.E (License DPR-28, Docket No. 50-271) ML19267A3822019-09-24024 September 2019 Acceptance Review Determination: Rescission Request from Interim Compensatory Measure 8.1, Order EA-02-026 (Epids: L-2019-LLL-0025 and L-2019-LLL-0029) ML19141A1152019-05-20020 May 2019 Acceptance Review Determination - LAR Permanently Defueled Technical Specifications (05/20/2019 E-mail) EPID: L-2019-LLA-0079 ML19141A1092019-05-20020 May 2019 Acceptance Review Determination: Exemption Request from Certain Provisions of 10 CFR 73.55 (05/20/2019 E-mail) EPID: L-2019-LLE-0010 ML19141A1072019-05-20020 May 2019 Acceptance Review Determination: Certified Fuel Handler Training Program(05/20/2019 E-mail) EPID: L-2019-LLL-0015 ML19141A1052019-05-20020 May 2019 Acceptance Review Determination: Administrative Controls for Permanently Defueled Condition(05/20/2019 E-mail) EPID: L-2019-LLA-0081 ML19141A1032019-05-20020 May 2019 Acceptance Review Determination: LAR to Revise Emergency Plan for Permanently Shut Down and Defueled Condition(05/20/2019 E-mail) EPID: L-2019-LLA-0080 ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18354A9602018-12-20020 December 2018 License Amendment Request for TS Change to Remove UHS Bar Rack Heaters ML18333A1122018-12-20020 December 2018 Acceptance Review Letter, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML18333A0092018-12-19019 December 2018 Acceptance Review Letter, Application for Order for Direct and Indirect Transfers of Control of Licenses, Conforming License Amendment, and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) ML18333A1672018-12-17017 December 2018 Acceptance Review Letter, Review of Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate ML18219A9212018-08-0707 August 2018 Acceptance Review Determination: Relief Request IP3-ISI-RR-14, Proposed Alternative to ASME Code Case N-729-4 ML18212A3482018-07-31031 July 2018 Acceptance Review Determination - LAR LAR - Deletion of License Conditions Related to Decommissioning Trust Provisions (07/31/2018 E-mail) EPID: L-2018-LLA-0180 2024-01-23
[Table view] Category:E-Mail
MONTHYEARML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) Primary and Secondary Liability Insurance ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22227A0082022-08-12012 August 2022 Acceptance Review: Exemption Request from 10CFR50.47(b), 10 CFR 50.47(c)(2), and 10 CFR Part 50, Appendix E, Section IV ML22227A0092022-08-12012 August 2022 Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme (L-2022-LLA-0099) ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22159A2672022-06-0202 June 2022 Answers to Your Questions on Palisades ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim 2024-02-01
[Table view] |
Text
From: Douglas Pickett Sent: Wednesday, May 27, 2009 2:06 PM To: 'Ford, Bryan' Cc: 'ENGLAND, LESLEY A'; John Boska; James Kim; Bhalchandra Vaidya; Mahesh Chawla; Theodore Smith; John Goshen; Michael Dusaniwskyj; Marshall David
Subject:
Acceptance Review for Entergy's Request to Extend Effectiveness of July 28, 2008, Orders
Dear Mr. Ford:
By letter dated May 15, 2009, Entergy Operations, Inc. requested an extension to the effectiveness of the Orders issued on July 28, 2008, for Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 1, 2, and 3, Palisades Nuclear Plant, Pilgrim Nuclear Power Station, and Vermont Yankee Nuclear Power Station (TAC Nos.
ME1286, ME1287, ME1288, ME1289, ME1290, ME1291, ME1292, and ME1293). The NRCs Orders dated July 28, 2008, consented to the indirect transfer of control of the licenses of the above facilities pursuant to Section 50.80 of Title 10 of the Code of Federal Regulations in connection with a proposed corporate restructuring and establishment of Enexus Energy Corporation. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plants.
The NRC staff has reviewed your application and concludes that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.
Douglas V. Pickett, Senior Project Manager Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance Review for Entergy's Request to Extend Effectiveness of July 28, 2008, Orders Sent Date: 05/27/2009 1:40:22 PM
Received Date: 05/27/2009 2:05:00 PM From: Douglas Pickett Created By: Douglas.Pickett@nrc.gov Recipients:
BFord@entergy.com ('Ford, Bryan')
Tracking Status: None LENGLAN@entergy.com ('ENGLAND, LESLEY A')
Tracking Status: None John.Boska@nrc.gov (John Boska)
Tracking Status: None James.Kim@nrc.gov (James Kim)
Tracking Status: None Bhalchandra.Vaidya@nrc.gov (Bhalchandra Vaidya)
Tracking Status: None Mahesh.Chawla@nrc.gov (Mahesh Chawla)
Tracking Status: None Theodore.Smith@nrc.gov (Theodore Smith)
Tracking Status: None John.Goshen@nrc.gov (John Goshen)
Tracking Status: None Michael.Dusaniwskyj@nrc.gov (Michael Dusaniwskyj)
Tracking Status: None Marshall.David@nrc.gov (Marshall David)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 17164 05/27/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: