ML19141A109

From kanterella
Jump to navigation Jump to search

Acceptance Review Determination: Exemption Request from Certain Provisions of 10 CFR 73.55 (05/20/2019 E-mail) EPID: L-2019-LLE-0010
ML19141A109
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/20/2019
From: Richard Guzman
Plant Licensing Branch 1
To: Robert Walpole
Entergy Nuclear Operations
Guzman R, NRR/DORL/LPL1
References
EPID: L-2019-LLE-0010
Download: ML19141A109 (2)


Text

From: Guzman, Richard To: Walpole, Robert Cc: RidsNRRLIC109 Resource; Danna, James

Subject:

Indian Point Unit Nos. 2 and 3 - Acceptance Review Determination: Exemption Request from Specific Provisions in 10 CFR 73.55 (EPID: L-2019-LLE-0010)

Date: Monday, May 20, 2019 12:42:39 PM

Bob, By letter dated April 15, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19105B237), Entergy Nuclear Operations, Inc. (the licensee) requested an exemption from 10 CFR 73.55(p)(1)(i) and 10 CFR 73.55(p)(1)(ii), related to the suspension of security measures in an emergency or during severe weather for Indian Point Unit Nos. 2 and 3.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this exemption request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review for this licensing action. The acceptance review is also intended to identify whether the exemption request has any readily apparent information insufficiencies in the characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your exemption request and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 60 hours2.5 days <br />0.357 weeks <br />0.0822 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months from the date of this e-mail communication. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date (greater than a month) or significant changes in the forecasted hours (greater than 25%), the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Rich Guzman

Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov