Category:Code Relief or Alternative
MONTHYEARML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval ML20036F2612020-03-0404 March 2020 Approval of Relief Request 1-RR-13 and 2-RR-13 Regarding Extension of Inspection Interval for Point Beach Unit 1 and Unit 2 Reactor Pressure Vessel Welds from 10 to 20 Years ML19339H7472019-12-13013 December 2019 Approval of Relief Request 2-RR-17 Regarding Steam Generator Primary Nozzle Dissimilar Metal Welds Inspection Interval ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16063A0582016-03-22022 March 2016 Approval of Relief Request 2-RR-11; Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection ML15246A3052015-09-16016 September 2015 Evaluation of Relief Request RR-10 - Examination of Feedwater Nozzle Extension to Nozzle Weld Fifth 10-Year Inservice Program Interval ML15127A2912015-05-20020 May 2015 Relief Request RR-8, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Examination of Buried Components NRC 2015-0025, Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B2015-05-14014 May 2015 Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B ML15099A0182015-05-0707 May 2015 Relief Request RR-9, Proposed Alternative from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for System Leakage Test ML14343A0512014-12-10010 December 2014 Relief from the Requirements of the ASME Code for Re-Examination of the Reactor Pressure Vessel a Inlet Nozzle Weld for the Fifth Ten-Year Inservice Inspection Program Interval ML13329A0312013-12-20020 December 2013 Relief from the Requirements of ASME B&PV Code, Section XI, for the Fourth 10-Year ISI Interval (RR-4L1) NRC 2013-0020, CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval2013-03-19019 March 2013 CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval ML13079A1412013-03-19019 March 2013 CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval ML13064A4252013-03-18018 March 2013 Relief Request 1-RR-4 Re-Examination of the Unit 1 RPV Indication on the a Inlet Nozzle Weld ML12286A1042012-11-15015 November 2012 Evaluation of Relief Requests RR-2 & RR-3 (ME7974 & ME7975) ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 ML0527001972006-01-18018 January 2006 Relief Request - Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2 ML0526503122005-09-27027 September 2005 Relief Requests - the Previsions of ASME Section XI, IWA-5244, Buried Components, RR-1-26 and RR-2-34 NRC 2005-0084, Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 22005-07-0101 July 2005 Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2 NRC 2005-0016, Relief Request from the Provisions of ASME Section Xl, IWA-4422.2.2, Defect Removal Followed by Welding or Brazing, Relief Request 162005-02-0404 February 2005 Relief Request from the Provisions of ASME Section Xl, IWA-4422.2.2, Defect Removal Followed by Welding or Brazing, Relief Request 16 NRC 2005-0015, Relief Request from the Provisions of ASME Section XI, IWA-5244, Buried Components, Relief Request 152005-01-21021 January 2005 Relief Request from the Provisions of ASME Section XI, IWA-5244, Buried Components, Relief Request 15 ML0408601612004-04-0101 April 2004 Request for Relief VRR 03-01 on a One Time Basis for Performing Inservice Testing of Relief Valve 1RH-861C ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0323104022003-09-10010 September 2003 Relief, MR 02 018-2 Pertaining to Reactor Vessel Closure Head Penetration Repair ML0306203282003-03-21021 March 2003 Relief, Use of Code Case N-600 for the Fourth 10-Year Interval, MB5403 and MB5404 ML0225401092003-03-21021 March 2003 Relief Request No 8 - Requirement for Scheduling of Components for Examination ML0302101262003-02-27027 February 2003 Relief, Alternative to Examine All Three Vessels of the Regenerative Heat Exchanger, MB5401 & MB5402 ML0225300062002-10-0808 October 2002 Code Relief, ASME Code Section XI, Relief Request 5 Regarding Visual Examination of Insulted Bolting on Borated Systems ML0225300232002-10-0808 October 2002 Relief, Granted for ASME Code Section XI, Relief Request 6 Regarding Evaluation of Leakage with Bolting In-Place NRC 2002-0073, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-22002-08-28028 August 2002 Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-2 2023-11-09
[Table view] Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-2022-161, U1R40 Steam Generator Tube Inspection Report2022-10-13013 October 2022 U1R40 Steam Generator Tube Inspection Report NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan L-2022-124, Refueling Outage U1R40 Owner'S Activity Report (OAR-1) for Inservice Inspections2022-07-20020 July 2022 Refueling Outage U1R40 Owner'S Activity Report (OAR-1) for Inservice Inspections NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2019-0040, Owner'S Activity Report: 48th Year Iwl for Class CC Examinations2019-12-18018 December 2019 Owner'S Activity Report: 48th Year Iwl for Class CC Examinations NRC 2019-0020, Refueling Outage U1 R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2019-07-11011 July 2019 Refueling Outage U1 R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2018-0005, Refueling Outage U1R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2018-01-26026 January 2018 Refueling Outage U1R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2017-0046, Spring 2017 (U2R35) Steam Generator Tube Inspection Report2017-09-21021 September 2017 Spring 2017 (U2R35) Steam Generator Tube Inspection Report NRC 2017-0030, Refueling Outage U2R35 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2017-07-12012 July 2017 Refueling Outage U2R35 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2016-0044, Spring 2016 U1R36 180-Day Steam Generator Tube Inspection Report2016-09-20020 September 2016 Spring 2016 U1R36 180-Day Steam Generator Tube Inspection Report NRC 2016-0026, Refueling Outage U1 R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2016-06-30030 June 2016 Refueling Outage U1 R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2016-0004, Refueling Outage U2R34 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2016-01-26026 January 2016 Refueling Outage U2R34 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2015-0025, Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B2015-05-14014 May 2015 Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B NRC 2015-0010, Filing of Owner'S Inservice Inspection Summary Report for Tendon Surveillance and Concrete Containment Examinations2015-02-27027 February 2015 Filing of Owner'S Inservice Inspection Summary Report for Tendon Surveillance and Concrete Containment Examinations NRC 2015-0009, Filing of Owner'S Inservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Refueliong Outage U1R352015-01-29029 January 2015 Filing of Owner'S Inservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Refueliong Outage U1R35 NRC 2015-0008, Filing of Owner'S Inservice Inspection Summary Report Class 1, 2 and 3 for Refueling Outage U1R352015-01-29029 January 2015 Filing of Owner'S Inservice Inspection Summary Report Class 1, 2 and 3 for Refueling Outage U1R35 NRC 2014-0048, Submittal of Filing of Owner'S Lnservice Inspection Summary Report Class 1, 2 and 3 for Refueling Outage U2R332014-07-15015 July 2014 Submittal of Filing of Owner'S Lnservice Inspection Summary Report Class 1, 2 and 3 for Refueling Outage U2R33 NRC 2014-0049, Submittal of Filing of Owner'S Inservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Refueling Outage U2R332014-07-15015 July 2014 Submittal of Filing of Owner'S Inservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Refueling Outage U2R33 NRC 2014-0022, 10 CFR 50.55a Requests Relief Requests RR-8 and RR-9 Fifth Ten-Year Lnservice Inspection Program Interval2014-05-13013 May 2014 10 CFR 50.55a Requests Relief Requests RR-8 and RR-9 Fifth Ten-Year Lnservice Inspection Program Interval NRC 2013-0108, Response to 10 CFR 50.54(f) Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns2013-11-27027 November 2013 Response to 10 CFR 50.54(f) Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns NRC 2013-0067, Spring 2013 Unit 1(U1R34) Steam Generator Tube Inspection Report2013-09-24024 September 2013 Spring 2013 Unit 1(U1R34) Steam Generator Tube Inspection Report NRC-2013-0008, Submittal of Fall 2012 Steam Generator Tube Inspection Report2013-05-16016 May 2013 Submittal of Fall 2012 Steam Generator Tube Inspection Report NRC 2013-0018, CFR 50.55a Request. Relief Request RR-4L1 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspections Program Interval2013-03-19019 March 2013 CFR 50.55a Request. Relief Request RR-4L1 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspections Program Interval NRC 2013-0016, Filing of Owner'S Inservice Inspection Summary Report, IWE Class Mc and Iwl Class CC for Refueling Outage U2R322013-02-19019 February 2013 Filing of Owner'S Inservice Inspection Summary Report, IWE Class Mc and Iwl Class CC for Refueling Outage U2R32 NRC 2013-0015, Filing of Owner'S Lnservice Lnspection Summary Report Class 1, 2 and 3 for Refueling Outage U2R322013-02-19019 February 2013 Filing of Owner'S Lnservice Lnspection Summary Report Class 1, 2 and 3 for Refueling Outage U2R32 NRC 2013-0009, Fall 2011 Refueling Outage (U1R33) Steam Generator Tube Inspection Report2013-01-31031 January 2013 Fall 2011 Refueling Outage (U1R33) Steam Generator Tube Inspection Report NRC 2012-0075, Fifth Interval Inservice Inspection Program Plan and Schedule2012-09-10010 September 2012 Fifth Interval Inservice Inspection Program Plan and Schedule NRC 2012-0015, Fall 2011 Unit 1 (U1R33) Steam Generator Tube Inspection Report2012-05-29029 May 2012 Fall 2011 Unit 1 (U1R33) Steam Generator Tube Inspection Report NRC 2012-0019, Filing of Owner'S Class 1, 2, and 3 Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R332012-03-0707 March 2012 Filing of Owner'S Class 1, 2, and 3 Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R33 NRC 2012-0014, Filing of Owner'S Containment Inservice Inspection Summary Report for Refueling Outage U1R332012-03-0202 March 2012 Filing of Owner'S Containment Inservice Inspection Summary Report for Refueling Outage U1R33 NRC 2012-0011, CFR 50.55a Request, Relief Requests RR-2 and RR-3, Fifth Ten-Year Inservice Inspection Program Interval2012-02-15015 February 2012 CFR 50.55a Request, Relief Requests RR-2 and RR-3, Fifth Ten-Year Inservice Inspection Program Interval NRC 2011-0083, Filing of Owner'S Inservice Inspection Summary Report for Refueling Outrage U2R312011-09-12012 September 2011 Filing of Owner'S Inservice Inspection Summary Report for Refueling Outrage U2R31 NRC 2011-0084, Filing of Owner'S Lnservice Inspection Summary Report for Refueling Outage U2R312011-09-12012 September 2011 Filing of Owner'S Lnservice Inspection Summary Report for Refueling Outage U2R31 NRC 2010-0096, Filing of Owner'S Inservice Inspection Summary Report Refueling Outage U1R322010-06-25025 June 2010 Filing of Owner'S Inservice Inspection Summary Report Refueling Outage U1R32 NRC 2010-0094, Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U1R322010-06-24024 June 2010 Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U1R32 ML1004707792010-02-11011 February 2010 Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refuleing Outage U2R30 NRC 2009-0014, Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U1R312009-02-10010 February 2009 Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U1R31 NRC 2008-0043, Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U2R292008-08-0404 August 2008 Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U2R29 NRC 2008-0017, CFR 50.55a Request, Relief Request RR-21, Examination of the Reactor Pressure Vessels, Fourth Ten-Year Inservice Inspection Program Interval2008-03-14014 March 2008 CFR 50.55a Request, Relief Request RR-21, Examination of the Reactor Pressure Vessels, Fourth Ten-Year Inservice Inspection Program Interval ML0724806122007-09-20020 September 2007 Forth 10-Year Interval Inservice Inspection Request for Relief No. 15, Alternate Methods for Pressure Testing of Buried Components NRC 2007-0059, Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R302007-08-0606 August 2007 Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R30 NRC 2007-0048, Correction to Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U2R272007-06-15015 June 2007 Correction to Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U2R27 NRC 2007-0020, 10 CFR 50.55a Requests, Relief Requests RR-18, RR-19 and RR-20 Associated with Examination of the Reactor Pressure Vessels Fourth Ten-Year Inservice Inspection Program Interval2007-04-0606 April 2007 10 CFR 50.55a Requests, Relief Requests RR-18, RR-19 and RR-20 Associated with Examination of the Reactor Pressure Vessels Fourth Ten-Year Inservice Inspection Program Interval NRC 2007-0009, Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U2R282007-02-19019 February 2007 Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U2R28 NRC-2006-0078, 10 CFR 50.55a Request, Resubmittal of Relief Request 15, Fourth Ten-Year Interval Inservice Inspection (ISI) Program2006-11-20020 November 2006 10 CFR 50.55a Request, Resubmittal of Relief Request 15, Fourth Ten-Year Interval Inservice Inspection (ISI) Program NRC 2006-0019, Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R292006-02-22022 February 2006 Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R29 NRC 2006-0001, Request to Use Subsequent Edition and Addenda of ASME Code for Inservice Testing2006-01-20020 January 2006 Request to Use Subsequent Edition and Addenda of ASME Code for Inservice Testing NRC 2005-0132, Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U2R272005-10-11011 October 2005 Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U2R27 2022-09-30
[Table view] Category:Letter type:NRC
MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] |